EP1548228B1 - Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé - Google Patents
Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé Download PDFInfo
- Publication number
- EP1548228B1 EP1548228B1 EP03029690A EP03029690A EP1548228B1 EP 1548228 B1 EP1548228 B1 EP 1548228B1 EP 03029690 A EP03029690 A EP 03029690A EP 03029690 A EP03029690 A EP 03029690A EP 1548228 B1 EP1548228 B1 EP 1548228B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- wall
- icing
- pipe
- pipeline
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims description 23
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 claims description 4
- 239000012267 brine Substances 0.000 claims description 2
- 229910052757 nitrogen Inorganic materials 0.000 claims description 2
- HPALAKNZSZLMCH-UHFFFAOYSA-M sodium;chloride;hydrate Chemical compound O.[Na+].[Cl-] HPALAKNZSZLMCH-UHFFFAOYSA-M 0.000 claims description 2
- 238000007710 freezing Methods 0.000 abstract description 6
- 230000008014 freezing Effects 0.000 abstract description 6
- 239000002184 metal Substances 0.000 abstract 2
- 239000002826 coolant Substances 0.000 abstract 1
- 238000001816 cooling Methods 0.000 abstract 1
- 239000002689 soil Substances 0.000 description 6
- 230000002787 reinforcement Effects 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 239000003673 groundwater Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 230000003313 weakening effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/10—Preparation of the ground
- E21D1/12—Preparation of the ground by freezing
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/10—Preparation of the ground
- E21D1/12—Preparation of the ground by freezing
- E21D1/14—Freezing apparatus
Definitions
- the invention relates to a method for creating an underground tube. Furthermore, the invention relates to a device for carrying out this method.
- the term subterranean tube is here and below also generally meant an underground cavity.
- the tube or cavity is a connecting tube between a well and a tunnel tube. In mechanical tunneling, it is often necessary to connect a completed tunnel tube via connecting tubes or cross passages with a shaft structure, in particular with a caisson.
- the connecting tube serves, for example, as a rescue passage in emergencies.
- the creation of the connecting pipes is normally carried out under the protection of ground freezing due to the difficult geological and hydrological conditions, see e.g. DE 64556 C.
- the frost created by the ground freezing process ensures that the soil above the construction site is effectively supported, thus ensuring the static load-bearing capacity during the construction period.
- a groundwater foreclosure of the site is achieved with the frost body.
- frost bodies distributed from a shaft in particular from a caisson
- the caisson wall In order to remove the high loads resulting from earth pressure and water pressure, the caisson wall usually has to be highly reinforced frame-like.
- the large number of icing holes leaves little room for the arrangement of an effective reinforcement in the horizontal and / or vertical direction. This is especially a special problem if an elaborate reinforcement is necessary in the area above and below the connection opening of the caisson.
- the reinforcement of the shaft wall or caisson wall is adversely affected in the known measures by the introduction of a large number of icing. Similar problems arise when the icing lances have to be made out of a tunnel.
- the invention the technical problem of providing a method of the type mentioned above, with which an underground tube can be prepared using a Bodenvereisung and in which the above-described problems can be avoided.
- the invention is still the technical problem of providing an apparatus for performing this method.
- the invention teaches a method for creating a subterranean tube, wherein before creating the tube in at least part of the environment of the tube temporarily at least one frost body is generated by ground icing.
- This method is characterized in that an icing medium for generating the ground icing is passed through a pipe arranged in an already existing wall, which pipe runs along the outer surface of the wall. Subsequently, the tube wall can be made in the protection of Bodenvereisung.
- the tube is meant in particular a connecting tube between a shaft and a tunnel.
- the connecting tube can also be created between two tunnels or between two shafts.
- the inventive method is particularly suitable for shorter distances between the two spaces to be connected through the tube.
- the tube according to the invention preferably serves as a connecting tube for connection to a shaft or to a shaft opening in a shaft wall, in particular in a box wall.
- a single continuous frost body can be generated, or else a plurality of adjacently arranged or spaced apart frost body sections.
- existing wall means, in particular, a wall with a defined surface extending from the adjacent floor or ground different.
- Existing wall means in the context of the invention, especially an artificially created wall, preferably a shaft wall, preferably a box wall.
- the wall may also be a tunnel wall, which is formed in particular by tubbing.
- the icing medium is passed through a pipeline extending at least along a part of the circumference of the tube or at least along a part of the circumference of the connection opening in the wall and that a frost body extending over this part of the tube circumference is formed ,
- the pipeline extends at least along 40%, preferably at least along 50% and very preferably at least along 60% of the circumference of the tube or the connection opening.
- the pipeline extends over the entire circumference of the tube or the connection opening. It is thus a circulating pipeline.
- as few supply lines and drain lines for the icing medium are connected to a pipeline.
- only one feed line and only one drain line for the icing medium is connected to a pipeline according to the invention.
- the pipelines according to the invention can also be referred to as icing loops.
- the at least one pipeline is arranged in the outer wall of a shaft, which shaft is connected via the tube with a tunnel.
- Exterior wall here means the above-mentioned, already existing wall. It is within the scope of the invention that this wall is a vertically arranged or substantially vertically arranged wall. In the above-mentioned preferred embodiment, it is a Querschlagan Kunststoff a tunnel to the shaft or to the shaft structure. If this shaft is connected to the tunnel via the tube, according to a preferred embodiment of the invention, at least one pipeline for the icing medium is also provided in the tunnel wall. The pipeline is then expediently arranged in the outer surface of the tubbings of the tunnel wall. This at least one pipe in the outer surface of the tunnel wall is according to a preferred embodiment in the sole region or in the ridge region of the tube to be made.
- the shaft may also be a diaphragm wall pit.
- the pipe is placed in the outer wall of a caisson, which caisson is preferably connected via the tube with a tunnel. It is then realized a cross-connection of this tunnel to the caisson.
- the method according to the invention is used for a direct connection between a tunnel and the shaft.
- the tunnel leads directly into the shaft and the tunnel section to be created in the region of the shaft wall forms the tube according to the invention.
- the tunnel is connected in this embodiment in particular to a traversed shaft or caisson. Such a connection also takes place, for example, in station areas.
- the soil icing is carried out as nitrogen icing and / or as brine compaction.
- An embodiment of the invention is characterized in that in a part of the environment of the tube to be created at least one frost body is generated by means of at least one introduced into the ground icing. So it is a ground icing according to the prior art, which is usually worked with glazing lances. Expediently, a plurality of icing bores or a plurality of icing lances are provided next to each other in said region.
- Such a conventional ground freezing can be carried out in the ridge area or in the bottom area of the tube to be created. It should be emphasized, however, that this conventional ground freezing is carried out only as a supplementary measure to the ground icing according to the invention.
- the invention also provides a device for creating an underground tube, wherein at least one wall is provided in which a connection opening for a pipe to be connected to the wall is introduced or introduced, wherein in the outer surface of the wall at least one for the passage of an icing medium provided pipeline runs, which pipeline surrounds the connection opening at least partially.
- the pipe surrounds the connection opening over at least 50%, preferably over at least 60% and very preferably over at least 75% of the circumference of the connection opening.
- the pipeline is flush with the outer surface of the wall. According to this embodiment, therefore, the pipeline does not project beyond the wall.
- the pipeline is preferably anchored in the wall, anchored for example by means of headed bolts in the concrete of the wall. It is within the scope of the invention that only one supply line and only one drain line for the icing medium is connected to the pipeline. These are preferably inlet pipes and drain pipes with a relatively small diameter.
- the invention is based on the finding that with the icing method according to the invention, the strength or
- the figures illustrate a method for creating a subterranean tube 1.
- at least one frost body 2, 3, 4 is temporarily generated in the vicinity of the tube 1 and over the circumference of the tube 1 by ground icing.
- An icing medium becomes the Generating this Bodenvereisung passed through at least one arranged in an existing wall 5 pipe 6.
- This pipe 6 runs along the outer surface of the wall 5.
- the tube 1 can be made in the protection of Bodenvereisung.
- the pipe 6 extends over the entire circumference of the tube 1 and the connection opening 7 in the wall. Consequently, a frost body 2, 3, 4 is formed over this entire circumference of the connection opening 7.
- the pipeline 6 is in direct contact with the ground to be frosted.
- the pipe 6 is flush with the outer surface of the wall 5 from. This can be seen in particular in the enlarged detail of FIG. 1.
- This section also shows that the pipe 6 is preferably anchored in the wall 5 or in the concrete of the wall 5, specifically in the exemplary embodiment with the aid of head bolts 8.
- a caisson 9 is connected via the tube 1 to be created with a tunnel 10. With the tube 1 so the Quertschanitati a tunnel 10 to a caisson 9 is realized.
- a piping 6 for the icing medium extends over the entire circumference of the connection opening 7 in the wall 5 of the caisson 9. This can be seen above all in FIG. 2.
- a feed line, not shown in the figures, as well as a discharge line, also not shown in the figures, for the icing medium are connected to the pipeline 6.
- the circumferential pipe 6 forms as it were an icing loop the connection opening 7. With this circulating in the wall 5 pipe a first frost body 2 is generated.
- a second frost body 3 is generated by ground icing.
- at least one pipe 6, not shown in the figures, is arranged in the outer surface of the tunnel wall 11 or on the outer side of the tubbing of this tunnel wall 11.
- Such a pipe 6 is advantageously juxtaposed segment by segment, since it is interrupted by the Tübbingfugen.
- Such bottom icing in the bottom region of the tube 1 is required especially when the distance between tunnel 10 and caisson 9 is relatively large.
- a frost body 4 is generated with the aid of the conventional soil freezing measures.
- individual icing holes in the ridge area of the tube 1 are introduced from the wall 5.
- This frost body 4 produced according to the prior art merely supplements the frost bodies 2 and 3 produced according to the invention.
- the frost body 3 is produced by additional pipes 6 in the tunnel wall 11.
- this does not mean that an additional icing aggregate or an additional icing medium tank is necessary for this soil icing.
- the icing medium is transported from the caisson 9 to the pipeline 6 or to the pipelines 6 in the tunnel 10 by means of a supply bore made in advance from the caisson 9 to the tunnel 10. This feed bore has not been shown in the figures.
- a tunnel 10 is connected directly to a caisson 9.
- the tunnel 10 or the tunnel section in the region of the caisson 9 is at the same time the underground tube 1 to be created.
- a pipeline 6 extends over the entire circumference of the connection opening 7 in the wall 5. With this pipe 6, only a single frost body 2 is frozen on the outer surface of the wall 5 in the embodiment of FIGS. In the protection of this Bodenvereisung the tunnel 10 can be easily connected to the caisson 9.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Pipeline Systems (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Claims (9)
- Procédé d'élaboration d'un tube souterrain (1), avant l'élaboration du tube (1) au moins un corps froid (2, 3, 4) étant créé provisoirement dans au moins une partie de l'environnement du tube (1), par congélation du sol, caractérisé en ce qu'on conduit un fluide de congélation pour la congélation du sol à travers au moins une canalisation (6) disposée dans une paroi (5) d'ores et déjà présente, laquelle canalisation (6) s'étend le long de la surface extérieure de la paroi (5) et le tube (1) étant ensuite fabriqué sous protection de la congélation du sol.
- Procédé selon la revendication 1, caractérisé en ce que le fluide de congélation est conduit à travers une canalisation (6) s'étendant dans la paroi (5), au moins le long d'une partie de la périphérie du tube (1) et un corps froid (2, 3, 4) s'étendant sur cette partie de la périphérie du tube étant formé.
- Procédé selon l'une quelconque des revendications 1 ou 2, caractérisé en ce que le fluide de congélation est conduit à travers une canalisation (6) qui est en contact direct avec le sol à congeler.
- Procédé selon l'une quelconque des revendications 1 à 3, caractérisé en ce qu'au moins la canalisation (6) est disposée dans la paroi extérieure d'un puits, lequel puits est relié par l'intermédiaire du tube (1) avec un tunnel (10).
- Procédé selon la revendication 4, caractérisé en ce que la canalisation (6) est disposée dans la paroi extérieure d'un caisson de fonçage (9) lequel caisson de fonçage (9) est relié par l'intermédiaire du tube (1) avec un tunnel (10).
- Procédé selon l'une quelconque revendications 1 à 5, caractérisé en ce que la congélation du sol est réalisée sous la forme d'une congélation à l'azote et/ou d'une congélation à la saumure.
- Procédé selon l'une quelconque revendications 1 à 6, caractérisé en ce que dans une partie de l'environnement du tube (1), au moins un corps froid (2, 3, 4) est créé à l'aide d'au moins un forage de congélation (12) ménagé dans le sol.
- Dispositif pour la réalisation du procédé selon les revendications 1 à 7, au moins une paroi (5) étant prévue dans laquelle est ménagé ou on ménage un orifice de raccordement (7) pour un tube (1) devant être raccordé sur la paroi, caractérisée en ce qu'au moins une canalisation (6) prévue pour la circulation d'un fluide de congélation s'étend dans la surface extérieure de la paroi (5), laquelle canalisation (6) entoure au moins partiellement l'orifice de raccordement (7).
- Dispositif selon la revendication 8, caractérisé en ce que la canalisation (6) se termine à fleur de la surface extérieure de la paroi (5)
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE50306443T DE50306443D1 (de) | 2003-12-23 | 2003-12-23 | Verfahren zur Erstellung einer unterirdischen Röhre und Vorrichtung zur Durchführung des Verfahrens |
| EP03029690A EP1548228B1 (fr) | 2003-12-23 | 2003-12-23 | Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé |
| AT03029690T ATE353117T1 (de) | 2003-12-23 | 2003-12-23 | Verfahren zur erstellung einer unterirdischen röhre und vorrichtung zur durchführung des verfahrens |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP03029690A EP1548228B1 (fr) | 2003-12-23 | 2003-12-23 | Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP1548228A1 EP1548228A1 (fr) | 2005-06-29 |
| EP1548228B1 true EP1548228B1 (fr) | 2007-01-31 |
Family
ID=34530712
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP03029690A Expired - Lifetime EP1548228B1 (fr) | 2003-12-23 | 2003-12-23 | Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP1548228B1 (fr) |
| AT (1) | ATE353117T1 (fr) |
| DE (1) | DE50306443D1 (fr) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2020244677A1 (fr) * | 2019-09-28 | 2020-12-10 | 中铁九局集团有限公司 | Procédé de construction par congélation pour un passage de raccordement et système de congélation |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE64556C (de) * | Frau J. POETSCH in Magdeburg, Augustastr. 31 | Verfahren zum Vortreiben von Tunneln, Strecken und dergl., sowie zum Abteufen von Schächten unter Benutzung der durch Patent Nr. 25015 geschützten Gefriermethode | ||
| DE25015C (de) * | H. POETSCH in Aschersleben | Verfahren zur Abteufung von Schächten in schwimmendem Gebirge | ||
| FR794915A (fr) * | 1934-12-05 | 1936-02-28 | Charbonnages De Faulquemont So | Procédé de fonçage des puits en terrains aquifères et puits en résultant |
-
2003
- 2003-12-23 AT AT03029690T patent/ATE353117T1/de not_active IP Right Cessation
- 2003-12-23 EP EP03029690A patent/EP1548228B1/fr not_active Expired - Lifetime
- 2003-12-23 DE DE50306443T patent/DE50306443D1/de not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2020244677A1 (fr) * | 2019-09-28 | 2020-12-10 | 中铁九局集团有限公司 | Procédé de construction par congélation pour un passage de raccordement et système de congélation |
Also Published As
| Publication number | Publication date |
|---|---|
| DE50306443D1 (de) | 2007-03-22 |
| EP1548228A1 (fr) | 2005-06-29 |
| ATE353117T1 (de) | 2007-02-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE102005021216A1 (de) | Verfahren und Vorrichtungen zur grabenlosen Verlegung von Rohrleitungen | |
| DE2250369A1 (de) | Rohrfoermige auskleidung | |
| EP1355039A1 (fr) | Procédé pour la construction de chambres libres allongées entre deux segments d'un tunnel | |
| DE2434200B2 (de) | Verfahren zur herstellung von unterirdischen hohlraeumen | |
| EP0471158A2 (fr) | Procédé et installation pour empêcher les fuites d'eau d'infiltration dans une décharge de déchets | |
| DE2712869C2 (de) | Verfahren zum Vermeiden von Wassereinbrüchen in untertägige Hohlräume | |
| DE4232290A1 (de) | Verfahren zur Sicherung rutschgefährdeter Massen beim Tunnelbau und Verpreßanker | |
| WO2009095046A1 (fr) | Procédé de pose, sans tranchée, de conduites | |
| DE3524253C1 (de) | Verfahren und Vorrichtung zur Herstellung eines Schachtes, insbesondere für den Bergbau | |
| DE3008727C2 (de) | Nachgiebiger Gefrierschacht-Außenausbau | |
| EP1548228A1 (fr) | Procédé de réalisation d'un forage souterrain et dispositif pour ce procédé | |
| DE2250635B2 (de) | Verfahren zur Herstellung eines Tunnels | |
| DE3447872A1 (de) | Verfahren zur konsolidierung des gelaendes beim tunnelausbruch | |
| DE3703534C2 (fr) | ||
| DE1759309A1 (de) | Verfahren zum Herstellen von unterirdischen Hohlraeumen | |
| CH718952A1 (de) | Horizontalbohrverfahren und Horizontalbohrsystem. | |
| DE3733344A1 (de) | Verbundausbau | |
| AT517641B1 (de) | Verfahren und Vorrichtung zum nachträglichen Abdichten vom Erdreich umgebener Betonbauwerke mit Dichtungsfugen wie Tunneln | |
| CH374819A (de) | Verfahren zur Herstellung von vorgespannten Verankerungen für Bauwerke, wie Stützmauern, Baugrubensicherungen und dergleichen und nach diesem Verfahren hergestellter Vorspannanker | |
| DE1922118A1 (de) | Verfahren zum Ausbauen von Tunneln und Stollen,sowie Vorrichtung zur Durchfuehrung des Verfahrens | |
| DE19913016A1 (de) | Vortriebsrohr | |
| DE2350808A1 (de) | Verfahren und anordnung zum absenken von baukoerpern im zuge der herstellung von baukonstruktionen in lockerboeden | |
| DE3727752A1 (de) | Verfahren zum herstellen einer stuetzwand | |
| DE3621019A1 (de) | Verfahren zur herstellung eines tunnelbauwerks | |
| DE2727081A1 (de) | Verfahren und vorrichtung zum abdichten von spundwaenden |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20041110 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: AL LT LV MK |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| AKX | Designation fees paid |
Designated state(s): AT CH DE GB LI NL |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT CH DE GB LI NL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20070131 |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REF | Corresponds to: |
Ref document number: 50306443 Country of ref document: DE Date of ref document: 20070322 Kind code of ref document: P |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: KELLER & PARTNER PATENTANWAELTE AG |
|
| NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20071101 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20071223 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20071223 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20081223 Year of fee payment: 6 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20081224 Year of fee payment: 6 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20081216 Year of fee payment: 6 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091223 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091231 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091231 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100701 |