EP1548228A1 - Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé - Google Patents

Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé Download PDF

Info

Publication number
EP1548228A1
EP1548228A1 EP03029690A EP03029690A EP1548228A1 EP 1548228 A1 EP1548228 A1 EP 1548228A1 EP 03029690 A EP03029690 A EP 03029690A EP 03029690 A EP03029690 A EP 03029690A EP 1548228 A1 EP1548228 A1 EP 1548228A1
Authority
EP
European Patent Office
Prior art keywords
wall
tube
icing
tunnel
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP03029690A
Other languages
German (de)
English (en)
Other versions
EP1548228B1 (fr
Inventor
Roland Dr. Leucker
Andreas Wuttig
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hochtief AG
Original Assignee
Hochtief AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hochtief AG filed Critical Hochtief AG
Priority to AT03029690T priority Critical patent/ATE353117T1/de
Priority to DE50306443T priority patent/DE50306443D1/de
Priority to EP03029690A priority patent/EP1548228B1/fr
Publication of EP1548228A1 publication Critical patent/EP1548228A1/fr
Application granted granted Critical
Publication of EP1548228B1 publication Critical patent/EP1548228B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • E21D1/10Preparation of the ground
    • E21D1/12Preparation of the ground by freezing
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • E21D1/10Preparation of the ground
    • E21D1/12Preparation of the ground by freezing
    • E21D1/14Freezing apparatus

Definitions

  • the invention relates to a method for creating a underground tube. Furthermore, the invention relates to a Apparatus for carrying out this method.
  • underground tube is here and below too generally meant an underground cavity.
  • In the Tube or in the cavity is in particular to a connecting tube between a shaft and a tunnel tube.
  • the connection tube For example, serves as a rescue in emergencies.
  • the creation of the connecting tubes or cross passages is due to the difficult geological and hydrological Conditions usually in the protection of a ground icing carried out.
  • the generated in the context of ground freezing Frost body ensures that the above the construction site soil is effectively supported and guaranteed thus the static load capacity during the construction period.
  • a groundwater foreclosure achieved the construction site.
  • the invention is based on the technical problem to specify a method of the type mentioned above, with an underground tube using ground icing can be prepared and in which the above described problems can be avoided.
  • the invention is still based on the technical problem, a Specify device for carrying out this method.
  • the invention teaches a method of creating an underground tube, wherein before creating the tube in at least part of the Surround the tube temporarily at least one frost body is generated by ground icing.
  • This procedure is thereby characterized in that an icing medium for generating the ground icing by one in an already existing one Wall arranged piping is passed, which Pipe runs along the outer surface of the wall. Afterwards, the tube wall can protect the ground be made.
  • the term tube is here in particular a connecting tube meant between a shaft and a tunnel.
  • the connecting tube can also or between two tunnels or between two manholes.
  • the invention Procedure is especially for shorter distances between the two to be connected through the tube Rooms suitable.
  • the tube according to the invention is preferably used as a connecting tube for connection to a Shaft or to a shaft opening in a shaft wall, especially in a caisson wall.
  • a connecting tube for connection to a Shaft or to a shaft opening in a shaft wall, especially in a caisson wall.
  • a single continuous Frost body can be generated or even several side by side arranged or spaced apart Frost body sections.
  • already existing wall means in Frame of the invention, in particular a wall with defined Surface, extending from the adjacent soil or soil different.
  • Already existing wall means in the frame the invention especially an artificially created wall, preferably a shaft wall, preferably a caisson wall.
  • the wall can also be a tunnel wall, in particular is formed by tubbings.
  • the icing medium by at least a part of the circumference of the Tube or at least along part of the circumference of the Connection opening in the wall running pipeline led and that is about this part of the tube circumference extending frost body is formed.
  • the pipeline runs the invention over the entire circumference of the tube or the connection opening. It is thus a circulating pipeline.
  • a Pipeline according to the invention only a supply line and only one drain line for the icing medium connected.
  • the pipelines according to the invention can Also known as icing loops.
  • the icing medium through one in direct contact with the one to be frozen Ground-standing pipeline is guided.
  • the pipeline is so with the proviso on the outer surface of the wall led that they are in contact with the surrounding soil that is to be frozen.
  • the pipeline in a provided in the outer surface of the wall and outwardly open channel arranged. It is located in Frame of the invention that anchors the pipe in the wall is, for example, with the help of several head bolts, which are connected to the pipeline and in particular to intervene in the concrete of the wall.
  • the at least a pipeline is arranged in the outer wall of a shaft, which shaft is connected to the tunnel via the tube becomes.
  • Outside wall here means the above, already existing wall. It is within the scope of the invention that this wall is a vertically arranged or substantially vertically disposed wall. at the above preferred embodiment is to a Querschlagan Kunststoff a tunnel to the Shaft or to the shaft structure. If this shaft Connected to a tunnel via the tube is after a preferred embodiment of the invention, at least a pipeline for the icing medium also in the tunnel wall intended. The pipeline is then expediently in the outer surface of the tubbings of the tunnel wall arranged. This at least one pipe in the outer surface the tunnel wall is to be preferred Embodiment in the sole area or in the ridge area of the to be made Tube.
  • the shaft may also be a trench wall pit act.
  • the invention is the method for a immediate connection between a tunnel and the Shaft used.
  • the tunnel leads directly into the shaft and in the area of Shaft wall to be created tunnel section forms the inventive Tube.
  • the tunnel becomes in this embodiment in particular to a passage through or Caisson connected.
  • Such a connection finds For example, also in station areas instead.
  • the soil icing is as nitrogen icing and / or carried out as a brine.
  • the soil icing is as nitrogen icing and / or carried out as a brine.
  • One Embodiment of the invention is characterized that in a part of the environment of the tube to be created at least one frost body with the help of at least one in the Ground introduced icing is generated. there So it is a ground icing after the State of the art, usually with icing lances is working.
  • Such a conventional one Soil icing may occur in the ridge area or in the sole area the tube to be created are performed. It but it should be emphasized that this conventional ground icing only as a supplementary measure to the ground icing invention is carried out.
  • the invention also provides a device for creating an underground tube, wherein at least one Wall is provided, in which a connection opening for a is introduced to the wall to be connected tube or introduced is, wherein in the outer surface of the wall at least one intended for the passage of an icing medium Pipeline runs, which pipeline the connection opening at least partially surrounds.
  • the pipe surrounds the connection opening via at least 50%, preferably over at least 60% and very preferred over at least 75% of the circumference of the connection opening.
  • the pipe the connection opening completely surrounds as a loop.
  • the pipeline is preferred in anchored to the wall, for example by means of headed bolts anchored in the concrete of the wall. It is within the scope of the invention that only one supply line to the pipeline and only one drain line for the icing medium connected. It is preferably about Inlet pipes and drain pipes with relatively low Diameter.
  • the invention is based on the finding that with the icing process according to the invention Stability, the life and thus the usability of the structures, i. the shafts and tunnels in comparison significantly improved to the known icing becomes.
  • the structures are only required by the Supply lines or drain lines for the Icing medium only minimally penetrated.
  • Pipelines or icing loops are not disturbed.
  • the figures illustrate a method of preparation an underground tube 1.
  • An icing medium becomes the Generation of this ground icing by at least one in an already existing wall 5 arranged pipe. 6 directed.
  • This pipeline 6 runs along the outer surface the wall 5.
  • the tube 1 in the protection of Bodenvereisung be made.
  • the pipe 6 extends over the entire Circumference of the tube 1 and the connection opening 7 in the Wall. Consequently, a frost body 2, 3, 4 on this entire circumference of the connection opening 7 is formed.
  • the pipeline 6 is in direct contact with the person to be frozen Ground. Appropriately, and in the embodiment closes the pipe 6 flush with the outer surface the wall 5 off. This is especially true in the enlarged Detail of Fig. 1 recognizable.
  • This section also shows that the pipe 6 is preferably in the wall 5 or anchored in the concrete of the wall 5 and although in the embodiment by means of head bolts. 8
  • the cross-connection is a tunnel 10 to a caisson 9 realized.
  • a pipeline 6 for the icing medium runs over the entire circumference of the connection opening 7 in the wall 5 of the caisson 9. This can be seen above all in FIG. 2.
  • the circulating Pipe 6 forms as it were an icing loop the connection opening 7. With this in the wall 5 circulating Pipe, a first frost body 2 is generated. In the bottom region of the tube 1, a second frost body 3 generated by ground icing.
  • piping 6 in the outer surface the tunnel wall 11 or on the outside of the Tubbing this tunnel wall 11 is arranged.
  • Such a pipeline 6 is expediently set in segments, because it is interrupted by the tubbing joints.
  • Such bottom icing in the bottom region of the tube 1 is especially necessary if the distance between tunnels 10 and caisson 9 is relatively large.
  • FIGS. 1 to 3 is otherwise a frost body 4 using the conventional soil freezing measures generated. These are individual icing holes in the ridge region of the tube 1 from the wall 5 brought in. This manufactured according to the prior art Frost body 4 merely supplements the inventively prepared Frost body 2 and 3.
  • the frost body 3 is replaced by additional pipes 6 in the tunnel wall 11 made. But that does not mean that for this Bodenvereisung an additional icing unit or an additional icing medium tank necessary is.
  • it is produced by an advance Supply bore from the caisson 9 to the tunnel 10th towards the icing medium from the caisson 9 to the pipeline 6 and transported to the pipes 6 in the tunnel 10. This feed hole is not in the figures been presented.
  • FIGS. 4 to 6 is a tunnel 10 directly connected to a caisson 9. It This is a particular of a tunneling machine passable caisson 9.
  • the tunnel 10 or the tunnel section in the region of the caisson 9 is in this embodiment at the same time to be created underground tube 1.
  • this pipe 6 is in the embodiment 4 to 6, only a single frost body 2 is frozen on the outer surface of the wall 5. in the Protection of this soil icing, the tunnel 10 at the Countersink 9 can be connected easily.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Pipeline Systems (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
EP03029690A 2003-12-23 2003-12-23 Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé Expired - Lifetime EP1548228B1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
AT03029690T ATE353117T1 (de) 2003-12-23 2003-12-23 Verfahren zur erstellung einer unterirdischen röhre und vorrichtung zur durchführung des verfahrens
DE50306443T DE50306443D1 (de) 2003-12-23 2003-12-23 Verfahren zur Erstellung einer unterirdischen Röhre und Vorrichtung zur Durchführung des Verfahrens
EP03029690A EP1548228B1 (fr) 2003-12-23 2003-12-23 Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP03029690A EP1548228B1 (fr) 2003-12-23 2003-12-23 Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé

Publications (2)

Publication Number Publication Date
EP1548228A1 true EP1548228A1 (fr) 2005-06-29
EP1548228B1 EP1548228B1 (fr) 2007-01-31

Family

ID=34530712

Family Applications (1)

Application Number Title Priority Date Filing Date
EP03029690A Expired - Lifetime EP1548228B1 (fr) 2003-12-23 2003-12-23 Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé

Country Status (3)

Country Link
EP (1) EP1548228B1 (fr)
AT (1) ATE353117T1 (fr)
DE (1) DE50306443D1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021534337A (ja) * 2019-09-28 2021-12-09 中▲鉄▼九局集▲団▼有限公司China Railway No.9 Group Co., Ltd 連絡通路の凍結工法及び凍結システム

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE64556C (de) * Frau J. POETSCH in Magdeburg, Augustastr. 31 Verfahren zum Vortreiben von Tunneln, Strecken und dergl., sowie zum Abteufen von Schächten unter Benutzung der durch Patent Nr. 25015 geschützten Gefriermethode
DE25015C (de) * H. POETSCH in Aschersleben Verfahren zur Abteufung von Schächten in schwimmendem Gebirge
DE627275C (de) * 1934-12-05 1936-03-11 Charbonnages De Faulquemont So Verfahren und Vorrichtung zum Abteufen von Schaechten

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE64556C (de) * Frau J. POETSCH in Magdeburg, Augustastr. 31 Verfahren zum Vortreiben von Tunneln, Strecken und dergl., sowie zum Abteufen von Schächten unter Benutzung der durch Patent Nr. 25015 geschützten Gefriermethode
DE25015C (de) * H. POETSCH in Aschersleben Verfahren zur Abteufung von Schächten in schwimmendem Gebirge
DE627275C (de) * 1934-12-05 1936-03-11 Charbonnages De Faulquemont So Verfahren und Vorrichtung zum Abteufen von Schaechten

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021534337A (ja) * 2019-09-28 2021-12-09 中▲鉄▼九局集▲団▼有限公司China Railway No.9 Group Co., Ltd 連絡通路の凍結工法及び凍結システム

Also Published As

Publication number Publication date
DE50306443D1 (de) 2007-03-22
EP1548228B1 (fr) 2007-01-31
ATE353117T1 (de) 2007-02-15

Similar Documents

Publication Publication Date Title
DE69431484T2 (de) Verfahren zur ersetzung einer erdverlegten rohrleitung
DE102007005540B4 (de) Verfahren und Injektionsanker mit fixiertem Statikmischer
DE102005021216A1 (de) Verfahren und Vorrichtungen zur grabenlosen Verlegung von Rohrleitungen
DE102018103201B4 (de) Verbauvorrichtung
DE4232290A1 (de) Verfahren zur Sicherung rutschgefährdeter Massen beim Tunnelbau und Verpreßanker
DE2712869C2 (de) Verfahren zum Vermeiden von Wassereinbrüchen in untertägige Hohlräume
WO2009095046A1 (fr) Procédé de pose, sans tranchée, de conduites
EP2447462A1 (fr) Procédé d'introduction souterraine d'une conduite
EP1548228B1 (fr) Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé
DE2505668A1 (de) Vorrichtung an bohrausruestungen
DE102012217822A1 (de) Vorrichtung und Verfahren zur Verlegung einer Rohrleitung in einem Bohrloch
DE3524253C1 (de) Verfahren und Vorrichtung zur Herstellung eines Schachtes, insbesondere für den Bergbau
DE3008727C2 (de) Nachgiebiger Gefrierschacht-Außenausbau
DE3447872A1 (de) Verfahren zur konsolidierung des gelaendes beim tunnelausbruch
EP3112580B1 (fr) Procédé et dispositif pour la formation d'une canalisation souterraine
DE2250635B2 (de) Verfahren zur Herstellung eines Tunnels
DE3703534C2 (fr)
DE19808478A1 (de) Verfahren zum grabenlosen Verlegen von Rohren
DE1759309A1 (de) Verfahren zum Herstellen von unterirdischen Hohlraeumen
AT517641B1 (de) Verfahren und Vorrichtung zum nachträglichen Abdichten vom Erdreich umgebener Betonbauwerke mit Dichtungsfugen wie Tunneln
CH374819A (de) Verfahren zur Herstellung von vorgespannten Verankerungen für Bauwerke, wie Stützmauern, Baugrubensicherungen und dergleichen und nach diesem Verfahren hergestellter Vorspannanker
DE19913016A1 (de) Vortriebsrohr
EP3663504B1 (fr) Procédé de terrassement, dispositif de terrassement et installation de terrassement
DE10114625A1 (de) Vorrichtung, Verfahren und Verlegeeinrichtung zur hydraulischen Stützung eines Tunnels
DE2727081A1 (de) Verfahren und vorrichtung zum abdichten von spundwaenden

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20041110

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

AKX Designation fees paid

Designated state(s): AT CH DE GB LI NL

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT CH DE GB LI NL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070131

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 50306443

Country of ref document: DE

Date of ref document: 20070322

Kind code of ref document: P

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: KELLER & PARTNER PATENTANWAELTE AG

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20071101

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20071223

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20071223

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20081223

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20081224

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20081216

Year of fee payment: 6

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091223

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091231

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100701