JPH0270366A - Accumulator filling pressure adjustment method for injection molding equipment - Google Patents

Accumulator filling pressure adjustment method for injection molding equipment

Info

Publication number
JPH0270366A
JPH0270366A JP22223688A JP22223688A JPH0270366A JP H0270366 A JPH0270366 A JP H0270366A JP 22223688 A JP22223688 A JP 22223688A JP 22223688 A JP22223688 A JP 22223688A JP H0270366 A JPH0270366 A JP H0270366A
Authority
JP
Japan
Prior art keywords
gas pressure
valve
bottle
pressure
accumulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22223688A
Other languages
Japanese (ja)
Inventor
Tatsuo Ishikawa
達夫 石川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ube Corp
Original Assignee
Ube Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ube Industries Ltd filed Critical Ube Industries Ltd
Priority to JP22223688A priority Critical patent/JPH0270366A/en
Publication of JPH0270366A publication Critical patent/JPH0270366A/en
Pending legal-status Critical Current

Links

Landscapes

  • Injection Moulding Of Plastics Or The Like (AREA)

Abstract

PURPOSE:To obtain an injection molding product having stable quality by leading gas pressure into a sub-bottle at the time of high gas pressure in a main bottle and working a piston accumulator at the time of low gas pressure to adjust it to the standard pressure. CONSTITUTION:The accumulator device is constituted with the main bottle 11 at upper end part of the piston accumulator 13 connecting with an injection cylinder 1 through a first shut-off valve 14 and the sub-bottle 12 through a second shut-off valve 15. Then, at the time of becoming high in the gas pressure in the main bottle 11, the second shut-off valve 15 is opened to lead the gas pressure into the sub-bottle 12. On the other hand, at the time of becoming low in the gas pressure in the main bottle 11, after lowering the piston 13a in the piston accumulator 13, it is lifted to adjust the gas pressure in the main bottle 11 to the standard pressure. By this method, the injection molding product having stable quality can be obtd.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明はダイカストマシン等の射出成形装置のアキュム
レータ充填圧調整方法に係り、詳しくは外気の温度が変
化してアキュムレータのボトル内のガス圧が変化しても
それを容易に所定の標準ガス圧に調整し変えることがで
き、所定の射出速度で射出シリンダを作動させることが
できるようにした射出成形装置のアキュムレータ充填圧
調整方法に関するものである。
[Detailed Description of the Invention] [Field of Industrial Application] The present invention relates to a method for adjusting the filling pressure of an accumulator in an injection molding device such as a die-casting machine. This invention relates to an accumulator filling pressure adjustment method for an injection molding device that allows the gas pressure to be easily adjusted to a predetermined standard gas pressure even if the gas pressure changes, and to operate an injection cylinder at a predetermined injection speed. .

〔従来の技術〕[Conventional technology]

従来からよく知られているように、射出成形装置として
のダイカストマシンの射出回路は、例えば射出シリンダ
と油圧源である油圧ポンプとの間の回路に下端を接続さ
れたピストンアキュムレータと、このピストンアキュム
レータの上端と配管により接続されたガスアキュムレー
タとしてのメインボトルから構成され、油圧ポンプの作
動によりピストンアキュムレータのピストンを上昇させ
てメインボトル内の窒素ガス等のガスを一定に圧縮させ
て一定の高圧の油圧とし、射出時にこれを射出シリンダ
に一気に供給することにより、高圧高速で射出シリンダ
を作動させてプランジャーによって溶湯を金型キャビテ
ィへ射出して成形品を得るものである。この射出時の射
出圧力は常に一定に保って射出することにより品質の安
定した成形品が得られるものである。
As is well known in the past, the injection circuit of a die casting machine as an injection molding device includes, for example, a piston accumulator whose lower end is connected to a circuit between an injection cylinder and a hydraulic pump that is a hydraulic pressure source, and this piston accumulator. It consists of a main bottle as a gas accumulator connected to the upper end by piping, and a hydraulic pump is operated to raise the piston of the piston accumulator and compress the nitrogen gas or other gas in the main bottle to a constant high pressure. By supplying hydraulic pressure to the injection cylinder all at once during injection, the injection cylinder is operated at high pressure and high speed, and a plunger injects the molten metal into the mold cavity to obtain a molded product. By always keeping the injection pressure constant during injection, a molded product with stable quality can be obtained.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

しかしながら、従来では、射出時に射出圧力を常に一定
に保って射出するにはつぎのような難点があった。
However, conventionally, there have been the following difficulties in maintaining the injection pressure constant during injection.

即ち、前記射出回路のアキュムレータのボトル内には、
成形条件に適合させた一定の高圧で窒素ガスが充填され
ており、射出時にはこの一定のガス圧でピストンアキュ
ムレータのピストンを下降させて高圧油を射出シリンダ
へ供給し、射出シリンダを一定の射出速度で作動させて
成形させるのであるが、外気の温度変化によって、この
アキュムレータのボトル内のガス充填圧が変化し、射出
速度が変化し、成形品の品質を一定の保つことができな
いという問題があった。
That is, in the bottle of the accumulator of the injection circuit,
Nitrogen gas is filled at a constant high pressure that matches the molding conditions, and during injection, this constant gas pressure lowers the piston of the piston accumulator to supply high-pressure oil to the injection cylinder, which maintains the injection cylinder at a constant injection speed. However, due to changes in the outside air temperature, the gas filling pressure inside the accumulator bottle changes, which changes the injection speed, making it impossible to maintain a constant quality of the molded product. Ta.

例えば、春から夏へ、或いは冬から春へと季節の変化に
伴う外気温度の上昇、または、この逆に夏から秋へ、或
いは秋から冬へと季節が変化することに伴う外気温度の
下降、さらに−日の外気温度の変化などによってアキュ
ムレータのボトル内のガス充填圧が変化する。
For example, an increase in outside air temperature as the seasons change from spring to summer or from winter to spring, or conversely, a decrease in outside air temperature as the seasons change from summer to autumn or from autumn to winter. Furthermore, the gas filling pressure in the accumulator bottle changes due to changes in the outside temperature.

なお、運転時には、射出回路中の作動油の温度も上昇す
るが、作動油は油冷却器により冷却されてほぼ一定に保
たれるので油温による窒素ガスの充填圧の変化はほとん
ど関係しない。
Note that during operation, the temperature of the hydraulic oil in the injection circuit also rises, but since the hydraulic oil is cooled by the oil cooler and kept almost constant, changes in the filling pressure of nitrogen gas due to oil temperature have little effect.

本発明はこのような問題点に鑑みてなされたものであり
、外気温度の変化によってアキュムレータのボトル内の
ガス充填圧が変化した場合に、それを容易に所定の標準
ガス圧に調整し変えることができる射出成形装置のアキ
ュムレータ充填圧調整方法を提供することを目的として
いる。
The present invention has been made in view of these problems, and it is an object of the present invention to easily adjust and change the gas filling pressure in the accumulator bottle to a predetermined standard gas pressure when the gas filling pressure in the accumulator bottle changes due to a change in outside air temperature. It is an object of the present invention to provide a method for adjusting accumulator filling pressure of an injection molding apparatus.

〔課題を解決するための手段〕[Means to solve the problem]

上記目的を達成するために、本発明は、下端部を射出シ
リンダに連結し、かつ、常時は閉じている第3の開閉弁
を介してタンクに連結したピストンアキュムレータの上
端部に、ガスを充填したメインボトルを常時は開いてい
る第1の開閉弁を介して連結し、かつ、ガスを充填した
サブボトルを常時は閉じている第2の開閉弁を介して連
結したアキュムレータ装置を用い、 外気が所定の標準気温のとき、サブボトル内のガス圧が
メインボトル内のガス圧よりも低くなるように調整して
おき、 外気が所定の標準気温よりも高くなって、メインボトル
内のガス圧が所定の標準ガス圧よりも高くなったときは
、第2の開閉弁を開いてメインボトル内のガス圧をサブ
ボトル内へ抜き、メインボトル内のガス圧が所定の標準
圧力になったとき、第2の開閉弁を閉じ、 逆に、外気が所定の標準気温よりも低くなって、メイン
ボトル内のガス圧が所定の標準ガス圧よりも低くなった
ときには、第1の開閉弁を閉じ、第2の開閉弁と第3の
開閉弁を開いてピストンアキュムレータ内のピストンを
下降させ、次に第3の開閉弁と第2の開閉弁を閉じ、第
1の開閉弁を開いて、ピストンアキュムレータ内のピス
トンを上昇させてメインボトル内のガス圧を所定の標準
圧力に調整する、 ようにしたものである。
In order to achieve the above object, the present invention fills gas into the upper end of a piston accumulator whose lower end is connected to an injection cylinder and connected to a tank via a normally closed third on-off valve. Using an accumulator device, the main bottle filled with gas is connected via a first on-off valve that is always open, and the sub-bottle filled with gas is connected via a second on-off valve that is normally closed. The gas pressure in the sub-bottle is adjusted so that it is lower than the gas pressure in the main bottle when the temperature is at a specified standard temperature, and when the outside air becomes higher than the specified standard temperature, the gas pressure in the main bottle is adjusted to the specified level. When the gas pressure in the main bottle reaches a predetermined standard pressure, the second on-off valve is opened to release the gas pressure in the main bottle into the sub-bottle. Conversely, when the outside air temperature is lower than a predetermined standard temperature and the gas pressure in the main bottle is lower than the predetermined standard gas pressure, the first on-off valve is closed and the second on-off valve is closed. Open the on-off valve and the third on-off valve to lower the piston in the piston accumulator, then close the third on-off valve and the second on-off valve, open the first on-off valve, and lower the piston in the piston accumulator. The piston is raised to adjust the gas pressure inside the main bottle to a predetermined standard pressure.

〔作 用] 外気が所定の標準気温よりも高くなり、メインボトル内
のガス圧が所定の標準ガス圧よりも高くなったときに、
第2の開閉弁が開けられて、メインボトル内の高(なっ
たガス圧。がサブボトル内へ抜かれ、メインボトル内の
ガス圧が所定の標準ガス圧になると前記第2の開閉弁が
閉じられる。
[Function] When the outside air temperature becomes higher than the predetermined standard temperature and the gas pressure inside the main bottle becomes higher than the predetermined standard gas pressure,
The second on-off valve is opened, and the high gas pressure in the main bottle is released into the sub-bottle, and when the gas pressure in the main bottle reaches a predetermined standard gas pressure, the second on-off valve is closed. .

逆に、外気が所定の標準気温よりも低くなり、メインボ
、トル内のガス圧が所定の標準ガス圧よりも低くなった
ときに、第1の開閉弁が閉じられ、第2の開閉弁と第3
の開閉弁が開けられてピストンアキュムレータ内のピス
トンが下降され、次に第2の開閉弁と第3の開閉弁が閉
じられ、第1の開閉弁が開けられてピストンアキュムレ
ータ内のピストンが上昇されて、メインボトル内のガス
圧が所定の標準圧力に調整される。
Conversely, when the outside air becomes lower than the predetermined standard temperature and the gas pressure inside the main bottle becomes lower than the predetermined standard gas pressure, the first on-off valve is closed and the second on-off valve is closed. Third
The on-off valve is opened and the piston in the piston accumulator is lowered, then the second on-off valve and the third on-off valve are closed, and the first on-off valve is opened and the piston in the piston accumulator is raised. Then, the gas pressure in the main bottle is adjusted to a predetermined standard pressure.

このようにして、外気温度の変化に対応させてメインボ
トル内のガス圧が所定の標準圧力に調整される。
In this way, the gas pressure within the main bottle is adjusted to a predetermined standard pressure in response to changes in outside air temperature.

〔実施例〕〔Example〕

以下、図面を参照して実施例を説明する。 Examples will be described below with reference to the drawings.

第1図および第2図はそれぞれ本発明の実施例に係る射
出成形装置のアキュムレータ充填圧調整方法を説明する
ための射出成形装置の射出回路図およびフローチャート
である。
FIG. 1 and FIG. 2 are an injection circuit diagram and a flowchart of an injection molding apparatus for explaining an accumulator filling pressure adjustment method of an injection molding apparatus according to an embodiment of the present invention, respectively.

第1図において、射出シリンダ1には射出シリンダl側
から順次、配管9を介して電磁切替弁2、射出用の開閉
弁を兼ねる流量調整弁3、逆止弁7、電磁切替弁5、逆
止弁8、油圧ポンプ19が接続されている。符号4はタ
ンク、6は回路圧設定用のリリーフ弁である。そして、
流11整弁3と逆止弁7の間の配管9にはピストンアキ
ュムレータ13の下端部が配管10によって連結され、
この配管10とタンク4を結ぶ配管には第3の開閉弁1
6が介装されている。ピストンアキュムレータ13の上
端部とアキュムレータのメインボトル11との間は第1
の開閉弁14を取付けた配管17によって接続され、さ
らに第1の開閉弁14とピストンアキュムレータ13の
間の配管17には第2の開閉弁15を取付けた配管18
によってサブボトル12が連結されている。なお、ピス
トンアキュムレータ13にはピストン13aが上下動自
在に内挿されている。また、サブボトル12の容積はメ
インボトル11の容積よりも小さいものでよい。
In Fig. 1, an injection cylinder 1 is connected to an electromagnetic switching valve 2 via a pipe 9, a flow rate adjustment valve 3 which also serves as an on-off valve for injection, a check valve 7, an electromagnetic switching valve 5, a reverse A stop valve 8 and a hydraulic pump 19 are connected. Reference numeral 4 is a tank, and 6 is a relief valve for setting circuit pressure. and,
A lower end of a piston accumulator 13 is connected to a piping 9 between the flow regulating valve 3 and the check valve 7 by a piping 10.
A third on-off valve 1 is installed in the pipe connecting this pipe 10 and the tank 4.
6 is interposed. Between the upper end of the piston accumulator 13 and the main bottle 11 of the accumulator is the first
The piping 17 between the first on-off valve 14 and the piston accumulator 13 has a second on-off valve 15 attached thereto.
The sub-bottles 12 are connected by. Note that a piston 13a is inserted into the piston accumulator 13 so as to be vertically movable. Further, the volume of the sub-bottle 12 may be smaller than the volume of the main bottle 11.

二のように構成された射出回路のアキュムレータ装置を
用いたアキュムレータ充填圧調整方法を第2図と併用し
て説明する。
A method for adjusting the accumulator filling pressure using the accumulator device of the injection circuit configured as shown in FIG. 2 will be explained in conjunction with FIG.

まず、例えば外気が20 ’Cの時を標準気温とし、こ
の標準気温の時のメインボトル11内のガス充填圧を例
えば135 kg/ c+11に設定して、これを標準
ガス圧とし、また、サブボトル12内のガス圧を前記メ
インボトル11の標準ガス圧よりも小さい圧力の例えば
110 kg/c+flに調整しておく。
First, for example, when the outside air is 20'C, the standard temperature is set, and the gas filling pressure in the main bottle 11 at this standard temperature is set to, for example, 135 kg/c+11, which is set as the standard gas pressure. The gas pressure in the main bottle 12 is adjusted to a pressure lower than the standard gas pressure of the main bottle 11, for example, 110 kg/c+fl.

なお、この時、第1図における第2の開閉弁15と第3
の開閉弁16は閉められており、第1の開閉弁14は開
けられている。また、ピストンアキュムレータ13には
油圧ポンプ19から配管9.10を介して油圧がかけら
れて、そのピストン13aが上昇限にあり、この時、メ
インボトル11のガス圧は前記135 kg/aftの
標準ガス圧とされている。
In addition, at this time, the second on-off valve 15 and the third on-off valve in FIG.
The on-off valve 16 is closed, and the first on-off valve 14 is opened. Further, hydraulic pressure is applied to the piston accumulator 13 from the hydraulic pump 19 via the piping 9.10, and the piston 13a is at the upper limit, and at this time, the gas pressure in the main bottle 11 is equal to the standard value of 135 kg/aft. It is considered to be gas pressure.

この状態でアキュムレータ装置を備えた射出回路の運転
が開始され、電磁切換弁2を図示の状態から切換えて流
量調整弁3を開くとメインボトル11の圧縮ガスの作用
によって、ピストンアキュムレータ13のピストン13
aが下降し、135kg / crMの高圧油が射出シ
リンダlのヘッドエンド側へ作用し射出シリンダ1が高
速で前進して図示していないプランジャにより溶湯を金
型キャビティへ射出する。この作動を繰り返し行って多
数の成形品を得る。
In this state, the operation of the injection circuit equipped with the accumulator device is started, and when the electromagnetic switching valve 2 is switched from the state shown and the flow rate adjustment valve 3 is opened, the piston 1 of the piston accumulator 13 is
A is lowered, high-pressure oil of 135 kg/crM acts on the head end side of the injection cylinder 1, and the injection cylinder 1 moves forward at high speed to inject the molten metal into the mold cavity by a plunger (not shown). This operation is repeated to obtain a large number of molded products.

そして、運転を続行していくうちに、外気の温度が標準
気温20°Cから変わると、第2図に示したような操作
が行われる。
As the operation continues, if the temperature of the outside air changes from the standard temperature of 20°C, the operation shown in FIG. 2 is performed.

即ち、まず、気温比較部30においては、ステップ31
によって温度設定器などに標準気温20°Cが設定され
ており、この設定値はステップ32で電気量へ変換され
て、さらにステップ35の比較部へ入力される。一方、
ステップ33では接点付温度計などで外気温度が測定さ
れ、この測定値はステップ34で電気量に変換されてス
テップ35の比較部へ送られる。このステップ35の比
較により、外気の温度が例えば40゛Cとなり、標準気
温の20°Cよりも高(なった時には、ステップ40の
メインボトルガス圧減圧操作部でメインボトル11のガ
ス圧が標準ガス圧に調整される。即ち、この場合には、
メインボトル11のガス圧は当初に設定された標準ガス
圧135 kg/c[を上回って例えば144 kg/
c+flに上昇しており、また、サブボトル12内のガ
ス圧は当初の設定圧110kg / ciを上回って例
えば117 kg/c+11に上昇している。なお、こ
の外気温度が変化した時のメインボトル11のガス圧P
、およびサブボトル12のガス圧P2は、標準気温をも
。、外気温度をし、メインボトル11とサブボトルI2
の当初のガス圧をそれぞれPol、PO2とすれば、次
式で表される。
That is, first, in the temperature comparison section 30, step 31
A standard temperature of 20° C. is set on a temperature setting device, etc., and this set value is converted into an amount of electricity in step 32 and further inputted to the comparison section in step 35. on the other hand,
In step 33, the outside air temperature is measured using a thermometer with a contact point, etc., and this measured value is converted into an amount of electricity in step 34 and sent to the comparison section in step 35. As a result of the comparison in step 35, the temperature of the outside air becomes, for example, 40°C, which is higher than the standard temperature of 20°C. adjusted to the gas pressure, i.e. in this case:
The gas pressure in the main bottle 11 exceeds the initially set standard gas pressure of 135 kg/c [for example, 144 kg/c].
c+fl, and the gas pressure in the sub-bottle 12 has risen to, for example, 117 kg/c+11, exceeding the initial set pressure of 110 kg/ci. In addition, the gas pressure P of the main bottle 11 when this outside temperature changes
, and the gas pressure P2 of the sub-bottle 12 is also the standard temperature. , outside temperature, main bottle 11 and sub-bottle I2
If the initial gas pressures of are Pol and PO2, respectively, it is expressed by the following equation.

PI(PZ)=PO1(P(12) X ((273+
t)/(273+t fi)) −−−−−−・−・・
 ■そこでまず、そのステップ41で油圧ポンプ19か
らピストンアキュムレータ13へ油圧を供給してビスロ
ン13aを上昇させ、ステップ42でピストン13aは
上昇限となり、ステップ43で常時は閉じられている第
2の開閉弁15を開(。
PI(PZ)=PO1(P(12)
t)/(273+t fi)) −−−−−−・−・・
- First, in step 41, hydraulic pressure is supplied from the hydraulic pump 19 to the piston accumulator 13 to raise the Vislon 13a, and in step 42, the piston 13a reaches its upper limit, and in step 43, the second opening/closing, which is normally closed, is Open valve 15 (.

なお、第1の開閉弁14は常時開いている。このステッ
プ43によってメインボトル11の圧力がサブボトル1
2へ抜かれて、メインボトル11とサブボトル12のガ
ス圧が標準ガス圧の135kg/cmlになった時点で
第2の開閉弁15を閉じる。
Note that the first on-off valve 14 is always open. By this step 43, the pressure of the main bottle 11 is increased to the sub-bottle 1.
2, and the second on-off valve 15 is closed when the gas pressure in the main bottle 11 and sub-bottle 12 reaches the standard gas pressure of 135 kg/cml.

なお、このときの圧力P3は、メインボトル11の容積
をVl、サブボトル12の容積をV2とし、配管容積を
無視すれば次式によって確認できる。
Note that the pressure P3 at this time can be confirmed by the following equation, assuming that the volume of the main bottle 11 is Vl, the volume of the sub-bottle 12 is V2, and ignoring the piping volume.

P:+ = ((P+ xv+)+(Pi XVz))
/(L +Vz)  ・−・−・−■ この135 kg/ctAの圧力になったことをステッ
プ44で確認する。この確認は別に設けられたメインボ
トル内ガス圧比較部100によって行われる。
P:+ = ((P+ xv+)+(Pi XVz))
/(L +Vz) ・−・−・−■ It is confirmed in step 44 that the pressure has reached this 135 kg/ctA. This confirmation is performed by a separately provided main bottle gas pressure comparison section 100.

このメインボトル内ガス圧比較部100では、ステップ
101で例えば圧力設定器によりメインボトル11内の
標準ガス圧135 kg/CI6を設定する。
In this main bottle gas pressure comparing section 100, in step 101, a standard gas pressure in the main bottle 11 of 135 kg/CI6 is set using, for example, a pressure setting device.

そして、これをステップ102で電気量に変換してステ
ップ103へ送る。一方、ステップ104では圧力計な
どでメインボトルll内のガス圧が測定され、これがス
テップ105で電気量に変換されてさらに前記ステップ
103で前記標準ガス圧と比較する。ステップ104に
おけるメインボトル11内のガス圧測定値は前記ステッ
プ43の動作によってメインボトル11内のガス圧が抜
かれて下降しているときもたえず測定を続行しており、
最終的にメインボトル11内のガス圧が標準ガス圧に一
致した時に前記ステップ44の確認が行われる。そして
、このステップ44の確認が行われると、ステップ45
で第2の開閉弁15が閉じられて、射出準備完了(ステ
ップ46)となる。
This is then converted into an electrical quantity in step 102 and sent to step 103. On the other hand, in step 104, the gas pressure in the main bottle 11 is measured with a pressure gauge, and in step 105 this is converted into an amount of electricity, which is further compared with the standard gas pressure in step 103. The gas pressure measurement value in the main bottle 11 in step 104 continues to be measured even when the gas pressure in the main bottle 11 is released and falling due to the operation in step 43,
When the gas pressure in the main bottle 11 finally matches the standard gas pressure, the confirmation in step 44 is performed. When the confirmation in step 44 is performed, step 45
The second on-off valve 15 is closed, and preparation for injection is completed (step 46).

そして、以後、アキュムレータのメインボトルll内の
ガスは標準ガス圧135 kg/C11lに保たれて運
転される。
From then on, the gas in the main bottle 11 of the accumulator is maintained at a standard gas pressure of 135 kg/C11 l during operation.

つぎに、前記の状態から外気温度が標準温度20°Cよ
り低くなり、例えば、外気温度が5°Cとなったような
場合には、これが気温比較部30で判断されて、そのス
テップ35の比較部からの信号がステップ50のメイン
ボトルガス圧増圧操作部に送られて、ここでメインボト
ル11のガス圧が標準ガス圧に調整される。なお、この
場合には、例えば外気温度が5°Cになるとメインボト
ル11のガス圧は前記の操作で調整されていた135k
g/crMから例えば128kg/Cll1に低下して
おり、またサブボトル12のガス圧も前記の操作におけ
る圧力135kg/cIIIから低下して例えば128
kg/CI!Iとなっており(なお、この場合も前記算
式■と同様である。)、メインボトル11のガス圧を標
準ガス圧の135kg/dに調整し変える必要がある。
Next, when the outside air temperature becomes lower than the standard temperature of 20°C from the above state, for example, when the outside air temperature becomes 5°C, this is determined by the air temperature comparison section 30, and step 35 is performed. The signal from the comparison section is sent to the main bottle gas pressure increase operation section in step 50, where the gas pressure in the main bottle 11 is adjusted to the standard gas pressure. In this case, for example, when the outside temperature reaches 5°C, the gas pressure in the main bottle 11 increases to 135k, which was adjusted in the above operation.
g/crM has decreased to, for example, 128 kg/Cll1, and the gas pressure in the sub-bottle 12 has also decreased from the pressure of 135 kg/cIII in the above operation to, for example, 128 kg/crM.
kg/CI! I (this case is also the same as the formula (2) above), and it is necessary to adjust and change the gas pressure in the main bottle 11 to the standard gas pressure of 135 kg/d.

そこで、まず、ステップ35からの信号を受けてステッ
プ51で第1の開閉弁14を閉じ、第2の開閉弁15を
開く。次にステップ52で第3の開閉弁16を開き、ピ
ストンアキュムレータ13内の油圧をタンク4へ抜き、
そのピストン13aを下降させる。このステップ52ま
での操作により、ピストン13aが下降している状態で
のピストンアキュムレータ13内とサブボトル12内の
ガス圧は共に例えば103kg/Cl1lまで低下する
Therefore, first, upon receiving the signal from step 35, the first on-off valve 14 is closed in step 51, and the second on-off valve 15 is opened. Next, in step 52, the third on-off valve 16 is opened, and the hydraulic pressure in the piston accumulator 13 is released to the tank 4.
The piston 13a is lowered. Through the operations up to step 52, the gas pressures in the piston accumulator 13 and the sub-bottle 12 both decrease to, for example, 103 kg/Cl11 while the piston 13a is descending.

なお、この時の圧力P、は、操作前のピストンアキュム
レータ13とサブボトル12のガス圧をP 4(” 1
28 kg / cボ)、ピストンアキュムレータ13
の容積を■3とし、配管の容積を無視すれば、次式で表
せられる。
In addition, the pressure P at this time is the gas pressure of the piston accumulator 13 and the sub-bottle 12 before operation P4(" 1
28 kg/cbo), piston accumulator 13
If the volume of is 3 and the volume of the piping is ignored, it can be expressed by the following formula.

Ps = (P4 XV2)/(V2 +V3)’−’
−−−−0次に、この状態でステップ53で第3開閉弁
16と第2開閉弁15を閉じ、ステップ54で第1開閉
弁14を開く。そして、ステップ55で油圧ポンプ19
からピストンアキュムレータ13へ油圧を供給してその
ピストン13aを上昇させると、メインボトル11内の
ガス圧は昇圧し標準ガス圧135kg/C11lに至る
。なお、このときの値P6は次式からも確認できる。
Ps = (P4 XV2)/(V2 +V3)'-'
----0 Next, in this state, the third on-off valve 16 and the second on-off valve 15 are closed in step 53, and the first on-off valve 14 is opened in step 54. Then, in step 55, the hydraulic pump 19
When hydraulic pressure is supplied to the piston accumulator 13 to raise the piston 13a, the gas pressure inside the main bottle 11 increases to reach the standard gas pressure of 135 kg/C11l. Note that the value P6 at this time can also be confirmed from the following equation.

P6 = ((P4 XVI)+、(Ps XV:l)
)/ V+・−・−■ この標準ガス圧135 kg/crflに至った確認を
前記メインボトル内ガス圧比較部100のステップ10
3の比較値を受けてステップ56で行う。この状態でス
テップ57で射出準備完了となり、以後、運転が再開さ
れる。なお、このステップ51から55の昇圧動作は、
例えばサブボトル12の初期設定圧力の大小や、サブボ
トル12の容積、ピストンアキュムレータ13の容積等
によって一回に限らず、複数回繰り返して行うこともあ
る。
P6 = ((P4 XVI)+, (Ps XV:l)
)/V+・−・−■ Confirmation that this standard gas pressure has reached 135 kg/crfl is performed in step 10 of the main bottle gas pressure comparison section 100.
Step 56 is performed in response to the comparison value of 3. In this state, injection preparation is completed in step 57, and operation is resumed thereafter. Note that the boosting operations in steps 51 to 55 are as follows:
For example, depending on the initial setting pressure of the sub-bottle 12, the volume of the sub-bottle 12, the volume of the piston accumulator 13, etc., the process is not limited to once, but may be repeated multiple times.

以上説明したアキュムレータの充填圧調整は、前記第1
.2.3の開閉弁14.15.16を電磁開閉弁として
おく等することによって、全て自動制御で行うことがで
きる。
The filling pressure adjustment of the accumulator explained above is performed by the first
.. By using the on-off valves 14, 15, and 16 of 2.3 as electromagnetic on-off valves, all operations can be performed automatically.

なお、以上説明した第2図のフローチャートにおいて、
気温比較部300代わりに、ここをメインボトル内ガス
圧比較部とし、ステップ31を「メインボトル内の標準
ガス圧設定」とし、ステップ33を[メインボトル内の
ガス圧測定」として、メインボトル11内のガス圧が標
準ガス圧であるかどうかを比較するようにして、メイン
ボトル11内のガス圧が標準ガス圧135 kg/c+
flよりも大きくなった場合は、メインボトルガス圧減
圧ステップ40の操作を行い、逆に、メインボトル11
内のガス圧が標準ガス圧135kg/c+flよりも小
さくなった場合は、メインボトルガス圧増圧ステップ5
0の操作を行い、アキュムレータ11の充填圧調整をす
るようにしてもよい。
In addition, in the flowchart of FIG. 2 explained above,
Instead of the temperature comparison section 300, this is set as the main bottle gas pressure comparison section, step 31 is set as "standard gas pressure setting in main bottle", step 33 is set as "gas pressure measurement in main bottle", and the main bottle 11 is set as "standard gas pressure setting in main bottle". The gas pressure inside the main bottle 11 is the standard gas pressure of 135 kg/c+.
If it becomes larger than fl, perform the main bottle gas pressure reduction step 40, and conversely, the main bottle 11
If the gas pressure in the bottle becomes lower than the standard gas pressure of 135kg/c+fl, step 5 to increase the main bottle gas pressure.
0 operation may be performed to adjust the filling pressure of the accumulator 11.

また、第2図におけるメインボトルガス圧増圧ステップ
50におけるステップ51〜53の代わりに、第3図に
示すように「第1開閉弁14を閉じる」 (ステップ5
1a)、「第3開閉弁16を開き、ピストンアキュムレ
ータ13内の油圧をタンク4に抜き、ピストン13aを
下降させる」(ステップ52a)、「第2開閉弁15を
開く」(ステップ53a)、[ピストンアキュムレータ
13内のガス圧が所定の圧力PAkg/cniになった
とき第2開閉弁15を閉じる」 (ステップ54a)、
とすることもできる。
Also, instead of steps 51 to 53 in the main bottle gas pressure increasing step 50 in FIG. 2, "the first on-off valve 14 is closed" (step 5) as shown in FIG.
1a), "Open the third on-off valve 16, drain the hydraulic pressure in the piston accumulator 13 to the tank 4, and lower the piston 13a" (step 52a), "Open the second on-off valve 15" (step 53a), [ "When the gas pressure in the piston accumulator 13 reaches a predetermined pressure PA kg/cni, close the second on-off valve 15" (step 54a),
It is also possible to do this.

なお、この第3図におけるステップ54aを、「サブボ
トル12内のガス圧が所定の圧力Pbkg/ cffl
になったとき第2開閉弁15を閉じる」ようにしてもよ
い。
Note that step 54a in FIG.
The second on-off valve 15 may be closed when the

〔発明の効果] 以上詳述したように、本発明は特許請求の範囲に記載し
たような構成にしたので、外気温度の変化に対応させて
アキュムレータのメインボトル内のガス圧を容易に所定
の標準ガス圧力に調整し変えることができるので、常に
一定の射出圧力、射出速度で射出成形装置を運転するこ
とができ、品質の安定した成形品を得ることができる。
[Effects of the Invention] As described in detail above, the present invention has the configuration as described in the claims, so that the gas pressure in the main bottle of the accumulator can be easily adjusted to a predetermined level in response to changes in outside temperature. Since the gas pressure can be adjusted and changed to the standard gas pressure, the injection molding apparatus can always be operated at a constant injection pressure and injection speed, and molded products with stable quality can be obtained.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図および第2図はそれぞれ本発明の実施例に係る射
出成形装置のアキュムレータ充填圧調整方法を説明する
だめの射出成形装置の射出回路図およびフローチャート
、第3図は本発明の他の実施例を示すフローチャートで
ある。 1・・・射出シリンダ、2.5・・・電磁切替弁、4・
・・タンク、11・・・メインボトル、12・・・サブ
ボトル、13・・・ピストンアキュムレータ、13a・
・ ・ピストン、14・・・第1の開閉弁、15・・・
第2の開閉弁、16・・・第3の開閉弁、19・・・ポ
ンプ、30・・・気温比較部、40・・・メインボトル
ガス圧減圧操作部、50・・・メインボトルガス圧増圧
操作部、100・・・メインボトル内ガス圧比較部。 特許出願人  宇部興産株式会社
FIGS. 1 and 2 are an injection circuit diagram and a flowchart of an injection molding apparatus for explaining an accumulator filling pressure adjustment method of an injection molding apparatus according to an embodiment of the present invention, respectively, and FIG. 3 is a flowchart of an injection molding apparatus according to another embodiment of the present invention. 3 is a flowchart showing an example. 1... Injection cylinder, 2.5... Solenoid switching valve, 4...
...Tank, 11...Main bottle, 12...Sub bottle, 13...Piston accumulator, 13a...
・・Piston, 14...first on-off valve, 15...
Second on-off valve, 16... Third on-off valve, 19... Pump, 30... Temperature comparison section, 40... Main bottle gas pressure reduction operation section, 50... Main bottle gas pressure Pressure increase operation section, 100... Main bottle internal gas pressure comparison section. Patent applicant: Ube Industries, Ltd.

Claims (1)

【特許請求の範囲】 下端部を射出シリンダに連結し、かつ、常時は閉じてい
る第3の開閉弁を介してタンクに連結したピストンアキ
ュムレータの上端部に、ガスを充填したメインボトルを
常時は開いている第1の開閉弁を介して連結し、かつ、
ガスを充填したサブボトルを常時は閉じている第2の開
閉弁を介して連結したアキュムレータ装置を用い、 外気が所定の標準気温のとき、サブボトル内のガス圧が
メインボトル内のガス圧よりも低くなるように調整して
おき、 外気が所定の標準気温よりも高くなって、メインボトル
内のガス圧が所定の標準ガス圧よりも高くなったときは
、第2の開閉弁を開いてメインボトル内のガス圧をサブ
ボトル内へ抜き、メインボトル内のガス圧が所定の標準
圧力になったとき、第2の開閉弁を閉じ、 逆に、外気が所定の標準気温よりも低くなって、メイン
ボトル内のガス圧が所定の標準ガス圧よりも低くなった
ときには、第1の開閉弁を閉じ、第2の開閉弁と第3の
開閉弁を開いてピストンアキュムレータ内のピストンを
下降させ、次に第3の開閉弁と第2の開閉弁を閉じ、第
1の開閉弁を開いて、ピストンアキュムレータ内のピス
トンを上昇させてメインボトル内のガス圧を所定の標準
圧力に調整するようにした射出成形装置のアキュムレー
タ充填圧調整方法。
[Claims] A main bottle filled with gas is connected to an upper end of a piston accumulator whose lower end is connected to an injection cylinder and which is connected to a tank via a normally closed third on-off valve. connected via an open first on-off valve, and
Using an accumulator device that connects a sub-bottle filled with gas via a second on-off valve that is normally closed, when the outside air is at a predetermined standard temperature, the gas pressure in the sub-bottle is lower than the gas pressure in the main bottle. When the outside air temperature becomes higher than the specified standard temperature and the gas pressure inside the main bottle becomes higher than the specified standard gas pressure, open the second on-off valve and open the main bottle. The gas pressure inside the bottle is released into the sub-bottle, and when the gas pressure inside the main bottle reaches the specified standard pressure, the second on-off valve is closed. When the gas pressure in the bottle becomes lower than a predetermined standard gas pressure, the first on-off valve is closed, the second on-off valve and the third on-off valve are opened to lower the piston in the piston accumulator, and then The third on-off valve and the second on-off valve were closed, and the first on-off valve was opened to raise the piston in the piston accumulator and adjust the gas pressure in the main bottle to a predetermined standard pressure. Accumulator filling pressure adjustment method for injection molding equipment.
JP22223688A 1988-09-07 1988-09-07 Accumulator filling pressure adjustment method for injection molding equipment Pending JPH0270366A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22223688A JPH0270366A (en) 1988-09-07 1988-09-07 Accumulator filling pressure adjustment method for injection molding equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22223688A JPH0270366A (en) 1988-09-07 1988-09-07 Accumulator filling pressure adjustment method for injection molding equipment

Publications (1)

Publication Number Publication Date
JPH0270366A true JPH0270366A (en) 1990-03-09

Family

ID=16779244

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22223688A Pending JPH0270366A (en) 1988-09-07 1988-09-07 Accumulator filling pressure adjustment method for injection molding equipment

Country Status (1)

Country Link
JP (1) JPH0270366A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010201436A (en) * 2009-02-27 2010-09-16 Ube Machinery Corporation Ltd Die casting machine and die casting method
JP2010240707A (en) * 2009-04-08 2010-10-28 Toshiba Mach Co Ltd Hydraulic device and injection device
JP2022187058A (en) * 2021-06-07 2022-12-19 Ubeマシナリー株式会社 Die casting machine and die casting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010201436A (en) * 2009-02-27 2010-09-16 Ube Machinery Corporation Ltd Die casting machine and die casting method
JP2010240707A (en) * 2009-04-08 2010-10-28 Toshiba Mach Co Ltd Hydraulic device and injection device
JP2022187058A (en) * 2021-06-07 2022-12-19 Ubeマシナリー株式会社 Die casting machine and die casting method

Similar Documents

Publication Publication Date Title
US4860820A (en) Method and apparatus for the low-pressure die-casting of metals
CN114101621B (en) Pressurizing closed-loop control system of die casting machine
JPS5835460B2 (en) transfer molding machine
US6048476A (en) Clamp pressure optimization system and method
US20080164002A1 (en) Die casting machine with reduced static injection pressure
US6499530B2 (en) Apparatus and method of forming battery parts
JPH05253662A (en) Injection speed control method of die casting machine
US6598658B2 (en) Apparatus and method of forming parts
JP2002522004A (en) Methods and systems for injection molding utilizing variable volume spill cavities and articles made therefrom
US6564853B1 (en) Multiple casting apparatus and method
JP3122689B2 (en) Method for plugging a gate of a blast furnace and a plugging machine for performing the method
JPH1015653A (en) Injection molding method and equipment
EP0368573A3 (en) Method and apparatus for casting metal alloys with low melting temperatures
JPH06142884A (en) Injection device of die casting machine
JPH05253658A (en) Casting apparatus and casting method for die casting
JPS63273561A (en) Method and apparatus for controlling pressure
JP3194412B2 (en) Method and apparatus for extruding products such as high-pressure casters
JPH07227667A (en) Die casting
EP0993891A1 (en) Pressure casting of battery terminals
CN119501029B (en) A constant liquid level low-pressure casting device and casting method without a riser tube
GB1587909A (en) Furnace pressurisation of a low pressure die-casting machine
JP3008617B2 (en) Slurry supply device for low pressure injection molding