JPH0344975B2 - - Google Patents
Info
- Publication number
- JPH0344975B2 JPH0344975B2 JP58084913A JP8491383A JPH0344975B2 JP H0344975 B2 JPH0344975 B2 JP H0344975B2 JP 58084913 A JP58084913 A JP 58084913A JP 8491383 A JP8491383 A JP 8491383A JP H0344975 B2 JPH0344975 B2 JP H0344975B2
- Authority
- JP
- Japan
- Prior art keywords
- swing frame
- stage
- swing
- bucket
- elevator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G67/00—Loading or unloading vehicles
- B65G67/60—Loading or unloading ships
- B65G67/606—Loading or unloading ships using devices specially adapted for bulk material
Landscapes
- Engineering & Computer Science (AREA)
- Ocean & Marine Engineering (AREA)
- Aviation & Aerospace Engineering (AREA)
- Mechanical Engineering (AREA)
- Chain Conveyers (AREA)
- Ship Loading And Unloading (AREA)
Description
【発明の詳細な説明】
本発明は連続アンローダに関し、特に改良され
た新規なスイング機構を有するバケツトエレベー
タ式連続アンローダに関する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to continuous unloaders, and more particularly to a bucket elevator type continuous unloader having a novel and improved swing mechanism.
従来のバケツトエレベータにおいては、バケツ
トが上昇する方向にしかスイングできなかつた。
これではバケツトからの荷こぼれを防ぐため約
60゜までしかスイングできない。 In conventional bucket elevators, the bucket can only swing in the upward direction.
This is to prevent cargo from spilling from the bucket.
Can only swing up to 60 degrees.
したがつて、掘削部が船艙の上角部に届かない
ことがあり、荷取り方法も崩れ込みを期待する方
法とならざるを得ず、確実性に欠けていた。 Therefore, the excavation part may not reach the upper corner of the hold, and the method of unloading the cargo has to rely on the method of collapsing, which lacks reliability.
又このようなスイングでは扱物を船艙の中央か
ら外側へ押出す荷役方法となり、上・中荷では有
利であるが、底荷ではブルドーザの動きとは逆と
なり、不利となる。 In addition, such a swing is a cargo handling method in which the cargo is pushed outward from the center of the hold, which is advantageous for top and middle loads, but disadvantageous for bottom loads as it is opposite to the movement of a bulldozer.
さらに底荷では、扱物の層の深さが浅くなり、
従来の如く、バケツトエレベータをまつすぐに突
込んだのでは能力が出ない欠点がある。 Furthermore, in bottom cargo, the depth of the layer of material to be handled becomes shallower,
As in the past, there is a drawback that if you rush into the bucket elevator right away, you won't get the full capacity.
さらに又、荷役対象船舶が大小極端に異なる場
合、従来の機能では大小いずれの船舶にも対応す
ることが困難であつた。 Furthermore, when the ships to be handled are extremely different in size, it is difficult to handle both large and small ships with conventional functions.
本発明はこうした問題点を解決すべく改良され
たもので、その構成を要約すると次の通りであ
る。即ち、バケツトの回転方向に対しバケツトエ
レベータに、長短2段階即ち前側への第1スイン
グ機構と後側への第2スイング機構とをもたせる
ことにより、荷役範囲を拡大して荷役効率を向上
させ、かつ2段階スイング方式を採用することに
より機動性をさらに向上し、荷役効率の向上と、
小型船舶への対応を可能となしたものである。 The present invention has been improved to solve these problems, and its configuration can be summarized as follows. That is, by providing the bucket elevator with two long and short swing mechanisms in the direction of rotation of the bucket, that is, a first swing mechanism toward the front and a second swing mechanism toward the rear, the cargo handling range is expanded and cargo handling efficiency is improved. , and by adopting a two-stage swing system, it further improves maneuverability and improves cargo handling efficiency.
This made it possible to accommodate small vessels.
以下、図面に示した実施例について説明する。
第1図と第2図において、Xは第1スイング機構
で、スイング用油圧シリンダ1とスイング用アー
ム2aとからなつている。1段目スイング用油圧
シリンダ1は、図外ブームの先端に常に垂直とさ
れ、かつ旋回可能に支持されているエレベータポ
スト7に取付けられている。そして油圧シリンダ
1の作動により、スイング用アーム2aを介して
1段目スイングフレーム2をエレベータポスト7
の長手方向軸線c1より前側(バケツトの上り側)
にスイングする。そのスイング角度はバケツト上
昇側(第1図の左側)に約60゜である。 The embodiments shown in the drawings will be described below.
In FIGS. 1 and 2, X represents a first swing mechanism, which is composed of a swing hydraulic cylinder 1 and a swing arm 2a. The first-stage swing hydraulic cylinder 1 is attached to an elevator post 7 that is always perpendicular to the tip of a boom (not shown) and is rotatably supported. Then, by operating the hydraulic cylinder 1, the first stage swing frame 2 is moved to the elevator post 7 via the swing arm 2a.
Front side of longitudinal axis c 1 (upside of bucket)
swing to. The swing angle is about 60 degrees to the bucket rising side (left side in Figure 1).
1段目スイングフレーム2には伸縮シリンダ8
を介して伸縮ビーム3が取付けられている。Yは
第2スイング機構で、2段目スイング用油圧シリ
ンダ4とスイング用リンク5とで構成されてい
る。伸縮ビーム3には2段目スイング用油圧シリ
ンダ4および2段目スイングフレーム6が取付け
られ、第2スイング機構Yを構成する油圧シリン
ダ4の作動によりスイング用リンク5を介して2
段目スイングフレーム6が1段目スイングフレー
ム2の長手方向軸線c2より後側(バケツトの下り
側)に約90゜までスイングする。9はバケツト、
10はチエンである。チエン10はサイドスプロ
ケツト11又はチエンガイド12を介して、常時
スイングフレーム2,6の同様のスイング動作を
なす。 The first stage swing frame 2 has a telescopic cylinder 8
A telescopic beam 3 is attached via the. Y is a second swing mechanism, which is composed of a second-stage swing hydraulic cylinder 4 and a swing link 5. A second-stage swing hydraulic cylinder 4 and a second-stage swing frame 6 are attached to the telescopic beam 3, and the second-stage swing hydraulic cylinder 4 and second-stage swing frame 6 are attached to the telescopic beam 3.
The stage swing frame 6 swings to the rear side (downward side of the bucket) by about 90 degrees from the longitudinal axis c2 of the first stage swing frame 2 . 9 is Bucket,
10 is chain. The chain 10 always makes the same swing motion of the swing frames 2 and 6 via the side sprocket 11 or the chain guide 12.
以上のようなスイング機構を従来型のスイング
機構の作動と対比しながら次にその作動について
説明する。 Next, the operation of the swing mechanism described above will be explained while comparing it with the operation of a conventional swing mechanism.
第3図〜第6図は従来型の片側スイング型と、
本発明の1段前側スイング、2段後側スイングと
を併用した2段階スイング型の作動を比較したも
ので、本発明によるアンローダAを一点鎖線で表
わし、従来型Bを点線で表わす。なお、矢印aは
バケツトエレベータの回転方向を示す。 Figures 3 to 6 show the conventional one-side swing type,
This is a comparison of the operation of a two-stage swing type that uses both the first-stage front swing and the second-stage rear swing of the present invention, with the unloader A according to the present invention being represented by a dashed line, and the conventional type B being represented by a dotted line. Note that arrow a indicates the rotation direction of the bucket elevator.
第3図は小型船舶での作業状態を示している
が、大船舶を対象にして設計された従来型Bのバ
ケツトエレベータでは、その作業範囲および機動
性において充分でなく、荷役効率が極端に低下す
る。しかも、図の斜線で示した部分13に扱物が
残るだけでなく、バケツトエレベータを旋回する
場合、船16との当りを避けるため、バケツトエ
レベータ垂直部を移動する必要がある。 Figure 3 shows the working conditions on a small ship, but the conventional type B bucket elevator, which was designed for large ships, is insufficient in its working range and maneuverability, and its cargo handling efficiency is extremely low. descend. Moreover, not only the objects to be handled remain in the shaded area 13 in the figure, but also the vertical part of the bucket elevator must be moved to avoid collision with the ship 16 when turning the bucket elevator.
第4図は本発明によるアンローダAの小型船舶
での作業範囲を示し、第4図の右側一点鎖線Aの
状態から、その下方左側一点鎖線A′の状態に移
行させることにより、扱物を崩し、掻き寄せなが
ら効率よく荷役することができる。 FIG. 4 shows the working range of the unloader A according to the present invention on a small ship, and the work area of the unloader A according to the present invention is shown by shifting from the state indicated by the dashed-dotted line A on the right side of FIG. , cargo can be handled efficiently while raking.
第5図は底荷を荷役する場合の作動状態を示し
たもので、従来型Bでは、底荷の扱物の層深さが
浅いので、必要な掘削深さで底荷を取ることがで
きず、荷役効率の低下を免がれないが、本発明に
よるアンローダAでは、長短2段のスイングが可
能であるから、2段目スイングフレーム6を船底
と平行にすることにより、極めて効率的な荷扱い
を行わせることができる。 Figure 5 shows the operating state when handling bottom cargo.In conventional type B, the depth of the bottom cargo to be handled is shallow, so the bottom cargo cannot be removed at the required excavation depth. However, since the unloader A according to the present invention is capable of swinging in two stages, long and short, by making the second stage swing frame 6 parallel to the bottom of the ship, extremely efficient Can be used to handle cargo.
さらに又、前記第5図の作動状態では、第6図
に示すように、従来型Bでは、バケツトが扱い物
を船倉の外側に向けて押出すように作用するため
山14が外側にできる。これはブルドーザの動き
と逆になり、不利である。 Furthermore, in the operating state shown in FIG. 5, in the conventional type B, as shown in FIG. 6, the bucket acts to push the objects to be handled toward the outside of the hold, so that a mountain 14 is formed on the outside. This is disadvantageous as it is opposite to the movement of the bulldozer.
これに対し、本発明によるアンローダAでは外
側の扱い物を内側に掻き寄せ、山15を作るが、
この山15はバケツトで掬う方向であるから効率
のよい荷役ができる。 On the other hand, in the unloader A according to the present invention, the objects to be handled on the outside are scraped inward to form a pile 15.
Since this pile 15 is in the direction of scooping with a bucket, efficient cargo handling is possible.
なお、本発明ではブームの先端に可動的に連結
したL形フレームを介して該L形フレームを回転
的に吊設したバケツトエレベータを回転機構によ
り自動可能とした連続アンローダに適用してい
る。 The present invention is applied to a continuous unloader in which a bucket elevator, in which the L-shaped frame is rotatably suspended via an L-shaped frame movably connected to the tip of the boom, is automatically enabled by a rotating mechanism.
以上説明したように、本発明はバケツトの回転
方向に対し1段目フレームによる前側スイングに
2段目フレームによる後側スイングを付加したこ
とにより、極めて機動的、かつ効果的荷扱いが可
能となり、さらに小型船舶への対応も充分できる
優れた特徴を有する。 As explained above, the present invention adds the rear swing of the second stage frame to the front swing of the first stage frame in the direction of rotation of the bucket bag, making it possible to handle cargo extremely maneuverably and effectively. Furthermore, it has excellent features that make it suitable for small vessels.
第1図は本発明のバケツトエレベータにおける
スイング機構を示し、第2図は第1図の側面図、
第3図〜第6図は従来型の1段スイング機構と本
発明による2段階スイング機構との作動比較図を
示す。
図において;X……第1スイング機構、Y……
第2スイング機構、1……1段目スイング用油圧
シリンダ、2……1段目スイングフレーム、2a
……スイング用アーム、3……伸縮ビーム、4…
…油圧シリンダ、5……スイング用リンク、6…
…2段目スイングフレーム、7……エレベータポ
スト、8……伸縮シリンダ、9……バケツト、1
0……チエン、11……ガイドスプロケツト、1
2……チエンガイド、13……荷、14……(押
し出された)荷の山、15……(本発明による)
内側に掻き出された荷の山、16……船。
FIG. 1 shows the swing mechanism in the bucket elevator of the present invention, and FIG. 2 is a side view of FIG.
3 to 6 show operational comparison diagrams between a conventional one-stage swing mechanism and a two-stage swing mechanism according to the present invention. In the diagram; X...first swing mechanism, Y...
Second swing mechanism, 1... Hydraulic cylinder for first stage swing, 2... First stage swing frame, 2a
...Swing arm, 3... Telescopic beam, 4...
...Hydraulic cylinder, 5...Swing link, 6...
...2nd stage swing frame, 7...Elevator post, 8...Telescopic cylinder, 9...Bucket, 1
0...Chain, 11...Guide sprocket, 1
2... Chain guide, 13... Load, 14... (Pushed out) load pile, 15... (According to the present invention)
A pile of cargo shoved inside, 16...a ship.
Claims (1)
エレベータポスト7の下端に、1段目スイングフ
レーム2を枢着し、この1段目スイングフレーム
2の下端に2段目スイングフレーム6をさらに枢
着し、この2段目スイングフレーム6の下端に回
転可能にスプロケツトSを保持し、所定ピツチ間
隔でバケツト9がとりつけられたエレベータチエ
ン10を前記スプロケツトSに巻回しており、前
記エレベータポスト7と1段目スイングフレーム
2との間に1段目スイングフレーム2がエレベー
タポスト7の長手方向軸線c1とエレベータチエン
10が巻回されている前記スプロケツトSの回転
方向前方側とにわたつてスイング可能にする第1
スイング機構Xを、又1段目スイングフレーム2
と2段目スイングフレーム6との間には2段目ス
イングフレーム6が1段目スイングフレーム2の
長手方向軸線c2とエレベータチエン10が巻回さ
れている前記スプロケツトSの回転方向後方側と
にわたつてスイング可能にする第2スイング機構
Yを備えたことを特徴とするバケツトエレベータ
式連続アンローダ。 2 第1スイング機構Xをバケツトの昇り側に約
60゜、第2スイング機構Yをバケツト降り側に約
90゜スイング可能としたことを特徴とする特許請
求の範囲第1項記載のバケツトエレベータ式連続
アンローダ。[Scope of Claims] 1. A first stage swing frame 2 is pivotally connected to the lower end of an elevator post 7 which is always vertical and rotatably supported, and a second stage swing frame 2 is pivotally connected to the lower end of the first stage swing frame 2. A swing frame 6 is further pivotally mounted, a sprocket S is rotatably held at the lower end of the second stage swing frame 6, and an elevator chain 10 to which bucket belts 9 are attached at predetermined pitch intervals is wound around the sprocket S. , the first stage swing frame 2 is located between the elevator post 7 and the first stage swing frame 2, and the longitudinal axis c1 of the elevator post 7 and the front side in the rotational direction of the sprocket S around which the elevator chain 10 is wound. The first step is to make it possible to swing over time.
The swing mechanism X and the first stage swing frame 2
and the second-stage swing frame 6, the second-stage swing frame 6 is connected to the longitudinal axis c2 of the first-stage swing frame 2 and the rear side in the rotational direction of the sprocket S around which the elevator chain 10 is wound. A bucket elevator type continuous unloader characterized in that it is equipped with a second swing mechanism Y that allows swinging over the entire length of the unloader. 2 Place the first swing mechanism X on the rising side of the bucket.
60°, the second swing mechanism Y is approximately on the downhill side.
A bucket elevator type continuous unloader according to claim 1, characterized in that the bucket elevator type continuous unloader is capable of swinging through 90 degrees.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8491383A JPS59212324A (en) | 1983-05-17 | 1983-05-17 | Continuous unloader of bucket elevator type |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8491383A JPS59212324A (en) | 1983-05-17 | 1983-05-17 | Continuous unloader of bucket elevator type |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS59212324A JPS59212324A (en) | 1984-12-01 |
| JPH0344975B2 true JPH0344975B2 (en) | 1991-07-09 |
Family
ID=13843960
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8491383A Granted JPS59212324A (en) | 1983-05-17 | 1983-05-17 | Continuous unloader of bucket elevator type |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS59212324A (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS61226421A (en) * | 1985-04-01 | 1986-10-08 | Mitsubishi Heavy Ind Ltd | Unloader |
| DE3608116A1 (en) * | 1986-03-12 | 1987-05-14 | Krupp Gmbh | STEEP CONVEYOR, ESPECIALLY FOR SHIP DISCHARGING |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS55123823A (en) * | 1979-03-13 | 1980-09-24 | Kobe Steel Ltd | Continuous type unloader |
-
1983
- 1983-05-17 JP JP8491383A patent/JPS59212324A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS59212324A (en) | 1984-12-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0551734B2 (en) | ||
| JPH1046620A (en) | Power shovel | |
| JPH0344975B2 (en) | ||
| JPH0248460B2 (en) | ||
| US4890719A (en) | Excavator for bucket elevator type continuous unloader | |
| JPS6320732B2 (en) | ||
| JPS5869635A (en) | Continuous unloader | |
| JP7317601B2 (en) | Grab bucket type unloader | |
| JPH0344976B2 (en) | ||
| JPH022768B2 (en) | ||
| JPS6122908Y2 (en) | ||
| JPS5878926A (en) | Continuous unloader | |
| JP3812989B2 (en) | Crawler type cargo handling vehicle | |
| JPS5921063Y2 (en) | dump truck | |
| JPS6175741A (en) | Unloader falling material collection device | |
| SU1416615A1 (en) | Working equipment of dragline | |
| SU1435802A1 (en) | Single bucket loader | |
| JPS59202943A (en) | Container support device for cargo handling vehicles | |
| JP2551282Y2 (en) | Paddle feeder dust prevention device | |
| JPS5852123A (en) | Scraper for bucket elevator of continuous unloader | |
| JPH04280731A (en) | Continuous type unloader | |
| JPH05238474A (en) | Unloading device for bulk cargo loaded in hold | |
| JPS62265092A (en) | Bulk carrier | |
| JPS6077010A (en) | Continuous unloader with raking mechanism | |
| JPS60112535A (en) | Bucket-elevator type dredging unloader |