JP3661041B2 - 駆動階先行上昇型建築工法における柱の建て方精度の補正方法 - Google Patents
駆動階先行上昇型建築工法における柱の建て方精度の補正方法 Download PDFInfo
- Publication number
- JP3661041B2 JP3661041B2 JP16907195A JP16907195A JP3661041B2 JP 3661041 B2 JP3661041 B2 JP 3661041B2 JP 16907195 A JP16907195 A JP 16907195A JP 16907195 A JP16907195 A JP 16907195A JP 3661041 B2 JP3661041 B2 JP 3661041B2
- Authority
- JP
- Japan
- Prior art keywords
- floor
- construction
- column
- driving floor
- accuracy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 35
- 238000000034 method Methods 0.000 title claims description 12
- 230000001174 ascending effect Effects 0.000 claims description 6
- 230000000630 rising effect Effects 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 description 33
- 239000010959 steel Substances 0.000 description 33
- 239000000463 material Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【発明の属する技術分野】
この発明は、建物の最上階として使用される屋根代用の駆動階を先行して上昇させ、駆動階の直下階の床上で次上階の建築作業を進める駆動階先行上昇型建築工法において実施される、施工時の柱(鉄骨柱)の建て方精度を補正する方法に関するものである。
【0002】
【従来の技術】
従来一般のタワークレーン等を用いて建物を構築する工法においては、3層程度の鉄骨柱を本設床の上方に仮組みした後、各鉄骨柱の頂部に複数本のワイヤを四方、八方に取付け、トランシット等を用いて各鉄骨柱の建て方精度を測定し、誤差があると前記複数本のワイヤのうち誤差を補正するのに適切なワイヤをレバー式牽引具等で引っ張り、鉄骨柱の建て方精度を1本ずつ補正する方法が行われている。
【0003】
しかし、上記方法は駆動階先行上昇型建築工法にはそのまま適用できず、また、駆動階先行上昇型建築工法特有の鉄骨柱の建て方精度を補正する方法についての格別な実施例等はない。
【0004】
【発明が解決しようとする課題】
上記した従来一般の鉄骨柱の建て方精度を補正する方法は、各鉄骨柱に複数のワイヤを取付ける他、1本のワイヤに1個ずつレバー式牽引具等を使用するから、仮設資機材が多く必要になる。また、ワイヤを鉄骨柱の頂部に取り付ける作業は本設床からおよそ12m程の高所で行われるため危険な場所で手間の掛かる作業になっている。更に、鉄骨を粗い精度で仮組みした後、鉄骨柱の建て方精度の補正作業を行うので、最終的に精度が確保されるまで数日間は必要となるから、それだけ工期も長びくことになる。
【0005】
従って、本発明の目的は、駆動階先行上昇型建築工法の特長を活かし、仮設資材類及び手間の削減と工期の短縮を図れる鉄骨柱の建て方精度の補正方法を提供することである。
【0006】
【課題を解決するための手段】
上述の課題を解決するための手段として、本発明に係る駆動階先行上昇型建築工法における柱の建て方精度の補正方法は、
駆動階1に引張材2の一端を固定し、前記引張材2の他端は柱の建て方誤差を補正する向きに略水平方向に補正力を発生させる角度で既設の躯体3に固定し、前記駆動階1を若干上昇させて、前記引張材2に発生する適度な張力と駆動階1の上昇力との合力を補正力として柱4の建て方誤差を補正し、しかる後、前記柱4と次上階床の梁鉄骨5を本接合して固定することを特徴とする。
【0007】
【発明の実施の形態】
以下、本発明の実施例の形態を図面に基づいて説明する。
図1は、建物のN階まで躯体3の建築を完成した後、このN階の躯体3の床上で次上階床(N+1階)の梁鉄骨5を組むなど躯体の建築を進める段階を示している。前記躯体3からは上方に略垂直に複数層分の鉄骨柱4が建てられ、該鉄骨柱4に反力をとり上昇するプッシュアップ装置6が駆動階1を先行上昇させるように取り付けられている。次上階の梁鉄骨5等の組立てをN階の本設床の上で完成した後は、駆動階1に直接、吊具7によって吊り下げた形で駆動階1を上昇させることにより前記梁鉄骨5等をN+1階位置へ持ち上げ、前記鉄骨柱4と仮接合する。
【0008】
梁鉄骨5の本接合の前に、前記したように、先行して建てられた鉄骨柱4の垂直精度をトランシット等により確認する。そして、建て方誤差が発見されたときは、まず駆動階1に予め取り付けてあるブラケット8に引張材2の一端を固定し、前記引張材2の他端は鉄骨柱4の建て方誤差を補正する向きに略水平方向の補正力を発生させる角度で既設の躯体3に用意したブラケット8に固定する。前記引張材2にはワイヤ、鋼棒等が使用され、建て方誤差の状況に応じて複数本使用する。しかる後に、前記駆動階1を若干上昇させると、その上昇力に伴ない前記引張材2に相応の引張力が発生する。その結果、前記上昇力と引張力との合力が略水平方向に発生し、前記合力が補正力となり駆動階1を介して建て方誤差のある鉄骨柱4がその誤差を解消する方向へ押しやられる。従って、前記トランシット等で監視しながら、当該鉄骨柱4の建て方誤差が零になるまで駆動階1の上昇をつづけることにより、鉄骨柱4の建て方精度の補正が達成される。かくして建て方誤差を補正された鉄骨柱4は、仮接合してある梁鉄骨5と本接合することにより補正した状態をきっちり固定できる。補正作業の終了後は、駆動階1を元の位置まで下降させ、引張材2を撤去し、再び建築作業を進めることになる。以後、同様な工程を繰り返すと、鉄骨柱4の建て方誤差を解消しつつ建物の建築が高精度に進むのである。
【0009】
図1は全ての鉄骨柱4が駆動階1を介して一気に補正される構成であるのに対し、図2は建て方誤差の方向が共通しない右端の鉄骨柱4は駆動階1に届かない長さとし、もって補正作業の影響を受けない構成とした実施例を示している。
つまり、本発明の補正方法は、複数本の鉄骨柱4の補正を駆動階1を介して一気に行えるが、誤差の内容によっては、誤差が共通する鉄骨柱4を選択して補正することを特徴とする。
【0010】
【本発明が奏する効果】
本発明に係る駆動階先行上昇型建築工法における柱の建て方精度の補正方法は、複数の鉄骨柱の垂直精度を駆動階を介して一気に補正できるから、使用するワイヤの本数は柱の本数に比例せず、少数でよく、またレバー式牽引具は必要ない。よって手間が掛からず、それに伴い工期の短縮を図れる。また、レバー式牽引具等の仮設資機材は不要でありコストの削減に貢献する。
【図面の簡単な説明】
【図1】本発明のプッシュアップ装置の正面図
【図2】異なる実施例を示したプッシュアップ装置の正面図
【符号の説明】
1 駆動階
2 引張材
3 躯体
4 柱
5 梁鉄骨
Claims (1)
- 柱に反力をとるプッシュアップ装置によって駆動階を先行上昇させ、同駆動階の直下階の床上で次上階の建築作業を進める駆動階先行上昇型建築工法において、
駆動階に引張材の一端を固定し、前記引張材の他端は柱の建て方誤差を補正する向きに略水平方向の補正力を発生させる角度で既設の躯体に固定し、前記駆動階を若干上昇させて、前記引張材に発生する張力と駆動階の上昇力との合力を補正力として柱の建て方誤差を補正し、しかる後、前記柱と次上階梁を本接合して固定することを特徴とする柱の建て方精度の補正方法。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16907195A JP3661041B2 (ja) | 1995-07-04 | 1995-07-04 | 駆動階先行上昇型建築工法における柱の建て方精度の補正方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16907195A JP3661041B2 (ja) | 1995-07-04 | 1995-07-04 | 駆動階先行上昇型建築工法における柱の建て方精度の補正方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0921235A JPH0921235A (ja) | 1997-01-21 |
| JP3661041B2 true JP3661041B2 (ja) | 2005-06-15 |
Family
ID=15879794
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP16907195A Expired - Fee Related JP3661041B2 (ja) | 1995-07-04 | 1995-07-04 | 駆動階先行上昇型建築工法における柱の建て方精度の補正方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3661041B2 (ja) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103572837B (zh) * | 2012-07-30 | 2016-08-10 | 上海天演建筑物移位工程有限公司 | 一种建筑物顶升方法 |
| CN104234439B (zh) * | 2014-09-03 | 2016-06-01 | 中铁十六局集团城市建设发展有限公司 | 集成架提升过程中的角度调整装置和角度调整方法 |
-
1995
- 1995-07-04 JP JP16907195A patent/JP3661041B2/ja not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0921235A (ja) | 1997-01-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3661041B2 (ja) | 駆動階先行上昇型建築工法における柱の建て方精度の補正方法 | |
| CN113445740B (zh) | 一种桁架施工方法 | |
| JP2000144637A (ja) | 押出し工法における橋桁の支持構造 | |
| JP4099491B2 (ja) | ヘリコプタによる鉄塔組立工法及び作業用治具 | |
| JPH09189132A (ja) | 鉄骨柱の柱脚部固定工法 | |
| JP3471248B2 (ja) | 門型クレーン | |
| JPH10194634A (ja) | ホームエレベータユニット | |
| JPH11159007A (ja) | モジュール柱脚構造とその据え付け工法 | |
| JPS62309B2 (ja) | ||
| JPS5840629B2 (ja) | 送電用鉄塔の組立工法 | |
| JPH0387439A (ja) | 建築工法 | |
| JPH06294127A (ja) | 屏風建て鋼矢板の施工法 | |
| JPH02104871A (ja) | 吊上げ工法によるタンクの組立て方法 | |
| JPS6213659A (ja) | 建物の鉄骨建方工法 | |
| JPS6338802A (ja) | ボイラ鉄骨の組立方法 | |
| JP2878571B2 (ja) | 建設装置による建物構築方法 | |
| JP2989337B2 (ja) | 鉄骨鉄筋コンクリート構造における梁の先組工法 | |
| JP2622313B2 (ja) | 建築物の構築方法 | |
| JPS5955963A (ja) | 送電鉄塔嵩上げ工法及び同装置 | |
| JP3089348B2 (ja) | ルーフプッシュアップ工法における駆動階の柱梁仕口部 | |
| JP2996870B2 (ja) | 屋根構造体架構方法 | |
| JP2881503B2 (ja) | ストロ−ク柱代用の仮支柱 | |
| JPS61274048A (ja) | 壁鉄筋の組立工法 | |
| JPH0938917A (ja) | パネルの製造方法およびその装置 | |
| JPH06146591A (ja) | 建築物の構築方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20040817 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040831 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040909 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050207 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050307 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090401 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100401 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100401 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110401 Year of fee payment: 6 |
|
| LAPS | Cancellation because of no payment of annual fees |