JPH02266200A - Transferrer for fluid and pig receiving valve - Google Patents
Transferrer for fluid and pig receiving valveInfo
- Publication number
- JPH02266200A JPH02266200A JP8559989A JP8559989A JPH02266200A JP H02266200 A JPH02266200 A JP H02266200A JP 8559989 A JP8559989 A JP 8559989A JP 8559989 A JP8559989 A JP 8559989A JP H02266200 A JPH02266200 A JP H02266200A
- Authority
- JP
- Japan
- Prior art keywords
- valve
- big
- vig
- fluid
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B9/00—Cleaning hollow articles by methods or apparatus specially adapted thereto
- B08B9/02—Cleaning pipes or tubes or systems of pipes or tubes
- B08B9/027—Cleaning the internal surfaces; Removal of blockages
- B08B9/04—Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes
- B08B9/053—Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved along the pipes by a fluid, e.g. by fluid pressure or by suction
- B08B9/055—Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved along the pipes by a fluid, e.g. by fluid pressure or by suction the cleaning devices conforming to, or being conformable to, substantially the same cross-section of the pipes, e.g. pigs or moles
- B08B9/0551—Control mechanisms therefor
Landscapes
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Pipeline Systems (AREA)
Abstract
Description
【発明の詳細な説明】
〈産業上の利用分野〉
本発明はビグ式流動体の移送装置およびこの移送装置に
あってビグを受けるビグレシービング弁に関する。DETAILED DESCRIPTION OF THE INVENTION <Industrial Application Field> The present invention relates to a VIG-type fluid transfer device and a VIG receiving valve in the transfer device that receives a VIG.
〈従来の技術〉
従来のこの種のビグを用いた流動体の移送装置としては
例えば第8図に示すようなものがあった。<Prior Art> As a conventional fluid transfer device using this type of VIG, there is one shown in FIG. 8, for example.
また、第9図にはその移送装置におけるビグレシーバと
その開閉弁とを示している。Further, FIG. 9 shows a big receiver and its on-off valve in the transfer device.
この移送装置では、移送管1を含む流動体の移送経路に
配設された開閉弁2.3.4を開いた状態で、移送元5
から移送先6へ成る種類の流動体の移送か終了したとこ
ろで、開閉弁7を開いてビグランチャ8から移送経路内
にビグ9を入れる。In this transfer device, the transfer source 5
When the transfer of the type of fluid from to the transfer destination 6 is completed, the on-off valve 7 is opened and the VIG 9 is introduced from the VIG launcher 8 into the transfer path.
次いて、移送元5から移送対象となる次の流動体を弁2
を通してビグ9の後ろζこ送給し、ごの流動体の送給圧
をビグ9に背圧として付加し、移送管1内で先の流動体
と後からの流動体とを仕切った状態てビグ9をピグレシ
ーバ10側へ移動させる。Next, the next fluid to be transferred is transferred from the transfer source 5 to the valve 2.
The fluid is fed to the back of the BIG 9 through the pipe 1, and the feeding pressure of the previous fluid is added to the BIG 9 as back pressure, and the fluid before and the fluid from the back are separated in the transfer pipe 1. Move the big 9 to the pig receiver 10 side.
そして、シグナラー11てビグ9の通過を検出したとこ
ろで、弁4を閉しるとともに、ピグレシーバ】Oへの入
口弁】2、出口弁13.14を開き、先の流動体を弁1
3.14を通る経路15から移送先6へ回収する。Then, when the signaler 11 detects the passage of the big 9, it closes the valve 4, opens the inlet valve 2 and the outlet valve 13, 14 to the pig receiver O, and transfers the previous fluid to the valve 1.
3. Recover to destination 6 via route 15 passing through 14.
そして、ビグ9がピグレシーバ】0に到着したことをシ
グナラー16で検出したところで、次の流動体に対応し
た経路の弁17を開くと共に弁12.13.14を閉じ
、次の流動体をこれに対応した移送先18へ通路19を
通して移送する。When the signaler 16 detects that the Big 9 has arrived at the pig receiver ] 0, the valve 17 of the path corresponding to the next fluid is opened, and the valves 12, 13, and 14 are closed, and the next fluid is transferred to this. It is transferred to the corresponding destination 18 through the passage 19.
尚、ビグレシーバ10内ζこ到着したビグ9の取り出し
は、弁20を開いてポンプ22を運転させ、残留流動体
をドレイン23に回収するときに行う。The VIG 9 that has arrived in the VIG receiver 10 is taken out when the valve 20 is opened, the pump 22 is operated, and the residual fluid is collected into the drain 23.
また、図にあって24.25は別の種類の流動体の移送
先である。Further, in the figure, 24 and 25 are destinations for transferring another type of fluid.
ここで、第9図に示すように、ピグレシーバ10と移送
管1との間のビグレシーバ入口弁12は、管路を単に開
閉するものである。すなわち、インナバルブ26は、管
路27と同径の連通路28を有している。また、インナ
バルブ26は軸29によって管路27に対してその開閉
を切り換えるものである。Here, as shown in FIG. 9, the big receiver inlet valve 12 between the pig receiver 10 and the transfer pipe 1 simply opens and closes the pipe line. That is, the inner valve 26 has a communication passage 28 having the same diameter as the pipe line 27. Further, the inner valve 26 is switched to open or close with respect to the conduit 27 by means of a shaft 29.
〈発明が解決しようとする課題〉
しかしながら、このような従来の移送装置にあっては、
移送する流動体の種類を切り換える度に通路15.19
内で流動体同士の混濁(コンタミネーション)が生じて
しまうものであった。<Problem to be solved by the invention> However, in such a conventional transfer device,
Passage 15.19 every time the type of fluid to be transferred is switched.
This resulted in turbidity (contamination) between the fluids within the tank.
すなわち、この移送装置にあっては、ビグ9がビグレシ
ービング弁12を通過してピグレシーバ10に到達した
時に、該ビグレシーバ10内壁との間でのシール性を喪
失する。そして、シグナラー16によってビグ9の通過
を検出してビグレシービング弁12が全閉となるまでの
間はそれらのビグ前後の流動体の混濁が生してしまうと
いう不具合があった。したがって、移送流動体間での混
濁量を減少するためには、ビグ通過からビグレシービン
グ弁12の閉止までの所要時間を減少することが必要で
ある。しかしながら、この時間の短縮には、開閉用動力
源の供給面、および機械的な面での制約があり、ビグレ
シーバ内での前後流動体の混濁を完全に回避することは
不可能であった。That is, in this transfer device, when the VIG 9 passes through the VIG receiving valve 12 and reaches the PIG receiver 10, the sealing property with the inner wall of the VIG receiver 10 is lost. Then, there is a problem in that the fluid before and after the vigs becomes turbid until the passage of the vigs 9 is detected by the signaler 16 and the vigs receiving valve 12 is fully closed. Therefore, in order to reduce the amount of turbidity between the transferred fluids, it is necessary to reduce the time required from passing through the VIG to closing and closing the VIG receiving valve 12. However, this reduction in time has limitations in terms of the supply of power source for opening and closing and mechanical aspects, and it has been impossible to completely avoid turbidity of the fluid before and after inside the big receiver.
例えば、ビグレシービング弁の開閉所要時間の長短に拘
らず、ビグレシービング弁の下流部にあって混濁を防止
する何らかの手段を講するか、または、ビグレシーバ内
のビグがその内壁とのシール性を失う前にビグレシービ
ング弁弁を全閉するように移送流動体の速度を低下させ
ることが考えられるが、これは移送能率の大幅な低下等
の問題点が生じていたものである。For example, regardless of the length of time it takes to open and close the big receiving valve, some measure must be taken downstream of the big receiving valve to prevent turbidity, or the big in the big receiver loses its seal with its inner wall. Previously, it was considered to reduce the speed of the transferred fluid by fully closing the big receiving valve, but this had problems such as a significant drop in transfer efficiency.
そこで、本願の発明は、ピグレシーバに最も近く配設さ
れた分岐管と移送管との分岐部に、ビグ前の流動体を該
分岐管に移送した後、ビグの到達後ビグをピグレシーバ
に切り換え送給するビグレシービング弁を配設した流動
体の移送装置、および、該移送装置にも使用して好適な
新規な構造のビグレシービング弁を提供することを目的
としている。Therefore, the invention of the present application transfers the fluid before the VIG to the branch pipe between the branch pipe and the transfer pipe disposed closest to the PIG receiver, and then switches the VIG to the PIG receiver and transfers the fluid after the VIG reaches the branch pipe. The present invention aims to provide a fluid transfer device equipped with a big receiving valve for supplying fluid, and a big receiving valve with a novel structure suitable for use in the transfer device.
〈課題を解決するための手段〉
本願の第1の発明に係る流動体の移送装置は、移送管の
内周面に密接した状態で当該移送管内を移動するビグに
より、移送管内で複数種類の流動体を互いに仕切って移
送する流動体の移送装置において、上記ビグを移送管内
に供給するビグランチャと、移送管から互いに並列に分
岐されて流動体の種類に応じた移送先にそれぞれ連通ず
る複数の分岐管と、これらの分岐管と移送管との分岐部
にあって分岐管に設けられた開閉弁と、これらの分岐部
をビグが通過したことを検出するシグナラーと、先に移
送されている流動体に対応した分岐管の分岐部をビグが
通過することにより当該分岐部の開閉弁を閉止させると
ともに、この流動体に続く流動体に対応した分岐管の分
岐部をビグが通過することにより当該分岐部の開閉弁を
開放させる制御手段と、移送管内からのビグを受け取る
ビグレシーバと、ビグレシーバに最も近く配設された分
岐管と移送管との分岐部に、ビグ前の流動体を該分岐管
に移送し、ビグをビグレシーバに切り換え送給するビグ
レシービング弁を配設したものである。<Means for Solving the Problems> The fluid transfer device according to the first invention of the present application uses a vig that moves within the transfer pipe in close contact with the inner circumferential surface of the transfer pipe, thereby transferring a plurality of types of fluids within the transfer pipe. In a fluid transfer device that separates fluids and transfers them, there is provided a Vi launcher that supplies the above-mentioned Vig into a transfer pipe, and a plurality of Vi launchers that are branched from the transfer pipe in parallel and communicate with respective transfer destinations depending on the type of fluid. A branch pipe, an on-off valve provided in the branch pipe at the branch part between these branch pipes and the transfer pipe, a signaler that detects that the VIG has passed through these branch parts, and a signaler that detects that the VIG has passed through these branch parts, and When the VIG passes through the branch of the branch pipe corresponding to the fluid, the on-off valve of the branch is closed, and when the VIG passes through the branch of the branch pipe corresponding to the fluid following this fluid, A control means for opening the on-off valve of the branch, a VIG receiver that receives the VIG from within the transfer pipe, and a VIG receiver that directs the fluid before the VIG to the branch between the branch pipe and the transfer pipe, which is disposed closest to the VIG receiver. This system is equipped with a big receiving valve that transfers the water to the pipe and switches the big signal to the big receiver.
また、本願の第2の発明に係るビグレシービング弁は、
移送管の内周面に密接した状態で当該移送管内を移動す
るビグにより移送管内で複数種類の流動体を互いに仕切
って移送する流動体の移送装置において、上記移送管と
流動体の移送先への分岐管との分岐部に配設されたビグ
レシービング弁であって、移送管に連通された入口ポー
トと分岐管およびビグレシーバにそれぞれ連通ずる2つ
の出口ポートとを少なくとも有するバルブボディと、こ
のバルブボディ内に回動自在に支持され、入口ポートと
2つの出口ポートのいずれか一方とを連通ずるオリフィ
スを有するインナバルブと、このオリフィスの開口端に
形成されて入口ポートから送入された上記ビグを受け取
り保持するとともに、保持したビグによってオリフィス
を閉止する凹部と、を有するビグレシービング弁である
。Moreover, the big receiving valve according to the second invention of the present application is
In a fluid transfer device that separates and transfers multiple types of fluids within a transfer pipe by a vig that moves within the transfer pipe in close contact with the inner peripheral surface of the transfer pipe, the transfer pipe and the fluid are transferred to a destination. A big receiving valve disposed at a branch with a branch pipe, the valve body having at least an inlet port communicating with the transfer pipe and two outlet ports communicating with the branch pipe and the big receiver, respectively; An inner valve is rotatably supported within the body and has an orifice that communicates between an inlet port and one of two outlet ports, and the above-mentioned vig is formed at the open end of the orifice and is fed from the inlet port. This is a big receiving valve having a recess for receiving and holding the valve and closing an orifice by the held big.
〈作用〉
本願の第1の発明にあっては、ビグの移動用動力源とし
て次の移送流動体の送給圧を用いて複数種類の流動体の
連続移送を行うとともに、シグナラーでビグの位置を検
出して分岐管の開閉弁の開閉を制御し、流動体を種別毎
にそれに対応した分岐管に案内して流動体間の混濁を抑
制する。この場合、ピグレシービング弁はビグを受け取
ることによって前流動体への出口ポートを閉止してビグ
はビグレシーバに送給するため、混濁は生じない。<Operation> In the first invention of the present application, the feed pressure of the next fluid to be transferred is used as a power source for moving the VIG to continuously transport multiple types of fluids, and the position of the VIG is determined by the signaler. is detected to control the opening and closing of the on-off valves of the branch pipes, and guide the fluids to the corresponding branch pipes for each type to suppress turbidity between the fluids. In this case, the pig receiving valve closes the outlet port to the prefluid by receiving the Vig and the Vig is delivered to the Vig receiver, so no turbidity occurs.
また、本願の第2の発明によれば、ピグレシービング弁
は、ビグをビグレシーバに送り込む前はそのレシーバへ
の出口ポートを完全に閉止しており、送り込む場合には
ビグ前流動体への出口ポートは完全に閉止されているた
め、前後流動体の混濁はピグレシービング弁、およびそ
の下流部分のビグレシーバにあっては生じない。Further, according to the second invention of the present application, the pig receiving valve completely closes the outlet port to the receiver before feeding the Vig to the Vig receiver, and when feeding the Vig, the outlet port to the fluid before the Vig is closed. Since the valve is completely closed, turbidity of the fluid before and after the pig receiving valve and the big receiver located downstream thereof does not occur.
〈実施例〉
本発明に係る流動体の移送装置を第1図〜第6図に示す
一実施例に基づいて具体的に説明する。<Example> A fluid transfer device according to the present invention will be specifically described based on an example shown in FIGS. 1 to 6.
第1図に示すように、移送管50の一端にビグランチャ
51を設け、移送管50の他端にビグレシーバ52を設
けである。As shown in FIG. 1, a big launcher 51 is provided at one end of a transfer pipe 50, and a big receiver 52 is provided at the other end of the transfer pipe 50.
ビグランチャ51にはランチング弁53が設けられ、こ
の弁53の奥側に複数個のビグ(移送管50の内径とほ
ぼ同径の球体)54が装填されている。The Vig launcher 51 is provided with a launching valve 53, and a plurality of Vigs (spherical bodies having approximately the same diameter as the inner diameter of the transfer pipe 50) 54 are loaded on the back side of the valve 53.
ビグランチャ51のランチング弁53より出口側には開
閉弁55を介して流動体導入管56が接続されており、
移送対象となる流動体の移送元57に接続されている。A fluid introduction pipe 56 is connected to the outlet side of the launching valve 53 of the big launcher 51 via an on-off valve 55.
It is connected to a transfer source 57 of the fluid to be transferred.
ビグランチャ51の出口には出口開閉弁58が設けられ
、この弁58を挟んてビグ54の通過を検知するシグナ
ラー59,60が設けられている。An outlet opening/closing valve 58 is provided at the outlet of the Vig launcher 51, and signalers 59 and 60 are provided across the valve 58 to detect passage of the Vig 54.
また、ビグランチャ51の出口部と移送管50lO−
とにはトレイン管61A、61Bの一端か各々接続され
ており、このI・レイン管61A、61Bの他端は流動
体導入管56に接続されでいる。Furthermore, one end of the train pipes 61A and 61B are connected to the exit portion of the big launcher 51 and the transfer pipe 50lO-, respectively, and the other ends of the I/rain pipes 61A and 61B are connected to the fluid introduction pipe 56. There is.
尚、図中の62.63はトレイン管61Aの一端に設け
られた開閉弁、64はドレイン管61A(61B)の他
端に設けられた開閉弁、65.66.67はそれぞれド
レイン管61Bに設けられたポンプ、フィルタ、フロー
スイッチ、68は流動体導入管56に設けられた開閉弁
、69は流動体導入管56の気体導入口(例えば、空気
導入口)に設けられた開閉弁である。In addition, 62, 63 in the figure is an on-off valve provided at one end of the train pipe 61A, 64 is an on-off valve provided at the other end of the drain pipe 61A (61B), and 65, 66, 67 are respective on-off valves provided at the drain pipe 61B. A pump, a filter, and a flow switch are provided; 68 is an on-off valve provided on the fluid introduction pipe 56; and 69 is an on-off valve provided on the gas introduction port (for example, air introduction port) of the fluid introduction pipe 56. .
一方、ビグレシーバ52の入口側の移送管50にはビグ
レシービング弁71が設けられ、ビグレシーバ52の奥
側でこの弁71の近傍にはビグ54を検知するシグナラ
ー72が設けられている。On the other hand, a big receiving valve 71 is provided in the transfer pipe 50 on the inlet side of the big receiver 52, and a signaler 72 for detecting the big 54 is provided near the valve 71 on the back side of the big receiver 52.
ビグレシーバ52には払い出し管73が接続されており
、この払い出し管73にはドレイン弁74を介してトレ
イン管75が接続されている。ドレイン管75はドレイ
ン76に導かれている。A discharge pipe 73 is connected to the big receiver 52, and a train pipe 75 is connected to the discharge pipe 73 via a drain valve 74. Drain pipe 75 is led to drain 76 .
=11
なお、図中の77.78.79はそれぞれトレイン管7
δに配設されたフロースイッチ、フィルタ、ポンプを示
している。80はビグレシーバ52の気体導入口(例え
は、空気導入口)に設けられた開閉弁である。=11 In addition, 77, 78, and 79 in the figure are train pipe 7, respectively.
The flow switch, filter, and pump installed at δ are shown. Reference numeral 80 denotes an on-off valve provided at a gas inlet (for example, an air inlet) of the big receiver 52.
移送り50の下流側でビグレシービング弁710近くに
は複数(本実施例ではA液用、D液用、C法用、D液用
の4本)の分岐管81A、81B181C181Dが互
いに並列に接続されている。On the downstream side of the transfer port 50 and near the big receiving valve 710, a plurality of branch pipes 81A and 81B181C181D (in this embodiment, four for liquid A, liquid D, method C, and liquid D) are connected in parallel to each other. has been done.
これらの分岐管81A、81B、81C,BIDは種類
の異なる流体(A ’を毘 B液、C液、D液)の移送
先82A、82B、82C182F)にそれぞれ接続さ
れている。These branch pipes 81A, 81B, 81C, and BID are respectively connected to destinations 82A, 82B, and 82C182F for transferring different types of fluids (liquid A' to liquid B, liquid C, and liquid D).
また、各分岐管81A、81B、81C,81Dにおい
ては移送管50からの分岐部に近接して開閉弁83A、
83B、83C183Dがそれぞれ設けられている。Further, in each branch pipe 81A, 81B, 81C, 81D, an on-off valve 83A, close to the branch part from the transfer pipe 50,
83B, 83C183D are provided respectively.
さらに、各分岐管81A、81B、81C181Dの途
中にはビグレジ−ピンク弁71からの払い出し液回収用
の合流管84A、84B、、84C。Further, in the middle of each of the branch pipes 81A, 81B, 81C181D, there are confluence pipes 84A, 84B, 84C for collecting the liquid discharged from the Vigrezi-pink valve 71.
84Dがそれぞれ接続されている。これらの合流管84
A、84− B、84C18tIDは1本の合流管84
にまとめられ枝管98に接続されているとともに、弁4
9を介して払い出し管73のドレイン弁74より下流に
接続されている。84D are connected to each other. These merging pipes 84
A, 84-B, 84C18tID is one merging pipe 84
are connected to the branch pipe 98, and the valve 4 is connected to the branch pipe 98.
9 is connected downstream of the drain valve 74 of the discharge pipe 73.
なお、各合流管84A、84B、84C184Dには開
閉弁85A、85B、85C185Dかそれぞれ設けら
れている。In addition, each merging pipe 84A, 84B, 84C184D is provided with an on-off valve 85A, 85B, 85C185D, respectively.
また、各合流管84A、84B、84C184Dにあっ
て、その開閉弁85A、85B、85C185Dと分岐
管81A、81B、81C181Dとの接続部との間に
は、それぞれトレイン弁86A、86B、86C186
Dを有したトレイン管87A、87B、87C,87D
が接続されている。これらのドレイン管87A、87B
、87C187Dは1本のトレインv87にまとめられ
て前記ドレイン管75に接続されている。Further, in each of the merging pipes 84A, 84B, 84C184D, train valves 86A, 86B, 86C186 are provided between the connection parts of the on-off valves 85A, 85B, 85C185D and the branch pipes 81A, 81B, 81C181D, respectively.
Train pipes 87A, 87B, 87C, 87D with D
is connected. These drain pipes 87A, 87B
, 87C187D are combined into one train v87 and connected to the drain pipe 75.
旧記した移送管50の分岐管81A、81B、8 ]
C181Dへの各分岐部にはシグナラー91,92,9
3,94−195,96が設けられている。Branch pipes 81A, 81B, 8 of the previously described transfer pipe 50]
Signalers 91, 92, 9 are installed at each branch to C181D.
3,94-195,96 are provided.
シグナラー91は分岐管配設位置の入口部分、シグナラ
ー92は分岐管81Aへの入口の少し手前部分、シグナ
ラー93は分岐管81Bへの人口の少し手前部分、シグ
ナラー94は分岐管81Cへの入口の少し手前部分、シ
グナラー95は分岐管81Dへの入口の少し手前部分、
シグナラー96は分岐管配設位置の出口部分にそれぞれ
配設されている。The signaler 91 is located at the entrance of the branch pipe installation position, the signaler 92 is located slightly before the entrance to the branch pipe 81A, the signaler 93 is located slightly before the entrance to the branch pipe 81B, and the signaler 94 is located at the entrance to the branch pipe 81C. The signaler 95 is located a little in front of the entrance to the branch pipe 81D,
The signallers 96 are respectively arranged at the outlet portions of the branch pipe arrangement positions.
ここで、上記ビグレシービング弁71は移送管50の各
分岐管81A〜810との分岐部よりも下流部分に配設
されており、その直上流部分の移送管50にはシグナラ
ー97が配設されている。Here, the big receiving valve 71 is disposed downstream of the branch portion of the transfer pipe 50 with each of the branch pipes 81A to 810, and a signaler 97 is disposed in the transfer pipe 50 immediately upstream thereof. ing.
ビグレシービング弁71は三方弁であって枝管98.9
9を介してそれぞれ上記払い出し管84およびビグレシ
ーバ52に接続されている。The big receiving valve 71 is a three-way valve with a branch pipe 98.9.
9 are connected to the discharge pipe 84 and the big receiver 52, respectively.
なお、上記した弁、ポンプ、フロースイッチはすべてシ
ーケンサと称する制御装置101に接続されており、こ
のシーケンサ101によって自動的にその作動を制御さ
れる。The above-described valves, pumps, and flow switches are all connected to a control device 101 called a sequencer, and their operations are automatically controlled by the sequencer 101.
第2図はこのシーケンサ101によってビグレシービン
グ弁71の切換制御する場合の信号との関係を示してい
る。第3図、第4図はビグレジ−ピンク弁71の構造を
示している。FIG. 2 shows the relationship with signals when switching control of the big receiving valve 71 is performed by the sequencer 101. 3 and 4 show the structure of the Vigrezi-pink valve 71. FIG.
これらの図において、ビグレジ−ピンク弁71は、バル
ブボディ102と、該バルブボディ102内に回動自在
に支持された略球形のインナバルブ103とを有してい
る。In these figures, the Vigrezi-pink valve 71 has a valve body 102 and a substantially spherical inner valve 103 rotatably supported within the valve body 102.
バルブボディ102はシートリングによって気密性は保
持され、4つのポート104A、104B、104C,
104Dを有している。ポート104Aは移送管50に
接続されており、流動体およびビグ54の入口ポートで
ある。ポート104B、104Cはそれぞれ枝管99,
98に接続されている。104Bはビグ54およびビグ
復液のビグレシーバ52への出口ポート、104Cはビ
グ前液の払い出し管84への出口ポートである。The valve body 102 is kept airtight by a seat ring, and has four ports 104A, 104B, 104C,
It has 104D. Port 104A is connected to transfer tube 50 and is the fluid and vig 54 inlet port. Ports 104B and 104C are branch pipes 99 and 104C, respectively.
98. 104B is an exit port for the Vig 54 and the Vig condensate liquid to the Vig receiver 52, and 104C is an exit port for the Vig preliquid to the discharge pipe 84.
104Dは圧力スイッチ106へのポートである。104D is a port to pressure switch 106.
上記シグナラー97,72はこのポート104A、10
4Bの近傍にそれぞれ配設されている。The above signalers 97, 72 are connected to these ports 104A, 10
They are respectively arranged near 4B.
これらのシグナラー97,72はビグ54の通過を検出
してシーケンサ101に検出信号を出力している。また
、107はインナバルブ103におけるビグレシービン
グ弁71の閉止を検出するリミットスイッチであって、
シーケンサ101に検出信号を出力している。さらに、
108は電磁弁であって、シーケンサ101からの信号
によってポート104D、104A間の管路110を開
閉している。These signalers 97 and 72 detect the passage of the VIG 54 and output detection signals to the sequencer 101. Further, 107 is a limit switch that detects the closure of the big receiving valve 71 in the inner valve 103,
A detection signal is output to the sequencer 101. moreover,
108 is a solenoid valve that opens and closes the pipe line 110 between the ports 104D and 104A in response to a signal from the sequencer 101.
109はインナバルブ103のアクチュエータで、シー
ケンサ101の出力信号によって動作しインナバルブ1
03の回動位置を切り換えるものである。シーケンサ1
01は、装置の運転開始信号、ビグシグナラー97から
の信号、圧力スイッチ106からの圧力が所定値以上で
あることを知らせる(ビグ54到着)入力信号、リミッ
トスイッチ107からのインナバルブ1030回転角度
信号、等に基づいて、上記電磁弁108、アクチュエー
タ109を制御している。109 is an actuator for the inner valve 103, which is operated by the output signal of the sequencer 101 and
This is to switch the rotation position of 03. Sequencer 1
01 is an operation start signal of the device, a signal from the big signaller 97, an input signal from the pressure switch 106 informing that the pressure is above a predetermined value (arrival of the big 54), an inner valve 1030 rotation angle signal from the limit switch 107, etc. Based on this, the electromagnetic valve 108 and actuator 109 are controlled.
さらに、第3図および第4図に示すように、インナバル
ブ103は略球体をなしており、中央部に貫通するオリ
フィス112を有している。オリフィス112の一端開
口には上記球形のビグ54と同径の球状の凹部113が
形成されている。すなわち、オリフィス112の一端開
口部113はビグ54を受け取ることができる大きさに
凹状に拡開形成されているものである。例えばビグ54
は完全に凹部113内に包持される大きさに形成されて
いる。したがって、入口ポート104Aより該凹部11
3に送り込まれたビグ54はオリフィス112を閉止し
、ピグ後?夜をこのオリフィス112を通して排出する
ことはない。Further, as shown in FIGS. 3 and 4, the inner valve 103 has a substantially spherical shape and has an orifice 112 penetrating through the center. A spherical recess 113 having the same diameter as the spherical big 54 is formed at one end of the orifice 112 . That is, the opening 113 at one end of the orifice 112 is expanded into a concave shape to a size that can receive the vig 54. For example, Big 54
is formed in such a size that it is completely contained within the recess 113. Therefore, from the inlet port 104A, the recess 11
The big 54 sent into 3 closes the orifice 112, and after pigging? No night is expelled through this orifice 112.
また、オリフィス112の開口端である凹部113には
ビグ54の凹部113到達を検出するパイロット弁11
5が配設されている。In addition, a pilot valve 11 is provided at the recess 113 which is the opening end of the orifice 112 to detect when the big 54 reaches the recess 113.
5 are arranged.
このパイロット弁115は第5図、第6図に詳示してい
る。すなわち、パイロット弁115はできるだけビグ5
4が正面から当接する位置に配設されている。また、パ
イロット弁115は、インナバルブ103に形成されて
一端が凹部113に他端がスリット状で外周面に、それ
ぞれ開口する孔116に円筒ケース117を嵌入したも
のである。円筒ケース117内にはバルブ体118がケ
ース軸方向に摺動自在に保持されており、該バルブ体1
18の先端はスプリング119によって凹部113に突
出する方向に常時付勢されている。This pilot valve 115 is shown in detail in FIGS. 5 and 6. That is, the pilot valve 115 is
4 is arranged at a position where it abuts from the front. The pilot valve 115 is formed in the inner valve 103 and has a recess 113 at one end and a slit at the other end, and a cylindrical case 117 is fitted into a hole 116 that opens on the outer peripheral surface. A valve body 118 is held in the cylindrical case 117 so as to be slidable in the axial direction of the case.
The tip of 18 is constantly urged by a spring 119 in the direction of protruding into the recess 113 .
円筒ケース1170所定位置にはオリフィス112と通
路120を介して連通ずる開口121が形成され、一方
バルブ体118には外周面に開口する連通路122が形
成されている。したがって、通常はスプリング119付
勢されて第5図に示す状態にあるバルブ体118が、ビ
グ54の当接によフて第6図の位置に位置すると連通路
122と開口121、通路120が連通ずるものである
。An opening 121 that communicates with the orifice 112 via a passage 120 is formed in a predetermined position of the cylindrical case 1170, while a communication passage 122 that opens on the outer peripheral surface of the valve body 118 is formed. Therefore, when the valve body 118, which is normally in the state shown in FIG. 5 with the spring 119 biased, is brought into contact with the big 54 and positioned in the position shown in FIG. It is a communication trick.
なお、ビグレシービング弁71にあって、第3図に示す
状態にインナバルブ103がある場合は、連通路122
は圧力室123に連通している。圧力室123は上記ボ
ー) 104Dを介して管路110および圧力スイッチ
106に連通、接続されている。Note that if the big receiving valve 71 has the inner valve 103 in the state shown in FIG.
is in communication with the pressure chamber 123. The pressure chamber 123 communicates with and is connected to the conduit 110 and the pressure switch 106 via the above-mentioned bow 104D.
次いて、上記構成の流動体の移送装置の作動を説明する
。Next, the operation of the fluid transfer device configured as described above will be explained.
まず、流体の移送開始に先立って前回の移送作業で移送
した液種(ここではB液種とする)かシーケンサ101
の記憶装置とこ記憶表示されていることを運転員が確認
した後、ランチング弁53を1度開閉させ、ビグランチ
ャ51内に収納されてい−るビグ54のうちの1個をシ
グナラー59を経由させてビグランチャ出目弁58へ導
く。First, before starting to transfer the fluid, the liquid type transferred in the previous transfer operation (here, the B liquid type) is selected from the sequencer 101.
After the operator confirms that the memory display is displayed, the launching valve 53 is opened and closed once, and one of the bigs 54 stored in the big launcher 51 is sent through the signaler 59. It leads to the big launcher exit valve 58.
そして、次に移送する液種(ここではC液種とする)の
移送ポンプの起動を含む移送準備を移送元57で完了し
た後、運転員がシーケンサ101へ移送開始信号を入力
することにより、開閉弁55を開かせる。Then, after the transfer source 57 completes transfer preparation including activation of the transfer pump for the next liquid type to be transferred (here, C liquid type), the operator inputs a transfer start signal to the sequencer 101. The on-off valve 55 is opened.
この結果、既に昇圧されたC液の移送圧がビグランチャ
5]内に加わると共にシーケンサ101で記憶されてい
るB液の分岐管用開閉弁83Bがシーケンサ101によ
る制御で開かれて全開となる。As a result, the transfer pressure of liquid C, which has already been increased in pressure, is applied to the big launcher 5], and the branch pipe on-off valve 83B for liquid B stored in the sequencer 101 is opened and fully opened under the control of the sequencer 101.
そして、シーケンサ101が移送開始信号を受信したの
ち一定時間を経過すると、ビグランチャ出口弁58が開
かれ、ビグ54はC液の移送圧に押されなからビグラン
チャ出口弁58を出て移送り50内をビグレシーバ52
側へ移動する。すなわち、移送管50内のビグ54の前
側に残留するB液を開閉弁83Bを経由して分岐管81
Bから移送先82 B IX押し流し始める。Then, after a certain period of time has passed after the sequencer 101 receives the transfer start signal, the big launcher outlet valve 58 is opened, and the big launcher 54 is not pushed by the transfer pressure of liquid C, so it exits the big launcher outlet valve 58 and enters the transfer 50. big receiver 52
Move to the side. That is, the B liquid remaining in front of the BIG 54 in the transfer pipe 50 is transferred to the branch pipe 81 via the on-off valve 83B.
Transfer destination 82 B IX begins to be washed away from B.
なお、ビグ54がシグナラー60を通過することにより
ビグ移動開始信号かシーケンサ101へ入力される。Note that when the VIG 54 passes through the signaler 60, a VIG movement start signal is input to the sequencer 101.
移送管50内をビグレシーバ52へ向かって移動するビ
グ54が、シグナラー91を通過して液種別シクナラー
92へ到達すると、シーケンサ101によりビグレシー
ビング弁71及びB液合流用開閉弁85Bが開けられる
と共に、合流管84.84B経由で分岐管81Bへ合流
するB液の流速を適度に確保できるようにするため分岐
管用開閉弁83Bの開度が調節される。When the VIG 54 moving toward the VIG receiver 52 in the transfer pipe 50 passes through the signaler 91 and reaches the liquid type synchronizer 92, the VIG receiving valve 71 and the B liquid merging on-off valve 85B are opened by the sequencer 101, and The opening degree of the branch pipe on-off valve 83B is adjusted to ensure an appropriate flow rate of the B liquid that flows into the branch pipe 81B via the merging pipes 84, 84B.
そして、移送’250内を更に移動するビグ54が液種
側シグナラー93に到達すると、シーケンサ101は分
岐管用開閉弁83Bを全開にさせ、ビグ54が液種側シ
グナラー94へ到達するまでの間この状態を維持させる
。Then, when the VIG 54 further moving in the transfer '250 reaches the liquid type side signaler 93, the sequencer 101 fully opens the branch pipe on-off valve 83B, and this continues until the VIG 54 reaches the liquid type side signaler 94. maintain the condition.
そして、移送管50内を移動してビグ54がシグナラー
94へ到達すると、シーケンサ101は液種側分岐管用
開閉弁83Cを開かせる。Then, when the VIG 54 moves within the transfer pipe 50 and reaches the signaler 94, the sequencer 101 opens the liquid type side branch pipe on-off valve 83C.
但し、この時、ビグ54が移送管50内で移動を続行で
きるようにするため、分岐管用開閉弁83Cの開度を調
節してビグ54への背圧を維持する。However, at this time, in order to allow the VIG 54 to continue moving within the transfer pipe 50, the back pressure to the VIG 54 is maintained by adjusting the opening degree of the branch pipe on-off valve 83C.
なお、分岐管用の開閉弁をビグ背圧が維持てきる程度に
開かせるタイミングは、当該分岐管への分岐位置をビグ
54が通過した直後とする他に、当該分岐管への分岐位
置をビグ54が通過してしばらくした後としてもよい。In addition, the timing to open the on-off valve for the branch pipe to the extent that the VIG back pressure can be maintained is not only immediately after the VIG 54 has passed the branch position to the branch pipe, but also when the branch pipe to the branch pipe is opened at the VIG 54. This may be done after a while after 54 has passed.
例えは、A液からB液への移送切り換えの場合、ビグ5
4がシグナラー94到達した時に分岐管用開閉弁83B
をビグ背圧が維持できる程度に開かせる使用態様の他に
、ビグ54がシグナラー95到達した時に分岐管用開閉
弁83Bをビグ背圧が維持てきる程度に開かせる使用態
様としてもよい。For example, when changing the transfer from liquid A to liquid B,
4 reaches the signaler 94, the branch pipe on-off valve 83B
In addition to the mode of use in which the branch pipe on-off valve 83B is opened to the extent that the VIG back pressure can be maintained, when the VIG 54 reaches the signaler 95, the branch pipe on-off valve 83B may be opened to the extent that the VIG back pressure can be maintained.
そして、移送管50内を移動してビグレシービング弁7
1を通過したビグ54がシグナラー72を通過すると、
ビグレシーバ人口弁71はシーケンサ101によりすみ
やかに閉止されると共に分岐管用開閉弁83Cは弁開度
を全開とされる。Then, the big receiving valve 7 is moved inside the transfer pipe 50 and
When the big 54 that passed through 1 passes through the signaler 72,
The big receiver artificial valve 71 is quickly closed by the sequencer 101, and the branch pipe on-off valve 83C is fully opened.
そして、C液の流速を増加させて移送管50ての移送液
種の切換を完了する。Then, the flow rate of liquid C is increased to complete switching of the type of liquid to be transferred in the transfer pipe 50.
なお、シーケンサ101は各種別分岐管の直上流に設け
た2点の種別シグナラー及び直下流に設けた1点のシグ
ナラーからのビグ通過信号を受信して分岐管用開閉弁及
び合流管用開閉弁を制御する機構であるため、流体種類
の屈み合せl1tifが如何に変わっても種別移送が可
能である。The sequencer 101 receives the VIG passage signals from two type signalers provided immediately upstream of each type of branch pipe and one signaler provided immediately downstream, and controls the branch pipe on-off valve and the merging pipe on-off valve. Since the mechanism is such that the type of fluid can be transferred no matter how the bending l1tif of the fluid type changes.
一方、上記のようにしてビグレシーバ52内に到達した
ビグ54はビグレシーバ52内で移動を停止する。On the other hand, the VIG 54 that has reached the VIG receiver 52 as described above stops moving within the VIG receiver 52.
そして、シグナラー72を通過した際の信号を受けたシ
ーケンサ101は、合流管用開閉弁85Bを全開にする
と共にトレイン弁74及び液種側にトレインポンプ吐出
弁86Bを全開とし、更に、トレインポンプ79を起動
させてビグレシーバ52内に残留するB frt及び合
流管用開閉弁8bB上流側に残留するB液を液種側ドレ
インポンプ吐出弁86B経由で分岐管81Bへ移送し、
系内残留液を回収する。Then, the sequencer 101 that receives the signal when it passes the signaler 72 fully opens the confluence pipe on-off valve 85B, fully opens the train valve 74 and the train pump discharge valve 86B on the liquid type side, and further opens the train pump 79. When activated, the B frt remaining in the big receiver 52 and the B liquid remaining upstream of the confluence pipe on-off valve 8bB are transferred to the branch pipe 81B via the liquid type side drain pump discharge valve 86B,
Collect the remaining liquid in the system.
なお、トレインポンプ79起動後の定時間経過後、気体
吸入弁80をシーケンサ101により開けて系内の残留
液の回収を確実なものとするが、系内残留液が無くなっ
てドレイン回収液が無くなった時点をフロースイッチ7
7が検知し、ドレインポンプ79を停止させると共にド
レインポンプ液種別吐出弁86B、ドルイン弁74を各
々全閉とし、この状態を一定時間続けてビグレシーバ廻
りの残留液回収を終了する。Note that after a certain period of time has passed after starting the train pump 79, the gas suction valve 80 is opened by the sequencer 101 to ensure the recovery of the residual liquid in the system, but the residual liquid in the system disappears and the drain recovery liquid disappears. Flow switch 7
7 is detected, the drain pump 79 is stopped, the drain pump liquid type discharge valve 86B and the drain valve 74 are each fully closed, and this state is continued for a certain period of time to complete the recovery of the residual liquid around the big receiver.
上記のようにしてビグレシーバ廻りの残留液回収が終了
し、モしてC?&の移送が終了して、このC液の移送終
了信号をシーケンサ]01へ運転員が入力すると、シー
ケンサ101によりシステム入口弁55及びビグランチ
ャ出口弁58が全閉とされると共にトレイン弁62及び
トレインポンプ吐出弁63が全開とされる。The residual liquid collection around the big receiver is completed as described above, and then C? When the transfer of C liquid is completed and the operator inputs the transfer end signal of this liquid C to the sequencer 01, the sequencer 101 fully closes the system inlet valve 55 and the big launcher outlet valve 58, and also closes the train valve 62 and the train valve 62. The pump discharge valve 63 is fully opened.
そして、ドレインポンプ65を起動させこの起動から一
定時間経過後に気体吸入弁69を全開とさせ、ビグラン
チャ51及び受入配管56内部の残留液を回収する。Then, the drain pump 65 is started, and after a predetermined period of time has elapsed since the start, the gas suction valve 69 is fully opened, and the residual liquid inside the vilauncher 51 and the receiving pipe 56 is recovered.
このようにして系内残留液の回収が終り、トレインポン
プ65が空転すると気体吸入弁69が全閉とされると共
にドレインポンプ65が停止され、移送先分岐用開閉弁
83Cが全閉とされて全作業を終了する。When the residual liquid in the system is collected in this manner and the train pump 65 idles, the gas suction valve 69 is fully closed, the drain pump 65 is stopped, and the destination branch on-off valve 83C is fully closed. Finish all work.
また、本発明は液体のみならず、気体等も含めた流動体
全般の移送に用いることができる。Further, the present invention can be used to transfer not only liquids but also all fluids including gases and the like.
ここで、第3図〜第6図によフてビグレシービング弁7
1の動作について説明する。Here, according to FIGS. 3 to 6, the big receiving valve 7 is
Operation 1 will be explained.
移送作業が次のバッチに入る状態から説明する。We will explain the state in which the transfer operation starts from the next batch.
この状態では、ビグレシービング弁71は第4図に示す
ように全閉となっている。そして、ビグ54は該凹部1
13には存在しないものとする。In this state, the big receiving valve 71 is fully closed as shown in FIG. Then, the big 54 is connected to the recess 1.
13 does not exist.
入口ポート104A側は改のハツチのための流動体(ビ
グ前液)で満たさizでいる。出口ポート104B、1
04C部分は大気圧である。このため、圧力スイッチ1
06はOFF信号をシーケンサ101に入力している。The inlet port 104A side is filled with a fluid for the hatch (Vig pre-liquid). Outlet port 104B, 1
The 04C portion is at atmospheric pressure. For this reason, pressure switch 1
06 inputs an OFF signal to the sequencer 101.
シーケンサ101からインナバルブ103の開弁の信号
がアクチュエータ109に人力されると、インナバルブ
103は第3図に示す状態に90゜回動する。ビグレシ
ービング弁71は全開となる。When a signal for opening the inner valve 103 is inputted from the sequencer 101 to the actuator 109, the inner valve 103 is rotated by 90 degrees to the state shown in FIG. The big receiving valve 71 is fully opened.
移送管50内を送られてきたビグ前液はオリフィス11
2を通過して出口ポート104Cから枝管98に流れる
。このとき、圧力スイッチ106は依然としてOFF信
号出力している。The pre-VIG liquid sent through the transfer pipe 50 is passed through the orifice 11.
2 and flows from outlet port 104C to branch pipe 98. At this time, the pressure switch 106 is still outputting an OFF signal.
ビグ54がシグナラー97を瞬間的にたたいて作動させ
τ凹部1】3に送り込まれると、オリフィス112は完
全にその連通が遮断される。このとき、パイロット弁1
15は動作しく第5図から第6図の状態へと動作する〉
、圧力室123とオリフィス112とを連通ずる。この
結果、ビグ前液はオリフィス112から、通蹟120,
121゜122を介して圧力室123に流入する。ビグ
復液は大口ポー) 104Aからのその流入が停止され
る。When the Vig 54 instantaneously hits the signaler 97 to activate it and is sent into the τ recess 1]3, communication with the orifice 112 is completely cut off. At this time, pilot valve 1
15 operates and moves from the state shown in Fig. 5 to the state shown in Fig. 6.
, the pressure chamber 123 and the orifice 112 are communicated with each other. As a result, the pre-Vig liquid flows from the orifice 112 to the passage 120,
121 and 122 into the pressure chamber 123. The inflow of Big condensate from 104A is stopped.
圧力スイッチ106はこの圧力室123の圧力の上昇を
検知してON信号をシーケンサ101に出力する。The pressure switch 106 detects this increase in pressure in the pressure chamber 123 and outputs an ON signal to the sequencer 101.
シーケンサ101は、上記運転開始信号、シグナラー9
7からの入力信号、圧力スイッチ106のON信号によ
って該ビグレシービング弁71の全閉信号を出力する。The sequencer 101 receives the operation start signal and the signaler 9.
7 and the ON signal of the pressure switch 106, a fully closed signal of the big receiving valve 71 is output.
アクチュエータ109を動作させてインナバルブ】03
を第4図に示す状態にまで回動するものである。Operate the actuator 109 to open the inner valve】03
is rotated to the state shown in FIG.
この状態にあっては、ビグ54がパイロット弁115の
弁体118を押し上げて開放しているため(第6図)、
ビグ復液はスリットから孔116を経由してオリフィス
112に流入してくる。これにより、ビグ54゜は押圧
されて凹部113から離脱し始める。このとき、ビグ5
4がポート104B側に少しだけ移動すると、パイロッ
ト弁115は閉止する。ビグ復液の流入は停止される。In this state, the big 54 pushes up the valve body 118 of the pilot valve 115 to open it (Fig. 6).
The Vig condensate flows from the slit into the orifice 112 via the hole 116. As a result, the big 54° is pressed and begins to separate from the recess 113. At this time, Big 5
4 moves a little toward the port 104B, the pilot valve 115 closes. The inflow of Vig condensate is stopped.
シ−ケンサ101は弁71の全閉をリミットスイッチ1
07によって検出し、電磁弁108を開放する。ビグ抜
液はこの管路110を経由して圧力室123、オリフィ
ス112に流入し、ビグ54をビグレシーバ52に押し
出す結果となる。ビグ54がシグナラー72を叩くと電
磁弁108は管路110を遮断する。The sequencer 101 controls the limit switch 1 to fully close the valve 71.
07, and the solenoid valve 108 is opened. The liquid drained from the VIG flows into the pressure chamber 123 and the orifice 112 via this conduit 110, resulting in pushing the VIG 54 into the VIG receiver 52. When the vig 54 hits the signaler 72, the solenoid valve 108 shuts off the conduit 110.
このようにしてビグレシーバ内でのコンタミネーション
は防止される。In this way contamination within the big receiver is prevented.
第7図は本発明の他の実施例に係るビグレシービング弁
の断面図を示している。FIG. 7 shows a cross-sectional view of a big receiving valve according to another embodiment of the invention.
この図に示すように、このピグレシービング弁200は
、上記実施例のピグレシービング弁71とは異なり、イ
ンナバルブ103にパイロット弁115が装着されてい
ない。したがって、インナバルブ103には、凹部11
3を有するオリフィス112のみが形成されている。そ
して、このパイロット弁に代えて差圧スイッチ201が
配設されている。この差圧スイッチ201は、ビグ54
の凹部113への到着を検知してシーケンサ101に信
号を出力するものである。差圧スイッチには例えはタイ
ヤフラム型差圧スイッチが使用される。差圧スイッチ2
01には管路202.203を介して大口ボー) 10
4A、出口ポート104Cの各圧力が入力される構成で
あって、これらのポート104A、104C間の差圧が
大のとき(ビグレシーブ時)にはON信号を出力するも
のである。管路202は上記管路110のポート104
A側に連通している。なお、圧力室123は管路110
によって電磁弁108を介して入口ボー)104Aに連
通している。As shown in this figure, this pig receiving valve 200 differs from the pig receiving valve 71 of the above embodiment in that the pilot valve 115 is not attached to the inner valve 103. Therefore, the inner valve 103 has a recess 11
Only the orifice 112 with 3 is formed. A differential pressure switch 201 is provided in place of this pilot valve. This differential pressure switch 201 is
The arrival at the recess 113 is detected and a signal is output to the sequencer 101. For example, a tire flam type differential pressure switch is used as the differential pressure switch. Differential pressure switch 2
01 via pipes 202 and 203) 10
4A and outlet port 104C are input, and when the differential pressure between these ports 104A and 104C is large (during big receive), an ON signal is output. Conduit 202 connects to port 104 of conduit 110
It communicates with the A side. Note that the pressure chamber 123 is connected to the pipe line 110.
It communicates with the inlet bow (104A) via a solenoid valve 108.
その他の構成は上記実施例のそれと同様である。The other configurations are the same as those of the above embodiment.
したがって、このピグレシービング弁200にあっては
、入口ポート104Aより凹部113に送り込まれたビ
グ54はオリフィス112を閉止する。この結果、差圧
スイッチ201は管路202.203を介して導入した
入口ボー)104Aと出口ボー)104Cとの差圧が大
であることを検出してシーケンサ101にビグ受取の信
号を出力する。シーケンサ101はアクチュエータ10
9によってインナバルブ103を第4図の軟粘にまで回
動し、電磁弁108によって管路110カ)ら圧力室1
23に高圧を導く。この結果、ビグ54は後)f′2に
よって凹部113から出口ポート104Bを介してビグ
レシーバ52に排出される。更に、ビグ54の排出をシ
グナラー72によって検出し、電磁弁108を閉止する
。Therefore, in this pig receiving valve 200, the vig 54 fed into the recess 113 from the inlet port 104A closes the orifice 112. As a result, the differential pressure switch 201 detects that the differential pressure between the inlet bow) 104A and the outlet bow) 104C introduced via the conduits 202 and 203 is large, and outputs a signal to the sequencer 101 to receive the VIG. . The sequencer 101 is the actuator 10
9 to rotate the inner valve 103 to the soft state shown in FIG.
Lead high pressure to 23. As a result, the VIG 54 is discharged from the recess 113 to the VIG receiver 52 via the outlet port 104B by f'2. Furthermore, the signaller 72 detects the discharge of the VIG 54 and closes the solenoid valve 108.
したがって、ピグレシービング弁200にあっても、ビ
グ54受け取り時、ビグ54はオリフィス1]2を閉止
し、ピグ接液をこのオリフィス112を通して出口ポー
ト104Cから枝管98に排出することはない。ビグ前
液とビグ抜液とのコンタミネーションはこの弁200に
あって完全に防止されているものである。Therefore, even in the pig receiving valve 200, when the big 54 is received, the big 54 closes the orifice 1]2, and the pig wetted liquid is not discharged from the outlet port 104C to the branch pipe 98 through the orifice 112. This valve 200 completely prevents contamination between the VIG pre-liquid and the VIG drained liquid.
この実施例にあっては、コンタミネーションの完全防止
の他にもパイロット弁の廃止によってピグレシービング
弁の小型のものが製作可能となる。In this embodiment, in addition to completely preventing contamination, it is also possible to manufacture a smaller pig receiving valve by eliminating the pilot valve.
よって、小口径移送管にも適用可能となる。Therefore, it can also be applied to small diameter transfer pipes.
〈効果〉
以上説明してきたように、本願の第1の発明の移送装置
によれ(え、ビグレシーバでの流動体の混濁を完全に防
止することができる。とともに複数種類の流動体f:1
つの移送管で連続的に移送することができる。そして、
従来はバルブの開閉タイミングを調節して配管経路にお
けるウォータハンマを防止する必要があったが、本発明
の移送装置にあっては、流体の配管経路中にあって少な
くとも1つのバルブが必ず開放されているため、ウォー
タハンマを完全に防止することができる。<Effects> As explained above, the transfer device of the first invention of the present application can completely prevent turbidity of the fluid in the big receiver.
Continuous transfer is possible with one transfer tube. and,
Conventionally, it was necessary to adjust the opening and closing timing of valves to prevent water hammer in the piping path, but in the transfer device of the present invention, at least one valve in the fluid piping path is always opened. Therefore, water hammer can be completely prevented.
そして、ビグ移動用動力源として圧縮気体を使用しない
ため、液種切換時の移送作業で安全性の向上が期待てき
るとともに、気体昇圧設備及び圧縮気体の送気配管が不
要となり設備費の削減が可能となる。In addition, since compressed gas is not used as the power source for moving the VIG, it is expected to improve safety during transfer operations when switching liquid types, as well as eliminate the need for gas pressure boosting equipment and compressed gas air supply piping, reducing equipment costs. becomes possible.
また、液種切換時、種別シグナラー設置部分のビグ走行
速度の調節が種別分岐管用自動弁の開度調整により可能
となるため、液種切換動作の確実性が向上できる。Furthermore, when switching the liquid type, the traveling speed of the VIG at the part where the type signaler is installed can be adjusted by adjusting the opening degree of the automatic valve for the type branch pipe, so the reliability of the liquid type switching operation can be improved.
また、液種FJJ摸時、ピグレシーバから合流部迄の残
留液処理か切換完了後の次の液の移送時に並行して行う
ことかてきるため、液種切換所用時間か短縮できる。Furthermore, when testing the liquid type FJJ, processing of the residual liquid from the pig receiver to the confluence section can be carried out in parallel with the transfer of the next liquid after the switching is completed, so the time required for changing the liquid type can be shortened.
また、木、顎の第2の発明之こ係るピグレシービング弁
にあっては、ビグ後流動体はビグによって完全に該弁の
通過を遮断されるため、ビグ前流動体との混濁を完全に
防止することかできる。In addition, in the pig receiving valve according to the second invention of Ki and Jin, since the fluid after the Vig is completely blocked from passing through the valve by the Vig, turbidity with the fluid before the Vig can be completely prevented. It can be prevented.
さらに、上記実施例に係るビグレシービング弁にあって
は、パイロット弁をインナバルブくこ■み込んているた
め、ビグ到着を確実に検出することができ、信頼性を向
上させることができる。Furthermore, in the big receiving valve according to the above embodiment, since the pilot valve is inserted into the inner valve, the arrival of the big can be reliably detected and reliability can be improved.
第1図は本発明の一実施例に係る流動体の移送装置の概
略構成図、第2図は一実施例に係るシーケンサとピグレ
シービング弁との関係を示す概略構成図、第3図、第4
図は一実施例に係るそれぞれピグレシービング弁の動作
を説明するためのその断面図、第5図、第6図は同じく
一実施例に係るパイロット弁の動作を説明するための断
面図、第7図は本発明の他の実施例に1系るピグレシー
ビング弁の断面図、第8図は従来の流動体の移送装置の
構成図、第9図は従来の移送装置のビクルシービング弁
を示す断面図である。
50 ・ ・ ・ ・ ・ ・ ・ ・ ・51 ・
・ ・ ・ ・ ・ ・ ・ ・52 ・ ・ ・ ・
・ ◆ ・ ・ ・54 ・ ・ ・ ・ ・ ・
・ ・ ・71 ・ ・ ・ φ ・ ・ ・ ・ ・
81A〜81D ・ ・ ◆ ・
82A〜82D ・ ・ ・ ・
83A〜83D ・ ・ ・ ・
91〜97 ・ ・ ・ ・ ・ ・
98 ・ ・ ・ ・ ・ ・ ・ ・ ・101
・ ・ ・ ・ ・ ・ ・ ・102 ・ ・ ・
・ ・ ・ ・ ・103 ・ ・ ・ ・ ・ ・
・ ・104A・ ・ ・ ・ ・ ・ ・
・移送管、
・ビグランチャ、
・ビグレシーバ、
・ビグ、
・ピグレシービング弁、
・分岐管、
・移送先、
・開閉弁、
・シグナラー
・枝管、
・シーケンサ、
・バルブボディ・
・インナバルブ、
・入口ポート、
104B、104C−−・出口ポート、112・・・・
・・・・・オリフィス、113・・・・・・・・・凹部
。
特許出願人 三石エンジニアリンク株式会社(他2名)
代理人 弁理士 桑井 清−
第5図
第6
図
手続補正書
5.補正命令の日付
自発
1、事件の表示
平成1年特許願 第85599号
2、発明の名称
流動体の移送装置およびビクルシービング弁3、補正を
する者
事件との関係 特許出願人
住所 東京都港区虎ノ門−丁目6番12号居所
東京都渋谷区神山町40番4号
大月マンション1階
6、補正の対象
明細書の「発明の詳細な説明」の欄及び図面の「第1図
」
7、補正の内容
(1)明細書第11頁第18〜19行に「ドレイン弁7
4を介して」とあるのを、 「トレイン弁74Aを介し
て」と補正する。
(2)同第12頁第3〜4行にr80はビグレシーバ5
2の気体導入口(例えは、空気導入口)」とあるのを、
「80Aはビグレシーバ52の気体導入口であり、80
Bはビクルシービング弁71より開閉弁74B経由で払
い出し液回収用分流管84の気体導入口(例えば、空気
導入口)」と補正する。
(3)同第13頁第3行に「枝管98に接続され」とあ
るのを、「枝管98に開閉弁74Bを介して接続され」
と補正する。
(4)同第13頁第5行に「弁74より」とあるのを、
「弁74Aより」と補正する。
(5)同第20頁第15行に「71及びB液」とあるの
を、「71及び74B並びにB液」と補正する。
(6)同第21頁第5〜6行に「シグナラー94へ到達
」とあるのを、 「シグナラー95へ到達」と補正する
。
(7)同第21頁第20行に「シグナラー95」とある
のを、 「シグナラー97」と補正する。
(8)同第22頁第3〜7行に「そして、移送管50内
を移動してビグレシービング弁71を通過したビグ54
がシグナラー72を通過すると、ビグレシーバ入口弁7
1はシーケンサ101によりすみやかに閉Iトされると
共に分岐管用開閉弁83Cは弁開度を全開とされる。」
とあるのを、 「そして、移送管50内を移動してきた
ビグ54かビグシグナラ−97を通過したのちビグレシ
ービング弁71に到達すると、ビグレシービング弁71
はシーケンサ101によりすみやかに閉止されると共に
分岐管用開閉弁83Cは弁開度を全開とさ、り7る。」
と補正する。
(9)同第23頁第1行に川・レイン弁74及び」とあ
るのを、 「ドレイン弁74B、49及び」と補正する
。
(10)同第23頁第1〜2行に「液種別にトレイン」
とあるのを、 「液種別のトレイン」と補正する。
(11)同第23頁第3〜4行に「起動させてビグレシ
ーバ52内に残留するB液及び」とあるのを、「起動さ
せてビグ前方液の払い出し枝管98及び」と補正する。
(12)同第23頁第4〜5行に「上流側に残留」とあ
るのを、「上流側の合流管84に残留」と補正する。
(13)同第23頁第9行に「気体吸入弁80を」とあ
るのを、「気体吸入弁80Bを」と補正する。
(] 、’l )同第23頁第14〜15行に「トレイ
ン弁74を各々全閉とし・、この状態を一定時間続けて
ビグレシーバ廻りの残留液回収を終了する。」とあるの
を、 [トレイン弁74B及び49を各々全開としたあ
と、次にビグレシーバ52内に残留するビグ復液である
C液を回収するトレイン弁74A及びトレインポンプ種
別吐出弁86Cを全開とし、再ひI・レインポンプ79
を起動させたのち、気体吸入弁80Aをシーケンサ10
1により開け、系内残留液が無くなるまで、この状態を
一定時間続けてビグレシーバ廻りの残留液回収を終了す
る。
」と補正する。
(15)同第25頁第3行にr104c部分は大気圧」
とあるのを、 rl 04C部分は前回の作業でレシー
バ内の滞留液処理及びピグ54取出作業終了後であるた
め大気圧」と補正する。
(16)同第30頁第12行に「動力源として圧縮気体
」とあるのを、 「動力源として空気などの圧縮気体」
と補正する。
(17)別紙の通り、第1図において符号74.80を
それぞれ74A、8 f−、) 、へと変更し、符号7
4B、80Bを追加する。
8、添1寸書類の目録
(1)図面の第1図
1IiU
以上FIG. 1 is a schematic configuration diagram of a fluid transfer device according to an embodiment of the present invention, FIG. 2 is a schematic configuration diagram showing the relationship between a sequencer and a pig receiving valve according to an embodiment, and FIGS. 4
The figures are cross-sectional views for explaining the operation of a pig receiving valve according to one embodiment, FIGS. 5 and 6 are cross-sectional views for explaining the operation of a pilot valve according to an embodiment, and FIG. The figure is a sectional view of a pig receiving valve according to another embodiment of the present invention, FIG. 8 is a block diagram of a conventional fluid transfer device, and FIG. 9 is a vehicle sieving valve of a conventional transfer device. FIG. 50 ・ ・ ・ ・ ・ ・ ・ ・ ・51 ・
・ ・ ・ ・ ・ ・ ・ ・52 ・ ・ ・ ・
・ ◆ ・ ・ ・54 ・ ・ ・ ・ ・ ・
・ ・ ・71 ・ ・ ・ φ ・ ・ ・ ・ ・
81A-81D ・ ・ ◆ ・ 82A-82D ・ ・ ・ 83A-83D ・ ・ ・ 91-97 ・ ・ ・ ・ ・ 98 ・ ・ ・ ・ ・ ・ ・ ・ 101
・ ・ ・ ・ ・ ・ ・ ・102 ・ ・ ・
・ ・ ・ ・ ・103 ・ ・ ・ ・ ・ ・
・ ・104A・ ・ ・ ・ ・ ・ ・ ・Transfer pipe, ・Big launcher, ・Big receiver, ・Big, ・Pig receiving valve, ・Branch pipe, ・Transfer destination, ・Opening/closing valve, ・Signaler/branch pipe, ・Sequencer, ・Valve body: Inner valve, Inlet port, 104B, 104C--Outlet port, 112...
...orifice, 113... recess. Patent applicant Mitsuishi Engineering Link Co., Ltd. (and 2 others) Agent Patent attorney Kiyoshi Kuwai Figure 5 Figure 6 Procedural amendment 5. Date of amendment order Vol. 1, Indication of the case, 1999 Patent Application No. 85599, 2, Name of the invention, Fluid transfer device and vehicle sieving valve 3, Person making the amendment, Relationship with the case, Patent applicant address, Port of Tokyo. Address: 6-12, Toranomon-ku, 1st Floor, Otsuki Apartment, 40-4 Kamiyama-cho, Shibuya-ku, Tokyo, ``Detailed Description of the Invention'' section of the specification subject to amendment and ``Figure 1'' of the drawings 7 , Contents of amendment (1) “Drain valve 7
The phrase "via train valve 74A" should be corrected to "via train valve 74A." (2) On page 12, lines 3-4, r80 is big receiver 5.
2 gas inlet (for example, air inlet)"
"80A is the gas inlet port of the big receiver 52,
B is corrected to ``gas inlet (for example, air inlet) of the dispensing liquid recovery branch pipe 84 from the vehicle sieving valve 71 via the on-off valve 74B''. (3) In the third line of page 13, the phrase "connected to the branch pipe 98" was replaced with "connected to the branch pipe 98 via the on-off valve 74B".
and correct it. (4) On page 13, line 5 of the same page, it says “from valve 74”.
Correct it to "from valve 74A." (5) In the same page 20, line 15, "71 and liquid B" is corrected to "71 and 74B and liquid B." (6) On page 21, lines 5 and 6, "reaching signaler 94" is corrected to "reaching signaler 95." (7) On page 21, line 20, "Signaler 95" is corrected to "Signaler 97." (8) On page 22, lines 3 to 7, it says, “Then, the big 54 that moved inside the transfer pipe 50 and passed through the big receiving valve 71.
passes through the signaler 72, the big receiver inlet valve 7
1 is quickly closed by the sequencer 101, and the branch pipe on-off valve 83C is fully opened. ”
``Then, after passing through the big 54 or the big signaller 97 that has moved inside the transfer pipe 50, when it reaches the big receiving valve 71, the big receiving valve 71
is quickly closed by the sequencer 101, and the branch pipe on-off valve 83C is fully opened. ”
and correct it. (9) In the first line of page 23, the words "river/rain valves 74 and" are amended to read "drain valves 74B, 49 and". (10) “Train by liquid type” on page 23, lines 1 and 2.
Correct the statement to "train of liquid type". (11) In the 3rd to 4th lines of page 23, the phrase ``activated and the B liquid remaining in the Vig receiver 52'' is corrected to ``activated and the branch pipe 98 for discharging the Vig front liquid''. (12) In lines 4 and 5 of page 23, the phrase "remains on the upstream side" is corrected to "remains in the upstream confluence pipe 84." (13) On page 23, line 9, the phrase "gas suction valve 80" is corrected to "gas suction valve 80B". (],'l) On page 23, lines 14 and 15, it says, "The train valves 74 are each fully closed, and this state is continued for a certain period of time to complete the collection of the residual liquid around the big receiver." [After each of the train valves 74B and 49 are fully opened, the train valve 74A for recovering liquid C, which is the Vig condensate remaining in the Vig receiver 52, and the train pump type discharge valve 86C are fully opened, and the I-rain is opened again. pump 79
After starting the gas intake valve 80A, the sequencer 10
1, and this state is continued for a certain period of time until the residual liquid in the system disappears, completing the collection of the residual liquid around the big receiver. ” he corrected. (15) On page 25, line 3, "r104c part is atmospheric pressure"
This is corrected to ``atmospheric pressure'' because the rl 04C part was treated with the liquid remaining in the receiver and removed the pig 54 in the previous operation. (16) On page 30, line 12 of the same page, the phrase "compressed gas as a power source" has been replaced with "compressed gas such as air as a power source."
and correct it. (17) As shown in the attached sheet, the symbols 74.80 in Figure 1 have been changed to 74A, 8 f-, ), respectively, and the symbols 7
Add 4B and 80B. 8. List of attached documents (1) Figure 1 of drawings 1IiU and above
Claims (2)
移動するビグにより、移送管内で複数種類の流動体を互
いに仕切って移送する流動体の移送装置において、 上記ビグを移送管内に供給するビグランチャと、移送管
から互いに並列に分岐されて流動体の種類に応じた移送
先にそれぞれ連通する複数の分岐管と、これらの分岐管
と移送管との分岐部にあって分岐管に設けられた開閉弁
と、これらの分岐部をビグが通過したことを検出するシ
グナラーと、先に移送されている流動体に対応した分岐
管の分岐部をビグが通過することにより当該分岐部の開
閉弁を閉止させるとともに、この流動体に続く流動体に
対応した分岐管の分岐部をビグが通過することにより当
該分岐部の開閉弁を開放させる制御手段と、移送管内か
らのビグを受け取るビグレシーバと、ビグレシーバに最
も近く配設された分岐管と移送管との分岐部に、ビグ前
の流動体を該分岐管に移送し、ビグをビグレシーバに切
り換え送給するビグレシービング弁を配設したことを特
徴とする流動体の移送装置。(1) In a fluid transfer device that separates and transfers multiple types of fluids within a transfer pipe by using a VIG that moves within the transfer pipe in close contact with the inner peripheral surface of the transfer pipe, the VIG is moved inside the transfer pipe. A big launcher to supply, a plurality of branch pipes that are branched in parallel from the transfer pipe and communicate with each transfer destination according to the type of fluid, and The on-off valve provided, the signaler that detects that the VIG has passed through these branch parts, and the VIG that passes through the branch part of the branch pipe corresponding to the fluid being transferred earlier, the signal of the branch part is detected. A control means that closes the on-off valve and opens the on-off valve of the branch pipe when the VIG passes through a branch part of the branch pipe corresponding to the fluid following the fluid, and a VIG receiver that receives the VIG from within the transfer pipe. In addition, a big receiving valve is installed at the branch point between the branch pipe and the transfer pipe that are arranged closest to the big receiver, to transfer the fluid before the big to the branch pipe, and switch the big to the big receiver and supply the fluid. A fluid transfer device characterized by:
移動するビグにより移送管内で複数種類の流動体を互い
に仕切って移送する流動体の移送装置において、上記移
送管と流動体の移送先への分岐管との分岐部に配設され
たビグレシービング弁であって、 移送管に連通された入口ポートと分岐管およびビグレシ
ーバにそれぞれ連通する2つの出口ポートとを少なくと
も有するバルブボディと、 このバルブボディ内に回動自在に支持され、入口ポート
と2つの出口ポートのいずれか一方とを連通するオリフ
ィスを有するインナバルブと、このオリフィスの開口端
に形成されて入口ポートから送入された上記ビグを受け
取り保持するとともに、保持したビグによってオリフィ
スを閉止する凹部と、を有することを特徴とするビグレ
シービング弁。(2) In a fluid transfer device in which multiple types of fluids are separated from each other and transferred within the transfer pipe by a vig that moves within the transfer pipe in close contact with the inner peripheral surface of the transfer pipe, the transfer pipe and the fluid A big receiving valve disposed at a branch point with a branch pipe to a transfer destination, the valve body having at least an inlet port communicating with the transfer pipe and two outlet ports communicating with the branch pipe and the big receiver, respectively. , an inner valve that is rotatably supported within the valve body and has an orifice that communicates between the inlet port and one of the two outlet ports; A big receiving valve characterized by having a recess that receives and holds the big and closes an orifice by the held big.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1085599A JP2865304B2 (en) | 1989-04-03 | 1989-04-03 | Fluid transfer device and piggle sieving valve |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1085599A JP2865304B2 (en) | 1989-04-03 | 1989-04-03 | Fluid transfer device and piggle sieving valve |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02266200A true JPH02266200A (en) | 1990-10-30 |
| JP2865304B2 JP2865304B2 (en) | 1999-03-08 |
Family
ID=13863288
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1085599A Expired - Lifetime JP2865304B2 (en) | 1989-04-03 | 1989-04-03 | Fluid transfer device and piggle sieving valve |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2865304B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08151123A (en) * | 1994-11-29 | 1996-06-11 | Yunipetsuku:Kk | Pig type payout method and payout line |
-
1989
- 1989-04-03 JP JP1085599A patent/JP2865304B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08151123A (en) * | 1994-11-29 | 1996-06-11 | Yunipetsuku:Kk | Pig type payout method and payout line |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2865304B2 (en) | 1999-03-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6944902B1 (en) | Pipe conduit vehicle | |
| CN107923577A (en) | Water piping system and its control method | |
| CA2555940A1 (en) | Water recovery systems and control valves | |
| CN110382088A (en) | The system and method for handling water by reverse osmosis or nanofiltration | |
| WO2007047688A3 (en) | Dispensing system and method for shower arm | |
| FR2625104A1 (en) | IRRIGATION SYSTEM FOR USE DURING ARTHROSCOPY | |
| RS61748B1 (en) | Controller for vacuum sewage system | |
| US5945611A (en) | Dual piston flow-through sampler | |
| EP1779937B1 (en) | Pigging system | |
| JP2865304B2 (en) | Fluid transfer device and piggle sieving valve | |
| JPS5952314B2 (en) | Automatic shutoff device in case of rupture of natural gas, etc. transportation pipes | |
| US4549574A (en) | Fluidic devices | |
| US20100219114A1 (en) | Arrangement for connection of a medical devide to a water line | |
| US7051760B1 (en) | Three-way inline piggable branch valve | |
| JP6881592B2 (en) | Degassing device | |
| US20040074030A1 (en) | Pellet / pig loading mechanism | |
| JP3680726B2 (en) | Ozone water production equipment | |
| US3218660A (en) | Ball valve for pigging system | |
| JPS6224680B2 (en) | ||
| JPH02221022A (en) | Transfer device for fluid | |
| KR970002277Y1 (en) | System for separation and transportation of different fluids through the same pipe line | |
| JPH0114480B2 (en) | ||
| JPS63153355A (en) | Automatic bath device | |
| JP4736339B2 (en) | Liquid feeding means and liquid feeding method | |
| CN112161146A (en) | Shared pigging connecting device and shared pipeline |