CN104773473B - A kind of big mount vibration disk - Google Patents
A kind of big mount vibration disk Download PDFInfo
- Publication number
- CN104773473B CN104773473B CN201510144360.3A CN201510144360A CN104773473B CN 104773473 B CN104773473 B CN 104773473B CN 201510144360 A CN201510144360 A CN 201510144360A CN 104773473 B CN104773473 B CN 104773473B
- Authority
- CN
- China
- Prior art keywords
- transportation section
- suspension
- big
- section
- suspension transportation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jigging Conveyors (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种物料输送装置,尤其是涉及一种将大支架有序排列输送的振动盘。The invention relates to a material conveying device, in particular to a vibrating plate for orderly arranging and conveying large supports.
背景技术Background technique
大支架作为断路器中使用的支架组件的主体部分,其结构相对较大较复杂。如图3所示,其犹如一个“[”形又在左下方加上一个横板。由于其结构较大,容易在制造或者运送的过程中造成其变形,变形的大支架如果不能筛选出来去除掉,之后加工出来的支架组件将会产生报废品,影响生产效率和产品质量。另一方面,传统的焊接工艺由人工将接线板排序进行焊接,不仅浪费人力,而且工作效率低,浪费时间。在自动焊接支架组件的过程中,变形的大支架将无法与机械手、夹具等自动化部件配合,有可能造成机器的卡死,影响自动化的生产效率。As the main part of the bracket assembly used in the circuit breaker, the large bracket has a relatively large and complicated structure. As shown in Figure 3, it is like a "[" shape and a horizontal plate is added on the lower left. Due to its large structure, it is easy to cause its deformation during the process of manufacturing or transportation. If the deformed large bracket cannot be screened out and removed, the bracket assembly processed later will produce scrap products, which will affect production efficiency and product quality. On the other hand, the traditional welding process manually sorts the wiring boards for welding, which not only wastes manpower, but also has low work efficiency and wastes time. In the process of automatic welding of bracket components, the deformed large bracket will not be able to cooperate with automation components such as manipulators and fixtures, which may cause the machine to be stuck and affect the production efficiency of automation.
发明内容Contents of the invention
本发明的目的是克服现有技术的不足,提供一种自动筛选排序,并可检测变形工件并去除,有序输送的大支架振动盘。The purpose of the present invention is to overcome the deficiencies of the prior art, to provide a large bracket vibrating plate that can automatically sort and detect deformed workpieces and remove them, and deliver them in an orderly manner.
本发明采用以下技术方案:一种大支架振动盘,包括底盘、料斗和送料轨道,底盘与驱动器相连接,底盘上设置圆筒形的料斗,料斗内壁具有螺旋上升的送料道,送料道的上端出口连接送料轨道,送料轨道包括带有侧壁的散乱输送段和不带侧壁的第一悬挂输送段,第一悬挂输送段上依次设置有筛选机构、翻面机构、阻挡机构和吹料机构;大支架由散乱输送段输送至第一悬挂输送段悬挂在第一悬挂输送段的侧边输送,筛选机构设置在悬挂的一侧阻挡筛选悬挂错误的大支架,翻面机构将大支架翻面,阻挡机构阻挡与其不匹配的大支架并由吹料机构吹离送料轨道。The present invention adopts the following technical solutions: a vibrating plate with a large support, including a chassis, a hopper and a feeding track, the chassis is connected to the driver, a cylindrical hopper is arranged on the chassis, the inner wall of the hopper has a spirally rising feeding channel, and the upper end of the feeding channel The outlet is connected to the feeding track. The feeding track includes a random conveying section with side walls and a first hanging conveying section without side walls. The first hanging conveying section is provided with a screening mechanism, a turning mechanism, a blocking mechanism and a blowing mechanism in sequence. The large bracket is transported from the scattered conveying section to the first hanging conveying section and is suspended on the side of the first hanging conveying section for conveying. The screening mechanism is set on the side of the suspension to prevent the screening of the wrong large bracket, and the turning mechanism turns the large bracket over. , the blocking mechanism blocks the large bracket that does not match it and is blown away from the feeding track by the blowing mechanism.
作为一种改进,送料轨道还包括有第二悬挂输送段,第二悬挂输送段与第一悬挂输送段相连接,第一悬挂输送段和第二悬挂输送段的倾斜方向相反。As an improvement, the feeding track further includes a second suspended conveying section, the second suspended conveying section is connected to the first suspended conveying section, and the inclination directions of the first suspended conveying section and the second suspended conveying section are opposite.
作为一种改进,第二悬挂输送段的末端螺旋至垂直于水平面形成输出段,输出段相邻的设置有平行挡板,平行挡板与输出段的距离与大支架的厚度相匹配。As an improvement, the end of the second suspension conveying section spirals to be perpendicular to the horizontal plane to form an output section, and parallel baffles are arranged adjacent to the output section, and the distance between the parallel baffles and the output section matches the thickness of the large bracket.
作为一种改进,阻挡机构为设置在第一悬挂输送段下方的与第一悬挂输送段相垂直的挡块,挡块在相对第一悬挂输送段的两侧设置有与大支架形状相匹配的垂直槽,第一悬挂输送段的宽度与大支架的长度相匹配。As an improvement, the blocking mechanism is a stopper perpendicular to the first suspension conveying section arranged below the first suspension conveying section, and the stopper is provided with a shape matching the large bracket on both sides of the first suspended conveying section. Vertical trough, the width of the first suspended conveying section matches the length of the large support.
作为一种改进,吹料机构设置在第一悬挂输送段的下方,位置与挡块相适应;第一悬挂输送段上设置有与吹料机构相匹配的吹料孔。As an improvement, the blowing mechanism is arranged below the first suspension conveying section, and the position is adapted to the stopper; the first hanging conveying section is provided with a blowing hole matching the blowing mechanism.
作为一种改进,翻面机构为具有高度差的轨道结构,高处轨道的末端设置有与大支架上开口位置相对应的突块,翻面机构处相对大支架悬挂的另一侧设置有挡片。As an improvement, the turning mechanism is a rail structure with a height difference. The end of the high track is provided with a protrusion corresponding to the opening position on the large bracket. piece.
作为一种改进,筛选机构为设置在悬挂一侧的下方的弧形挡板,第一悬挂输送段上与弧形挡板位置相对应的一段轨道窄于其他位置的轨道。As an improvement, the screening mechanism is an arc-shaped baffle arranged under one side of the suspension, and a section of track corresponding to the position of the arc-shaped baffle on the first suspension conveying section is narrower than the tracks at other positions.
作为一种改进,散乱输送段上设置有导槽,导槽沿着输送方向延伸至第一悬挂输送段的悬挂一侧,散乱输送段的内侧边逐渐变窄至第一悬挂输送段的悬挂一侧。As an improvement, a guide groove is provided on the scattered conveying section, and the guide groove extends to the hanging side of the first hanging conveying section along the conveying direction, and the inner side of the scattered conveying section gradually narrows to the hanging side of the first hanging conveying section. side.
本发明的有益效果:大支架在进入送料轨道后因其特殊的结构会悬挂在一侧向前振动输送,在到达筛选机构时,悬挂错误的大支架会由筛选机构顶落脱离送料轨道;在到达翻面机构时,翻转至另一面朝下悬挂继续输送;在到达阻挡机构和吹料机构时,有变形的大支架不能与阻挡机构相匹配,因此会卡在阻挡机构处,吹料机构检测到有大支架停留并超过一段时间后,将工作即吹气把变形的大支架吹掉,而标准的大支架能顺利通过阻挡机构输送出去。本发明的振动盘结构简单,在实现对大支架筛选排序的同时,增加了对变形件的检测剃除,保证了产品质量,也为后序自动化加工的流畅性提供了保障。Beneficial effects of the present invention: after the large bracket enters the feeding track, it will be suspended on one side due to its special structure and vibrated forwardly, and when it reaches the screening mechanism, the wrongly suspended large bracket will fall off the feeding track from the screening mechanism; When it reaches the turning mechanism, turn it over to the other side and hang it down to continue conveying; when it reaches the blocking mechanism and the blowing mechanism, the deformed large bracket cannot match the blocking mechanism, so it will be stuck at the blocking mechanism, and the blowing mechanism After detecting that a large stent stays for a period of time, it will work and blow off the deformed large stent, while the standard large stent can be smoothly transported out through the blocking mechanism. The vibrating plate of the present invention has a simple structure. While realizing the screening and sorting of large brackets, it increases the detection and removal of deformed parts, ensures product quality, and also provides a guarantee for the smoothness of subsequent automatic processing.
附图说明Description of drawings
图1是本发明大支架振动盘的立体图。Fig. 1 is a perspective view of a vibrating plate with a large support in the present invention.
图2是本发明大支架振动盘的俯视图。Fig. 2 is a top view of the large support vibrating plate of the present invention.
图3是本发明的大支架的立体图。Fig. 3 is a perspective view of the large bracket of the present invention.
具体实施方式detailed description
以下结合附图对本发明的具体实施例做详细说明。Specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings.
如图1、2所示,为本发明大支架振动盘的一种具体实施例。该实施例包括底盘1、料斗2和送料轨道3,底盘1与驱动器相连接,底盘1上设置圆筒形的料斗2,料斗2内壁具有螺旋上升的送料道21,送料道21的上端出口连接送料轨道3,送料轨道3包括带有侧壁的散乱输送段31和不带侧壁的第一悬挂输送段32,第一悬挂输送段32上依次设置有筛选机构3a、翻面机构3b、阻挡机构3c和吹料机构3d。如图3所示,为了更好的说明大支架的输送过程,将大支架分为主体z1、上架z2、下架z3和下横板z4,主体z1上具有一个开口z5,上架z2和下架z3在同一侧并长于下横板z4,且下横板z4比上架z2和下架z3在要窄。As shown in Figures 1 and 2, it is a specific embodiment of the vibrating plate of the large support of the present invention. This embodiment comprises chassis 1, hopper 2 and feeding track 3, and chassis 1 is connected with driver, and cylindrical hopper 2 is arranged on chassis 1, and the inner wall of hopper 2 has the feeding channel 21 that spirals up, and the upper end outlet of feeding channel 21 is connected Feeding track 3, feeding track 3 comprises the random conveying section 31 that has sidewall and the first hanging conveying section 32 that does not have sidewall, is provided with screening mechanism 3a, flipping mechanism 3b, blocking mechanism successively on the first hanging conveying section 32. Mechanism 3c and blowing mechanism 3d. As shown in Figure 3, in order to better illustrate the delivery process of the large bracket, the large bracket is divided into a main body z1, an upper shelf z2, a lower shelf z3, and a lower horizontal plate z4. The main body z1 has an opening z5, and the upper shelf z2 and the lower shelf z3 is on the same side and longer than the lower horizontal plate z4, and the lower horizontal plate z4 is narrower than the upper frame z2 and the lower frame z3.
在使用振动盘时,将待筛选的批量大支架放入料斗2中,驱动器振动带动底盘1振动,大支架通过振动沿着送料道21输送至送料轨道3;大支架由首先到达散乱输送段31,此时大支架都是无序的。作为一种改进的具体实施方式,散乱输送段31上设置有导槽311,导槽311沿着输送方向延伸至第一悬挂输送段32的悬挂一侧。导槽311设置的匹配下横板z4的宽度,但小于上架z2和下架z3的宽度,使下横板z4更容易落入导槽311,一直输送到一悬挂输送段32时可以顺利悬挂在侧边进行输送。当然较长的导槽311也能容纳下上架z2和下架z3,导槽311提高了大支架到达第一悬挂输送段32时的悬挂成功率。散乱输送段31的内侧边逐渐变窄至第一悬挂输送段32的悬挂一侧,使悬挂在散乱输送段31侧边的大支架能顺着变窄的轨道到达第一悬挂输送段32,从而提高大支架到达第一悬挂输送段32时的悬挂成功率,从而整体上提高大支架输送的效率。When using the vibrating plate, put the batch of large brackets to be screened into the hopper 2, the driver vibrates to drive the chassis 1 to vibrate, and the large brackets are transported to the feeding track 3 along the feeding channel 21 through the vibration; the large brackets first arrive at the scattered conveying section 31 , then the large brackets are disordered. As an improved embodiment, the random conveying section 31 is provided with a guide groove 311 , and the guide groove 311 extends to the hanging side of the first suspended conveying section 32 along the conveying direction. The guide groove 311 is set to match the width of the lower horizontal plate z4, but is smaller than the width of the upper shelf z2 and the lower shelf z3, so that the lower horizontal plate z4 can fall into the guide groove 311 more easily, and can be successfully suspended when it is transported to a suspension conveying section 32. Conveying on the side. Of course, the longer guide groove 311 can also accommodate the lower upper frame z2 and the lower frame z3, and the guide groove 311 improves the success rate of hanging when the large bracket reaches the first suspension conveying section 32 . The inner side of the scattered conveying section 31 gradually narrows to the suspension side of the first suspended conveying section 32, so that the large support suspended on the side of the scattered conveying section 31 can reach the first suspended conveying section 32 along the narrowed track, Thereby, the success rate of hanging when the large bracket reaches the first suspension conveying section 32 is improved, thereby improving the efficiency of large bracket transportation as a whole.
进入第一悬挂输送段32的大支架首先到达筛选机构3a,作为一种改进的具体实施方式,筛选机构3a为设置在悬挂一侧的下方的弧形挡板,第一悬挂输送段32上与弧形挡板位置相对应的一段轨道窄于其他位置的轨道。悬挂正确的大支架下横板z4悬挂在侧边,下横板z4比较短,在输送的过程中不会受到弧形挡板的干扰,可顺利通过弧形挡板,窄轨道也不会影响其顺利通过。但悬挂错误的大支架上架z2和下架z3悬挂在侧边,其相比下横板z4较长的结构会在到达弧形挡板时被顶起,且窄轨道进一步使其重心偏移最后从筛选机构3a处掉落,实现了对大支架正确悬挂输送的筛选,结构简单,便于制造。The large support that enters the first hanging conveying section 32 first arrives at the screening mechanism 3a. As an improved specific embodiment, the screening mechanism 3a is an arc-shaped baffle arranged under one side of the suspension, and the first hanging conveying section 32 is connected to A section of track corresponding to the position of the arc baffle is narrower than the track at other positions. The lower horizontal plate z4 of the large bracket with correct suspension is hung on the side, and the lower horizontal plate z4 is relatively short, so it will not be disturbed by the arc-shaped baffle during the conveying process, and can pass through the arc-shaped baffle smoothly, and the narrow track will not affect It passed without a hitch. However, the wrong large bracket hangs the upper frame z2 and the lower frame z3 on the side, and its longer structure than the lower horizontal plate z4 will be jacked up when it reaches the curved baffle, and the narrow track further shifts the center of gravity. Falling from the screening mechanism 3a realizes the screening of the large brackets for hanging and conveying correctly, and has a simple structure and is convenient for manufacture.
大支架在经过筛选机构3a后到达翻面机构3b,作为一种改进的具体实施方式,翻面机构3b为具有高度差的轨道结构,高处轨道的末端设置有与大支架上开口z5位置相对应的突块3b1,翻面机构3b处相对大支架悬挂的另一侧设置有挡片3b2。大支架到达高处轨道末端时慢慢脱离向下翻落时,开口z5下翻后的一边会挂在突块3b1上,当大支架随着重力翻转大于90度以后,开口z5的边缘向外甩动脱离突块3b1,使大支架掉落至低处轨道上。突块3b1的设计与大支架的结构匹配,令开口z5处挂于突块3b1处进行翻转提高了翻转的成功率,且结构简单便于制造;令一方面设计挡片3b2来支撑轨道上的大支架,使其在翻转过程中只沿轨道方向翻转,而不会向着两侧有转动,进一步提高了翻转的成功率,上架z2和下架z3朝下可准确落到轨道上悬挂配合继续输送。The large bracket reaches the turning mechanism 3b after passing through the screening mechanism 3a. As an improved specific embodiment, the turning mechanism 3b is a track structure with a height difference. Corresponding to the protruding block 3b1, the other side of the turning mechanism 3b relative to the suspension of the large bracket is provided with a blocking piece 3b2. When the large bracket reaches the end of the track at a high place and slowly falls away, the turned side of the opening z5 will hang on the protrusion 3b1. When the large bracket turns over 90 degrees with the gravity, the edge of the opening z5 will be outward Swing and break away from the protrusion 3b1, so that the large support falls onto the lower track. The design of the protruding block 3b1 matches the structure of the large bracket, so that the opening z5 is hung on the protruding block 3b1 for flipping to improve the success rate of flipping, and the structure is simple and easy to manufacture; The bracket makes it only flip along the direction of the track during the flipping process, without turning to both sides, which further improves the success rate of flipping. The upper shelf z2 and the lower shelf z3 can accurately fall onto the track and hang to continue conveying.
大支架在经过翻面机构3b后到达阻挡机构3c和吹料机构3d,作为一种改进的具体实施方式,阻挡机构3c为设置在第一悬挂输送段32下方的与第一悬挂输送段32相垂直的挡块3c1,挡块3c1在相对第一悬挂输送段32的两侧设置有与大支架形状相匹配的垂直槽3c2,第一悬挂输送段32的宽度与大支架的长度相匹配;吹料机构3d设置在第一悬挂输送段32的下方,位置与挡块3c1相适应;第一悬挂输送段32上设置有与吹料机构3d相匹配的吹料孔35。标准的大支架上架z2、下架z与主体z1都是90度的夹角,大支架与第一悬挂输送段32同宽使大支架的位置在输送时被良好限定,上架z2和下架z从两侧向下垂直悬挂,设置带有垂直槽3c2的挡块3c1与上架z2、下架z相配合;当大支架到达阻挡机构3c时,标准的大支架可以顺利通过垂直槽3c2,变形的大支架上架z2、下架z与主体z1的夹角或大或小,都会卡在挡块3c1处,吹料机构3d检测到有大支架停留并超过一段时间后,将工作即从吹料孔35处向上吹气把变形的大支架吹掉。上述阻挡机构3c结构简单便于制造,且机械筛选的结构可供长期使用,吹气的方式吹除废料可靠性高,与阻挡机构3c的配合良好的实现了筛选的功能,确保了后序加工中大支架的标准化,提高成品率和生产效率;可方便控制吹料机构3d的工作反应时间,保证大支架检测正确率和大支架及时有序输送两者的平衡。The large bracket reaches the blocking mechanism 3c and the blowing mechanism 3d after passing through the turning mechanism 3b. As an improved specific embodiment, the blocking mechanism 3c is arranged below the first hanging conveying section 32 and is opposite to the first hanging conveying section 32. Vertical stopper 3c1, stopper 3c1 is provided with the vertical groove 3c2 that matches with the shape of large support on both sides relative to the first suspension conveying section 32, the width of the first suspension conveying section 32 matches the length of the large support; The feeding mechanism 3d is arranged below the first hanging conveying section 32, and its position is adapted to the block 3c1; the first hanging conveying section 32 is provided with a blowing hole 35 matching the blowing mechanism 3d. The standard large bracket upper shelf z2, lower shelf z and the main body z1 are at an angle of 90 degrees. The large bracket is the same width as the first suspension conveying section 32 so that the position of the large bracket is well defined during transportation. The upper shelf z2 and the lower shelf z Hang vertically downward from both sides, and set a stopper 3c1 with a vertical groove 3c2 to cooperate with the upper frame z2 and the lower frame z; when the large bracket reaches the blocking mechanism 3c, the standard large bracket can pass through the vertical groove 3c2 smoothly, and the deformed The angle between the upper shelf z2 and the lower shelf z of the large bracket and the main body z1 is large or small, and they will be stuck at the stopper 3c1. After the blowing mechanism 3d detects that the large bracket stays for a period of time, it will start the work from the blowing hole. Blow upward at 35 to blow off the deformed large bracket. The structure of the blocking mechanism 3c is simple and easy to manufacture, and the structure of mechanical screening can be used for a long time. The blowing method of blowing off the waste has high reliability, and the good cooperation with the blocking mechanism 3c realizes the screening function and ensures The standardization of large brackets improves the yield and production efficiency; it is convenient to control the 3D working reaction time of the blowing mechanism, ensuring the balance between the correct detection rate of large brackets and the timely and orderly delivery of large brackets.
大支架在经过阻挡机构3c和吹料机构3d继续向前输送,作为一种改进的具体实施方式,送料轨道3还包括有第二悬挂输送段33,第二悬挂输送段33与第一悬挂输送段32相连接,第一悬挂输送段32和第二悬挂输送段33的倾斜方向相反;第二悬挂输送段33的末端螺旋至垂直于水平面形成输出段34,输出段34相邻的设置有平行挡板4,平行挡板4与输出段34的距离与大支架的厚度相匹配。在第一悬挂输送段32上,大支架的翻面前后是通过下架z3和下横板z4一侧悬挂在边缘,即下架z3和下横板z4所在的一侧在上方,但在大支架输出时为了下道工序的夹取输送和定位摆放,要把大支架调整成主体z1垂直于水平面,下架z3和下横板z4在下的摆放方式,如图3的摆放方式。因此首先设置了第二悬挂输送段33,在大支架从第一悬挂输送段32输送到第二悬挂输送段33时,倾斜方向的变化使大支架下落由上架z2卡住其所在侧的第二悬挂输送段33边缘,实现了第一步换向。在第二悬挂输送段33到输出段34的过程中,螺旋的结构进一步旋转大支架的摆放方向,慢慢接近主体z1垂直于水平面;第二悬挂输送段33角度变大直至输出段34时大支架的稳定由平行挡板4实现,平行挡板4良好的将大支架稳定在了输出段34,保证大支架有序的排列输出,便于连接后序的加工工序。The large bracket continues to be transported forward through the blocking mechanism 3c and the blowing mechanism 3d. As an improved specific embodiment, the feeding track 3 also includes a second suspension conveying section 33, and the second suspension conveying section 33 is connected to the first suspension conveying section 33. The section 32 is connected, and the inclination direction of the first hanging conveying section 32 and the second hanging conveying section 33 is opposite; the end of the second hanging conveying section 33 spirals to form an output section 34 perpendicular to the horizontal plane, and the adjacent output section 34 is provided with parallel The baffle plate 4, the distance between the parallel baffle plate 4 and the output section 34 matches the thickness of the large support. On the first suspension conveying section 32, the front and back of the large bracket are suspended on the edge by one side of the lower frame z3 and the lower horizontal plate z4, that is, the side where the lower frame z3 and the lower horizontal plate z4 are located is above, but on the large When the support is output, for the clamping, transportation and positioning of the next process, the large support should be adjusted so that the main body z1 is perpendicular to the horizontal plane, and the lower shelf z3 and the lower horizontal plate z4 are placed below, as shown in Figure 3. Therefore at first the second suspension conveying section 33 is provided, and when the large support is transported from the first suspended conveying section 32 to the second suspended conveying section 33, the change in the direction of inclination makes the large support fall and be blocked by the upper frame z2 on the second suspension on its side. Suspension conveying section 33 edges have realized the first step commutation. During the process from the second suspension conveying section 33 to the output section 34, the helical structure further rotates the placement direction of the large bracket, slowly approaching the main body z1 to be perpendicular to the horizontal plane; the angle of the second suspended conveying section 33 becomes larger until the output section 34 The stability of the large bracket is realized by the parallel baffle 4, which stabilizes the large bracket in the output section 34 well, ensures that the large bracket is arranged and output in an orderly manner, and is convenient for connection to subsequent processing procedures.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510144360.3A CN104773473B (en) | 2015-03-30 | 2015-03-30 | A kind of big mount vibration disk |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510144360.3A CN104773473B (en) | 2015-03-30 | 2015-03-30 | A kind of big mount vibration disk |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104773473A CN104773473A (en) | 2015-07-15 |
| CN104773473B true CN104773473B (en) | 2017-06-16 |
Family
ID=53615293
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510144360.3A Expired - Fee Related CN104773473B (en) | 2015-03-30 | 2015-03-30 | A kind of big mount vibration disk |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104773473B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106984973A (en) * | 2017-05-15 | 2017-07-28 | 温州市世锋五金索具有限公司 | A kind of carbine blank vibrating disk and a kind of full-automatic carbine process equipment |
| CN108448369A (en) * | 2018-05-22 | 2018-08-24 | 倍仕得电气科技(杭州)股份有限公司 | A kind of cable fixing head locknut feeding equipment |
| CN110252665B (en) * | 2019-07-24 | 2024-03-19 | 温州市翔潮汽车零部件有限公司 | Automatic rivet screening device |
| CN112141419B (en) * | 2020-09-29 | 2025-02-11 | 勤钦精密工业(昆山)有限公司 | Semi-automatic plate placing machine |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS59128113A (en) * | 1983-01-14 | 1984-07-24 | Shinko Electric Co Ltd | Part inside and outside arranging device in oscillation part feeder |
| JPS6071419A (en) * | 1983-09-29 | 1985-04-23 | Shinko Electric Co Ltd | Parts aligning/feeding device in parts supplying vibration machine |
| CN102275716A (en) * | 2011-05-14 | 2011-12-14 | 广东格兰仕集团有限公司 | Material plate of automatic feeding device |
| CN202072243U (en) * | 2011-05-19 | 2011-12-14 | 佛山市顺德区格兰仕微波炉电器有限公司 | Tray for automatic feeding device |
| CN203079220U (en) * | 2013-02-05 | 2013-07-24 | 浙江中环赛特光伏科技有限公司 | Base vibrating disc of automatic triangular spring assembly machine |
| CN203794101U (en) * | 2014-04-11 | 2014-08-27 | 产台股份有限公司 | Vibrating feeding tray |
| CN204489933U (en) * | 2015-03-30 | 2015-07-22 | 温州天基机器人自动化有限公司 | A kind of large mount vibration dish |
-
2015
- 2015-03-30 CN CN201510144360.3A patent/CN104773473B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN104773473A (en) | 2015-07-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104708324B (en) | Large support component spot welding machine | |
| CN101528567B (en) | Device for container transport having a rotating infeed disk | |
| CN203889590U (en) | Vibration plate of wiring board | |
| CN103193077B (en) | A kind of workpiece enters the automatic arrangement mechanism of load-transfer device | |
| CN206050194U (en) | Intestinal machine is put by robot | |
| CN104192551B (en) | Material pipe processing device | |
| CN210312339U (en) | Fastening screw is with sieve material loading machine | |
| CN203699289U (en) | Double-track vibration disc | |
| CN105752656A (en) | Bottle cap arranging machine | |
| CN104773473A (en) | Large bracket vibrating disk | |
| CN105712060A (en) | Feeding device | |
| CN206502316U (en) | A feeding and distributing device for small flakes | |
| CN204489933U (en) | A kind of large mount vibration dish | |
| CN204487161U (en) | A kind of large bracket component mash welder | |
| CN211970870U (en) | Material distributing device capable of accurately positioning materials | |
| CN108622601A (en) | A kind of spherical shape bottle cap automatic material management system | |
| CN205294005U (en) | Vibration plate | |
| CN107032094A (en) | Nut orients collator | |
| JPS62500928A (en) | Equipment for extracting and transporting piece-shaped articles from bulk materials | |
| CN205257275U (en) | Nut vibration dish | |
| CN213385089U (en) | Cigarette case pastes mark and rectifies stabilising arrangement | |
| CN211847088U (en) | Bottle cap detection device for sterile filling | |
| CN203959169U (en) | The special vibrating dish of pad for quartz crystal oscillator | |
| CN104016082B (en) | Sodium silicate heat material Feed system | |
| CN112061478A (en) | Box packing device of aluminum electrolytic capacitor with M-shaped lead pins |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| EXSB | Decision made by sipo to initiate substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170616 Termination date: 20180330 |