ES2178939B1 - Bomba de hormigonar perfeccionada. - Google Patents
Bomba de hormigonar perfeccionada.Info
- Publication number
- ES2178939B1 ES2178939B1 ES200002742A ES200002742A ES2178939B1 ES 2178939 B1 ES2178939 B1 ES 2178939B1 ES 200002742 A ES200002742 A ES 200002742A ES 200002742 A ES200002742 A ES 200002742A ES 2178939 B1 ES2178939 B1 ES 2178939B1
- Authority
- ES
- Spain
- Prior art keywords
- concrete
- cdot
- pump
- hopper
- cylinders
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004140 cleaning Methods 0.000 abstract 3
- 230000007246 mechanism Effects 0.000 abstract 2
- 238000005086 pumping Methods 0.000 abstract 2
- 238000010521 absorption reaction Methods 0.000 abstract 1
- 230000015556 catabolic process Effects 0.000 abstract 1
- 230000005465 channeling Effects 0.000 abstract 1
- 238000009434 installation Methods 0.000 abstract 1
- 238000012423 maintenance Methods 0.000 abstract 1
- 230000001105 regulatory effect Effects 0.000 abstract 1
- 230000002441 reversible effect Effects 0.000 abstract 1
- 239000000523 sample Substances 0.000 abstract 1
Landscapes
- Reciprocating Pumps (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Details Of Reciprocating Pumps (AREA)
Abstract
Bomba de hormigonar perfeccionada.
Bomba de hormigonar perfeccionada de las
constituidas a partir de una instalación sobre el chasis de un
camión accionada por motores y tres bombas hidráulicas.
El hormigón es depositado en la tolva, bien por
el mismo camión o por otro. De ahí, es absorbido por uno de los
cilindros a través de los codos de forma que cuando uno de los
cilindros aspira, el otro impulsa el hormigón aspirado
anteriormente, mediante el empleo del tubo oscilante a través de la
tubería de distribución sostenida por la pluma hasta la obra.
El volumen del hormigón recibido en la tolva
puede regularse automáticamente mediante una sonda de nivel.
La bomba y mecanismos auxiliares se manejan
mediante tres distribuidores canalizadores del flujo, y pueden
manejarse con botonera o por radio.
La bomba cuenta, además, con un agitador
reversible para facilitar la absorción del hormigón.
Principales ventajas del sistema de bombeo:
\cdot Aspiración directa y de gran diámetro. El
hormigón desemboca directamente de la tolva a los codos y de éstos
a los cilindros de bombeo. No hay estrangulamientos ni cambios
bruscos de dirección. El rendimiento real es muy próximo al
teórico, incluso con hormigones de consistencia seca.
\cdot Recorrido de impulsión de amplia sección
y casi lineal. Curvas y reducciones suaves. La pérdidas de presión
en el interior de la bomba son mínimas. \cdot Los codos que
comunican la tolva con los cilindros transportadores se desplazan
muy sencillamente, por medio de cilindros hidráulicos, facilitando
la limpieza y el montaje de los émbolos, y disminuyendo el tiempo de
mantenimiento.
\cdot El mecanismo del tubo de vaivén está
fuera de la tolva de recepción, eliminando desgastes y, por lo
tanto, averías.
\cdot Perfecto ajuste del tubo oscilante,
gracias al sistema de regulación para compensar el desgaste.
\cdot Presión de bombeo adecuada. Se adapta
automáticamente a los requerimientos del bombeo, llegando a las
altas presiones necesarias para el transporte de hormigones de gran
resistencia al deslizamiento.
\cdot Rendimiento regulable sin
escalonamientos. Flujo de hormigón continuo.
\cdot Posición de inversión, para aspirar el
hormigón de la tubería hacia la tolva en operaciones de limpieza y
deshacer eventuales atascos en la misma.
\cdot Facilidad de limpieza. En pocos minutos.
No hay que desmontar ninguna caja de válvulas. Accesibilidad
perfecta.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| ES200002742A ES2178939B1 (es) | 2000-11-15 | 2000-11-15 | Bomba de hormigonar perfeccionada. |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| ES200002742A ES2178939B1 (es) | 2000-11-15 | 2000-11-15 | Bomba de hormigonar perfeccionada. |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| ES2178939A1 ES2178939A1 (es) | 2003-01-01 |
| ES2178939B1 true ES2178939B1 (es) | 2004-10-01 |
Family
ID=8495650
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| ES200002742A Expired - Fee Related ES2178939B1 (es) | 2000-11-15 | 2000-11-15 | Bomba de hormigonar perfeccionada. |
Country Status (1)
| Country | Link |
|---|---|
| ES (1) | ES2178939B1 (es) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO1990009266A1 (en) * | 1989-02-14 | 1990-08-23 | Risto Minkkinen | A distribution system for concrete |
| ES2111335T3 (es) * | 1993-12-24 | 1998-03-01 | Putzmeister Ag | Dispositivo de corredera de una bomba para materiales espesos de dos cilindros. |
| ES2124426T3 (es) * | 1993-09-07 | 1999-02-01 | Putzmeister Ag | Grupo alimentador de presion y de mando para una bomba automotriz de hormigon. |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3681833B2 (ja) * | 1996-09-19 | 2005-08-10 | ヤンマー株式会社 | 掘削旋回作業機の油圧回路 |
-
2000
- 2000-11-15 ES ES200002742A patent/ES2178939B1/es not_active Expired - Fee Related
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO1990009266A1 (en) * | 1989-02-14 | 1990-08-23 | Risto Minkkinen | A distribution system for concrete |
| ES2124426T3 (es) * | 1993-09-07 | 1999-02-01 | Putzmeister Ag | Grupo alimentador de presion y de mando para una bomba automotriz de hormigon. |
| ES2111335T3 (es) * | 1993-12-24 | 1998-03-01 | Putzmeister Ag | Dispositivo de corredera de una bomba para materiales espesos de dos cilindros. |
Also Published As
| Publication number | Publication date |
|---|---|
| ES2178939A1 (es) | 2003-01-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| FI98644C (fi) | Ejektorilaite | |
| KR101864666B1 (ko) | 공기압을 이용한 이동식 슬러리 이송 장치 | |
| UA81498C2 (en) | Device and method for controlling a thick matter pump | |
| JP5528928B2 (ja) | 穿孔機における粉塵防止システム | |
| ES2178939B1 (es) | Bomba de hormigonar perfeccionada. | |
| US4569642A (en) | Slurry pump | |
| CN206917817U (zh) | 一种大方量混凝土泵送装置 | |
| KR20150032932A (ko) | 이동식 콘크리트 펌프 및 상기 이동식 콘크리트 펌프를 이송 상태에서 사용하기 위한 방법 | |
| US6499968B2 (en) | Integral pump and control valve | |
| SE0601870L (sv) | Doseringspump | |
| KR100882859B1 (ko) | 슬러지 이송 장치 | |
| KR100827769B1 (ko) | 믹서차량식 살포장치 | |
| KR20190088226A (ko) | 콘크리트 펌프카의 잔여 콘크리트 회수장치 | |
| CN103352513A (zh) | 下水道疏通机 | |
| CN204456887U (zh) | 一种具有排涝功能的混凝土泵车 | |
| CN2869376Y (zh) | 一种风动双液注浆泵 | |
| KR100274055B1 (ko) | 콘크리트 펌프 | |
| JP2000230477A (ja) | ピストンポンプの切換衝撃低減装置 | |
| KR0133173B1 (ko) | 공압식 콘크리트 송출장치 | |
| CN209012151U (zh) | 一种液压推杆驱动系统 | |
| ES2325886T3 (es) | Sistema de bombas portatil. | |
| CN207526660U (zh) | 一种双缸式污泥连续泵送装置 | |
| KR100399216B1 (ko) | 주행식 오거스크류 펌프를 이용한 준설장치 및 이를이용한 무매연 무소음 무굴착식 차집관거 준설공법 | |
| JP4033287B2 (ja) | 非流動性物質の圧送設備 | |
| ES2958342T3 (es) | Dispositivo para el transporte de materiales gruesos |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| EC2A | Search report published |
Date of ref document: 20030101 Kind code of ref document: A1 |
|
| FG2A | Definitive protection |
Ref document number: 2178939B1 Country of ref document: ES |
|
| FD1A | Patent lapsed |
Effective date: 20100312 |