EP3660221A1 - Élément de construction et construction - Google Patents

Élément de construction et construction Download PDF

Info

Publication number
EP3660221A1
EP3660221A1 EP19206695.9A EP19206695A EP3660221A1 EP 3660221 A1 EP3660221 A1 EP 3660221A1 EP 19206695 A EP19206695 A EP 19206695A EP 3660221 A1 EP3660221 A1 EP 3660221A1
Authority
EP
European Patent Office
Prior art keywords
foundations
building
building element
base element
sensors
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP19206695.9A
Other languages
German (de)
English (en)
Other versions
EP3660221B1 (fr
Inventor
Dominik ZÜGER
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Z-Part GmbH
Original Assignee
Z-Part GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Z-Part GmbH filed Critical Z-Part GmbH
Publication of EP3660221A1 publication Critical patent/EP3660221A1/fr
Application granted granted Critical
Publication of EP3660221B1 publication Critical patent/EP3660221B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/50Anchored foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/22Placing by screwing down

Definitions

  • the basic element takes the form of a plate, and the primary screw foundations and the basic element are non-positively connected to one another by means of yoke connections.
  • the screw foundations can be replaced if necessary without having to remove the base element from the floor.
  • the line structure element 10 further comprises at least two secondary screw foundations 13, which are provided for absorbing pressure loads on the base element 11.
  • the line structure element 10 also comprises a support element 14, on which the base element 11 is placed.
  • the line construction element 10 further comprises one or more sensors 40 and / or signal sources for monitoring the stability and integrity of the primary screw foundations 12.
  • the sensors are provided with the transmission means 41 for the transmission of the data measured by the sensors 40 to one remote control center (not shown here). Even if in Figure 1 if it is indicated that sensors 40 and transmission means 41 are connected with a wire, they could just as well be connected wirelessly, for example by means of Wi-Fi or Bluetooth.
  • sensors and transmission means for monitoring the secondary screw foundations 13 could also be provided.
  • sensors 40 and signal sources into the primary screw foundations 12 through the access holes 12c. This enables the integrity and stability of the foundations to be checked. If necessary, changes can be made in good time.
  • sensors 40 For example, optical cameras, infrared cameras, motion sensors, vibration sensors, acoustic sensors and / or seismic sensors can be used as sensors 40. So that images can be taken with optical cameras, signal sources, for example light sources in the form of fiber-optic illuminations, can also be introduced through the access holes 12c into the foundations 12 together with the sensors 41.
  • transmission means 41 are provided in order to transmit the data measured by the sensors to a remote center (not shown).
  • the transmission means 41 advantageously use mobile radio networks such as GMS, GPRS, UMTS or LTE for this transmission.
  • the sensors first transmit their data to a "local" control center, for example by means of Wi-Fi or the like, and that this is local
  • the control center sends the collected sensor data to a delocalized control center.
  • the electrical energy required for the sensors and transmission means can be obtained, for example, by solar panels (not shown) attached to the basic elements 11, 21.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
EP19206695.9A 2018-11-27 2019-11-01 Élément de construction et construction Active EP3660221B1 (fr)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH01464/18A CH715591A1 (de) 2018-11-27 2018-11-27 Bauwerkelement und Bauwerk.

Publications (2)

Publication Number Publication Date
EP3660221A1 true EP3660221A1 (fr) 2020-06-03
EP3660221B1 EP3660221B1 (fr) 2022-09-28

Family

ID=65903854

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19206695.9A Active EP3660221B1 (fr) 2018-11-27 2019-11-01 Élément de construction et construction

Country Status (3)

Country Link
EP (1) EP3660221B1 (fr)
CH (1) CH715591A1 (fr)
DK (1) DK3660221T3 (fr)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006219829A (ja) * 2005-02-08 2006-08-24 Sumitomo Denko Steel Wire Kk コンクリート構造物の補強方法
WO2007014013A2 (fr) * 2005-07-22 2007-02-01 Ben Stroyer Promenade en bois, panneau-plancher (deck) et systeme de plate-forme
WO2008002308A2 (fr) * 2006-06-28 2008-01-03 Timmerman James E Procédés, systèmes et appareil de retenue de digues
DE102015104395A1 (de) * 2015-03-24 2016-09-29 Christina Behrens Schraubfundament
KR20180094548A (ko) * 2017-02-16 2018-08-24 ㈜유신피플 가드레일의 지주 지지력 보강구조

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006219829A (ja) * 2005-02-08 2006-08-24 Sumitomo Denko Steel Wire Kk コンクリート構造物の補強方法
WO2007014013A2 (fr) * 2005-07-22 2007-02-01 Ben Stroyer Promenade en bois, panneau-plancher (deck) et systeme de plate-forme
WO2008002308A2 (fr) * 2006-06-28 2008-01-03 Timmerman James E Procédés, systèmes et appareil de retenue de digues
DE102015104395A1 (de) * 2015-03-24 2016-09-29 Christina Behrens Schraubfundament
KR20180094548A (ko) * 2017-02-16 2018-08-24 ㈜유신피플 가드레일의 지주 지지력 보강구조

Also Published As

Publication number Publication date
EP3660221B1 (fr) 2022-09-28
DK3660221T3 (da) 2022-11-07
CH715591A1 (de) 2020-05-29

Similar Documents

Publication Publication Date Title
AT517958B1 (de) Fundament für ein Windrad
DE102004017006B4 (de) Verfahren zum Errichten eines Turmes
AT517959B1 (de) Fundament für ein Windrad
EP3597840A1 (fr) Installation modulaire et set de montage pour une installation modulaire
EP1735506A1 (fr) Procede permettant d'eriger une tour
EP3441527B1 (fr) Dispositif de blocage destiné à empêcher la circulation des véhicules terrestres
DE102009016893A1 (de) Verankerungsbauteil für einen Windenergieanlagenturm
DE102007018743A1 (de) Verfahren und System zur Steuerung von Verdichtungsmaschinen
DE102009019709A1 (de) Verfahren zum Errichten eines Turmes und Turm
DE2258721C3 (de) Verbindungseinrichtung zum Verbinden von vorgefertigten Spannbetonteilen
DE102011105061B4 (de) Einbetonierbare, verschieblich ausgebildete Kopfkonstuktion zur Verankerung von Zugelementen an zyklisch beanspruchten Bauteilen
EP3901374B1 (fr) Procédé et agencement de surveillance d'une fondation de construction
EP3660221B1 (fr) Élément de construction et construction
CH718234B1 (de) Vorgespanntes kreisförmiges Spanngurt-Trägersystem und Verfahren zur Steuerung der Verformung des vorgespannten kreisförmigen Spanngurt-Trägersystems.
EP4323588B1 (fr) Procédé de réalisation d'une liaison entre deux segments de tuyau d'une structure de type tour
DE3107506A1 (de) Verankerungselement
EP1304419A1 (fr) Procédé pour démontrer l'intégrité structurelle de systèmes structuraux en cas d'incendie
EP2784238A2 (fr) Traverse et procédé de montage
WO2018162575A2 (fr) Ensemble de surveillance de trafic
DE202014009970U1 (de) Kraftmesseinrichtung
DE3302075A1 (de) Spannbeton- oder stahlbetonbiegetraeger
EP3626890A1 (fr) Procédé d'essai de portance d'une fondation
DE102019126629A1 (de) Fundament für eine Windkraftanlage
DE3121045C2 (de) Vor Schäden durch Bodenerschütterungen geschützter, räumlich schwimmend gelagerter Körper
DE3431657A1 (de) Vorrichtung zur sicherung von gebaeudekonstruktionen gegen dynamische belastungen

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20201203

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20220322

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAL Information related to payment of fee for publishing/printing deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR3

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

INTC Intention to grant announced (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

INTG Intention to grant announced

Effective date: 20220809

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1521311

Country of ref document: AT

Kind code of ref document: T

Effective date: 20221015

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502019005752

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20221101

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20220928

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230130

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230128

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502019005752

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20221130

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221101

26N No opposition filed

Effective date: 20230629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20191101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

REG Reference to a national code

Ref country code: CH

Ref legal event code: U11

Free format text: ST27 STATUS EVENT CODE: U-0-0-U10-U11 (AS PROVIDED BY THE NATIONAL OFFICE)

Effective date: 20251201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20251119

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20251118

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20251120

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20251118

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20251117

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20251119

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20251120

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20251201

Year of fee payment: 7

Ref country code: SE

Payment date: 20251119

Year of fee payment: 7