CN106013169A - Die for constructing urban mass transit turnout point switch foundation pit and construction method - Google Patents

Die for constructing urban mass transit turnout point switch foundation pit and construction method Download PDF

Info

Publication number
CN106013169A
CN106013169A CN201610576362.4A CN201610576362A CN106013169A CN 106013169 A CN106013169 A CN 106013169A CN 201610576362 A CN201610576362 A CN 201610576362A CN 106013169 A CN106013169 A CN 106013169A
Authority
CN
China
Prior art keywords
mould
piecemeal
rail
ditch
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610576362.4A
Other languages
Chinese (zh)
Other versions
CN106013169B (en
Inventor
王喜军
车爽
程保青
武长海
杨宝峰
武少峰
鞠帅
林祁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Railway Survey and Design Institute Group Corp
Original Assignee
Third Railway Survey and Design Institute Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Railway Survey and Design Institute Group Corp filed Critical Third Railway Survey and Design Institute Group Corp
Priority to CN201610576362.4A priority Critical patent/CN106013169B/en
Publication of CN106013169A publication Critical patent/CN106013169A/en
Application granted granted Critical
Publication of CN106013169B publication Critical patent/CN106013169B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention provides a die for constructing an urban mass transit turnout point switch foundation pit. The die comprises a point switch host foundation pit die block part and a rail penetrating groove die block part. The point switch host foundation pit die block part comprises six point switch host foundation pit die blocks with the same size. The rail penetrating groove die block part comprises middle rail penetrating groove die blocks and rail penetrating groove die blocks on the two sides. The point switch host foundation pit die block part and the rail penetrating groove die block part are spliced. The invention further provides a construction method of the die for constructing the urban mass transit turnout point switch foundation pit. The die and the method have the beneficial effects that the die with the uniform standard dimensions is utilized for launching the foundation pit construction project, the construction efficiency is improved, and meanwhile the labor cost of manual work is reduced; meanwhile, the reserving precision of the turnout point switch foundation pit is improved through the die, and the deviation of an original method for constructing the foundation pit is reduced to 10 mm from 50 mm; and the time of one day can be saved when each foundation pit is conducted, and the construction progress can be effectively promoted.

Description

Urban track traffic point machine foundation ditch constructs mould and construction method
Technical field
The present invention relates to urban track traffic, particularly relate to mould that urban track traffic point machine foundation ditch constructs and Construction method.
Background technology
Along with development and the construction of urban rail transit in China, in the infrastructure work progress of signaling system, The reserved engineering of goat foundation ditch becomes an important content.Reserved engineering is constructed for goat foundation ditch, main The factors such as the position of foundation ditch to be considered, shape, size and the degree of depth, these factors will directly affect the installation of goat, then shadow Ring to the turn-out track equipment control effect to track switch, and relate to traffic safety.
As shown in Fig. 1-1 1-3, in existing work progress, goat foundation ditch is constructed, be substantially by constructing Personnel combine construction drawing and each foundation ditch carry out manual one by one constructing, and now there is problems of: 1. efficiency is low, the longest, And repetitive operation is many;2. for same type of foundation ditch, there is deviation in the specification after having constructed;Existing goat foundation ditch structure During building, mostly utilize the material such as plank, steel wire that turn-out track equipment is reserved operation area enclosing, implement hardened ground After, the material damage built is removed.Carry out problems such as constructing the more size of engineering existence, specification deviation in this approach, And hand labor is relatively costly, efficiency is low.After foundation ditch molding, being removed by plank, plank becomes building waste, it is difficult to profit again With.
For problem above, in construction, there is no good solution at present, engineering is reserved for foundation ditch, maintains all the time In the manual aspect constructed, this is all a bottle for accelerating construction progress, lifting construction efficiency and betterment works quality Neck problem.
Summary of the invention
It is an object of the invention to provide mould and construction method that a kind of urban track traffic point machine foundation ditch is constructed, It is beneficial to solve in Construction of Urban Rail Traffic for multiple classes such as single engine track switch, dual-locomotive traction track switch and three-throw turnouts The point machine foundation ditch of type reserves the problem such as the inefficiency in work progress and specification deviation.
For achieving the above object, the technical solution adopted in the present invention is to provide a kind of urban track traffic point machine The mould that foundation ditch is constructed, wherein: described mould includes goat main frame foundation ditch mould piecemeal part and wears rail ditch groove mould and divide Block part;Described goat main frame foundation ditch mould piecemeal part is the goat main frame foundation ditch mould piecemeal of six pieces of same sizes, Every three pieces of goat main frame foundation ditch mould piecemeals are the most assembled, then by two pieces after assembly again to being merged by bolt respectively Dress, and be bolted, finally it is assemblied into the goat main frame foundation ditch mould piecemeal part being made up of six parts;Described wear Rail ditch groove mould piecemeal part includes that rail ditch groove mould piecemeal is worn in centre and rail ditch groove mould piecemeal is worn in both sides, and rail is worn in described centre It is assembled longitudinally through bolt that ditch groove mould piecemeal is that two pieces of same sizes wear rail ditch groove mould piecemeal, and both sides are worn rail ditch groove mould and divided Block is that four pieces of same sizes wear rail ditch groove mould piecemeal, every two pieces assembled longitudinally through bolt, be respectively provided at centre and wear rail groove The both sides of mould piecemeal;Described goat main frame foundation ditch mould piecemeal part and wear rail ditch groove mould piecemeal part and carry out assembly, The long side of the short brink and goat main frame foundation ditch mould piecemeal part of wearing rail groove mould part is stitched together, makes to wear Rail groove mould part and goat main frame foundation ditch mould piecemeal sections transverse, splicing position is bolted.
The construction method of the mould that a kind of urban track traffic point machine foundation ditch constructs is provided simultaneously.
The effect of the present invention is to use this structure mold to utilize the mould of unified standard dimensions to carry out foundation ditch to construct work Journey, it is possible to reduce the deviation of the aspects such as the size that causes due to artificial origin, specification, by foundation ditch mould is implemented modularity and Assembly, can improve efficiency of construction and reduce hand labor cost simultaneously, original 2 people within 2 days, complete a foundation ditch and construct, bring up to 2 People just can complete constructing of a foundation ditch in 1 day;Utilize mould can also improve reserved accurate of point machine foundation ditch simultaneously Degree, is reduced to 10mm by the deviation that original method constructs foundation ditch by 50mm;Due to the raising of efficiency of construction, substantially reduce original The time that circuit foundation ditch is constructed by engineering method, often construct the time that a foundation ditch can reduce one day, effectively push construction speed.
Accompanying drawing explanation
Fig. 1-1,1-2 are reserved main, the side views of single engine point machine foundation ditch in original urban track traffic;
Fig. 1-3 is Fig. 1-1B-B sectional view;
Fig. 2 is goat foundation ditch mould schematic diagram in the present invention;
Fig. 3 is goat main frame foundation ditch mould piecemeal schematic diagram of the present invention;
Fig. 4 is that the present invention wears rail ditch groove mould piecemeal schematic diagram;
Fig. 5 is each piece of integral assembling of goat foundation ditch mould of the present invention and putting position schematic diagram;
Fig. 6 is effect schematic diagram after inventive die assembly;
Fig. 7 is that goat foundation ditch mould of the present invention puts design sketch in the assembly of sleeper position;
Fig. 8 is that goat foundation pit construction of the present invention is constructed and hardened ground 3 d effect graph;
Fig. 9 is the goat foundation ditch 3 d effect graph after the present invention takes out mould.
In figure:
1, goat main frame foundation ditch mould piecemeal 2, rail ditch groove mould piecemeal 3 is worn in both sides, rail ditch groove mould piecemeal is worn in centre
Detailed description of the invention
The mould below in conjunction with the accompanying drawings the urban track traffic point machine foundation ditch of the present invention constructed and construction method It is described in detail:
The Design of Dies thought that the urban track traffic point machine foundation ditch of the present invention is constructed is to combine existing city rail Traffic goat foundation ditch in road is reserved the actual foundation ditch size marked in drawing and is pre-designed and makes some foundation ditch moulds and divide Block, when not carrying out the reserved construction of foundation ditch, is put each for mould piece by assembly order in advance one by one in circuit corresponding mileage position Putting in place, carry out assembly and fix, the mould after assembly meets the external action equipment such as goat cabinet, actuating strut, indication rod Putting position requirement.After die layout puts in place, all fronts goat foundation ditch is constructed and hardened ground work, finally by mould Tool block-by-block takes out, and complete foundation ditch constructs work.
The mould structure that the urban track traffic point machine foundation ditch of the present invention is constructed is that mould includes turn-out track owner Machine foundation ditch mould piecemeal part and wear rail ditch groove mould piecemeal part: described goat main frame foundation ditch mould piecemeal part is six pieces The goat main frame foundation ditch mould piecemeal 1 of same size, every three pieces of goat main frame foundation ditch mould piecemeals 1 are horizontal by bolt respectively To assembly, the most then by two pieces of assembly the most involutory after assembly, and it is bolted, is finally assemblied into by six part groups The goat main frame foundation ditch mould piecemeal part become;Described rail ditch groove mould piecemeal part of wearing includes that centre is worn rail ditch groove mould and divided Rail ditch groove mould piecemeal 2 is worn in block 3 and both sides, and it is that two pieces of same sizes wear rail ditch channel mould that rail ditch groove mould piecemeal 3 is worn in described centre Tool piecemeal is assembled longitudinally through bolt, and it is that four pieces of same sizes wear rail ditch groove mould piecemeal, often that rail ditch groove mould piecemeal 2 is worn in both sides Two pieces assembled longitudinally through bolt, is respectively provided at centre and wears the both sides of rail ditch groove mould piecemeal;Described goat main frame foundation ditch mould Tool piecemeal part and wear rail ditch groove mould piecemeal part and carry out assembly, will wear short brink and the turn-out track owner of rail groove mould part The long side of machine foundation ditch mould piecemeal part is stitched together, and makes to wear rail groove mould part and divides with goat main frame foundation ditch mould Block sections transverse, splicing position is bolted.
Rail ditch groove mould piecemeal 3 is worn in described centre, and wear rail ditch groove mould piecemeal 2 length with both sides identical, and rail groove is worn in centre The width of mould piecemeal 3 wears the width of rail ditch groove mould piecemeal 2 more than both sides.
The construction method of the mould that the urban track traffic point machine foundation ditch of the present invention is constructed is as follows:
Due to narrow space in tunnel, the reserved location of goat foundation ditch is under rail, and needs through rail both sides, If being an overall mould by Mold Making, being not easy to the operations such as installation, movement, dismounting, using blocking pin-connected panel mould Improve mold use motility, it is simple to carrying out assembly and disassembly during construction, especially after carrying out concreting, mould is each Individual part can be taken out respectively from the flange of rail, and does not affect other completed achievements in constructions.And use in existing Construction Mode The work pattern that the material such as plank, steel wire carries out rough enclosing to reserved area is compared, and has both improve the degree of accuracy that foundation ditch is reserved And standardization, also improve efficiency of construction, shorten the engineering time, meanwhile, the most repeatable utilization of mould, greatly reduce Waste to materials such as planks under original pattern.As in figure 2 it is shown, goat main frame foundation ditch mould piecemeal 1 has 6 parts and chi Very little identical, employing bolt splicing in order, as shown in Figure 3.Wear rail ditch groove mould to have 6 and wear rail ditch groove mould piecemeal, have two Block is equivalently-sized, use in order and wear rail ditch groove mould piecemeal 3 in the middle of bolt splicing, also four pieces equivalently-sized, adopt in order Rail ditch groove mould piecemeal 2 is worn, as shown in Figure 4 with the both sides that bolt is longitudinal spliced.The assembly of all parts and putting position such as Fig. 5 Shown in.
After Mold Making, when carrying out the reserved construction of goat foundation ditch, should place on the line according to goat Position, the drawing data such as angle, by each for mould piece according to the assembled order shown in Fig. 2 and position, put one by one and put in place, pass through Bolt carries out assembly and fixes, and obtains unitary mould, and effect such as Fig. 6, shown in 7.
Described unitary mould bottom surface distance rail surface distance is 4200mm, wears rail ditch groove mould piecemeal part putting position Vertical with rail, left-right deviation is less than ± 5mm.
After completing mould assembly and putting, carry out the reserved construction of foundation ditch and hardened ground work, effect such as Fig. 8 after construction Shown in.After completing unitary mould assembly and putting, carrying out the reserved construction of foundation ditch and hardened ground work, after construction, effect is as schemed Shown in 8.
Finally the Bolt dismantling between each for mould piece is fallen, each piecemeal is taken out respectively from ground, i.e. completes list The goat foundation ditch of machine travel track switch reserves work, and reserved effect is as shown in Figure 9.

Claims (2)

1. the mould constructed for urban track traffic point machine foundation ditch, is characterized in that: described mould includes and turns Rut machine host foundation ditch mould piecemeal part and wear rail ditch groove mould piecemeal part;Described goat main frame foundation ditch mould piecemeal part Being the goat main frame foundation ditch mould piecemeal of six pieces of same sizes, every three pieces of goat main frame foundation ditch mould piecemeals pass through spiral shell respectively Bolt is the most assembled, the most involutory goat main frame foundation ditch mould piecemeal part being assemblied into six faces by bolt;Described wear rail Ditch groove mould piecemeal part includes that rail ditch groove mould piecemeal is worn in centre and rail ditch groove mould piecemeal is worn in both sides, and rail ditch is worn in described centre It is assembled longitudinally through bolt that groove mould piecemeal is that two pieces of same sizes wear rail ditch groove mould piecemeal, and rail ditch groove mould piecemeal is worn in both sides Be that four pieces of same sizes wear rail ditch groove mould piecemeal, every two pieces assembled longitudinally through bolt, be respectively provided at centre and wear rail ditch channel mould The both sides of tool piecemeal;Described goat main frame foundation ditch mould piecemeal part and wear rail ditch groove mould piecemeal part and carry out assembly, will The long side of the short brink and goat main frame foundation ditch mould piecemeal part of wearing rail groove mould part is stitched together, and makes to wear rail Groove mould part and goat main frame foundation ditch mould piecemeal sections transverse, splicing position is bolted.
2., according to the mould constructed for urban track traffic point machine foundation ditch described in claims 1, it is characterized in that: institute Stating centre to wear rail ditch groove mould piecemeal wear rail ditch groove mould piecemeal length with both sides identical, the width of rail ditch groove mould piecemeal is worn in centre Degree wears the width of rail ditch groove mould piecemeal more than both sides.
CN201610576362.4A 2016-07-19 2016-07-19 Urban track traffic point machine foundation ditch constructs mould and construction method Expired - Fee Related CN106013169B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610576362.4A CN106013169B (en) 2016-07-19 2016-07-19 Urban track traffic point machine foundation ditch constructs mould and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610576362.4A CN106013169B (en) 2016-07-19 2016-07-19 Urban track traffic point machine foundation ditch constructs mould and construction method

Publications (2)

Publication Number Publication Date
CN106013169A true CN106013169A (en) 2016-10-12
CN106013169B CN106013169B (en) 2018-02-16

Family

ID=57116157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610576362.4A Expired - Fee Related CN106013169B (en) 2016-07-19 2016-07-19 Urban track traffic point machine foundation ditch constructs mould and construction method

Country Status (1)

Country Link
CN (1) CN106013169B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115323842A (en) * 2022-08-16 2022-11-11 安境迩(上海)科技有限公司 Switch floating plate switch machine equipment groove forming device and mounting method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0548734A1 (en) * 1991-12-20 1993-06-30 BWG Butzbacher Weichenbau GmbH Support element for the moving part of a railway switch
FR3019565A1 (en) * 2014-04-04 2015-10-09 Eiffage Rail METHOD FOR PRODUCING A TRAMWAY TRACK
CN205331781U (en) * 2015-12-10 2016-06-22 北京全路通信信号研究设计院集团有限公司 Urban rail transit goat installation device
CN205857195U (en) * 2016-07-19 2017-01-04 铁道第三勘察设计院集团有限公司 The mould constructed for urban track traffic point machine foundation ditch

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0548734A1 (en) * 1991-12-20 1993-06-30 BWG Butzbacher Weichenbau GmbH Support element for the moving part of a railway switch
FR3019565A1 (en) * 2014-04-04 2015-10-09 Eiffage Rail METHOD FOR PRODUCING A TRAMWAY TRACK
CN205331781U (en) * 2015-12-10 2016-06-22 北京全路通信信号研究设计院集团有限公司 Urban rail transit goat installation device
CN205857195U (en) * 2016-07-19 2017-01-04 铁道第三勘察设计院集团有限公司 The mould constructed for urban track traffic point machine foundation ditch

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115323842A (en) * 2022-08-16 2022-11-11 安境迩(上海)科技有限公司 Switch floating plate switch machine equipment groove forming device and mounting method

Also Published As

Publication number Publication date
CN106013169B (en) 2018-02-16

Similar Documents

Publication Publication Date Title
CN104562863B (en) A kind of dual-purpose railway two-orbit
CN103331817A (en) 3D (Three-dimensional) printing method of engineering structure
CN103233424A (en) Hanging-basket-method support-free anti-collision wall construction method, construction hanging basket and template for construction
CN115787524B (en) BIM-based pedestrian bridge reconstruction construction method
CN105171911A (en) Bottom mold trolley
CN107354826B (en) The rapid constructing method of tunnel built-in type rail system
CN204097881U (en) A kind of bottom die trolley
CN203174510U (en) Movable assembly type hanging basket for bridge anti-collision guardrail construction and formwork for construction
CN206015442U (en) A kind of removable compound shield-tunneling construction sleeper
CN106013169B (en) Urban track traffic point machine foundation ditch constructs mould and construction method
CN106640131B (en) A kind of modular variable cross-section tunnel lining trolley
CN103867214A (en) Construction method for carrying out secondary lining and casting in shielded tunnel
CN105649636A (en) Synchronous inverted-arch concrete paving device and method of large-diameter shield tunneling machine
CN205857195U (en) The mould constructed for urban track traffic point machine foundation ditch
CN106827177A (en) The vibrating method of bubble removing is removed in a kind of prefabricated pipe section production
CN102587252A (en) Wavy high-precision curve cement concrete pavement construction method
CN106758563B (en) Sleeper construction and construction method for non-fragment orbit linking new and old concrete
CN206289470U (en) A kind of urban track traffic Prefabricated slab type track
CN105525929B (en) The common template and its application method of lining construction telescoping steel form
CN104612016A (en) Quick municipal road first-aid repair method
CN110126057B (en) Substation 3D architectural printing method
CN102926322A (en) Construction method, hoisting tool, location tire and location support for installing comb-tooth-shaped expansion joint
CN202622992U (en) Universal-type post-tensioned T-beam precast pedestal with detachable modules and adjustable steel members
CN106003392A (en) Fixed-line-shaped track beam precasting formwork system for straddle type monorail transit
CN206374017U (en) It is a kind of to fix linear cross-saddle single-track traffic pre-track beam forms system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 300142 Hebei District, Zhongshan Road, No. 10,

Applicant after: China Railway Design Group Limited

Address before: 300142 Hebei District, Zhongshan Road, No. 10,

Applicant before: China Railway Third Survey and Design Institute Group Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant