JPH035509A - Shade concrete block for steel sheet pile wall - Google Patents
Shade concrete block for steel sheet pile wallInfo
- Publication number
- JPH035509A JPH035509A JP13962389A JP13962389A JPH035509A JP H035509 A JPH035509 A JP H035509A JP 13962389 A JP13962389 A JP 13962389A JP 13962389 A JP13962389 A JP 13962389A JP H035509 A JPH035509 A JP H035509A
- Authority
- JP
- Japan
- Prior art keywords
- steel sheet
- sheet pile
- pile wall
- concrete block
- side plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 53
- 239000010959 steel Substances 0.000 title claims abstract description 53
- 239000004567 concrete Substances 0.000 title claims abstract description 44
- 210000000078 claw Anatomy 0.000 claims description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 12
- 239000011178 precast concrete Substances 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 4
- 238000009415 formwork Methods 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000012856 packing Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 239000013013 elastic material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Revetment (AREA)
Abstract
Description
【発明の詳細な説明】 [産業上の利用分野コ 本発明は鋼矢板壁用笠コンクリートブロックに関する。[Detailed description of the invention] [Industrial application fields] The present invention relates to a cap concrete block for steel sheet pile walls.
[従来技術]
従来、海、河川等の岸壁あるいは地上における擁壁等と
して一般に鋼矢板が互いにその爪部を係合して連続打設
されてなる鋼矢板壁が使用される。この鋼矢板壁の上部
は体裁をよくし、岸壁の場合には防舷材などの取付構遺
体とするため、第6図に示すように笠コンクリートブロ
ックlが施される。この笠コンクリートブロック1は例
えば鋼矢板壁2の上部に縦、横の鉄筋3を籠状に配筋固
着し、その外周にコンクリート型枠をセットした後、コ
ンクリート型枠内にコンクリート4を打設し、硬化後型
枠をはずして上述のように笠コンクリートブロック1を
形成している。[Prior Art] Conventionally, steel sheet pile walls are generally used as quay walls of the sea, rivers, etc. or retaining walls on the ground, etc., in which steel sheet piles are continuously driven by engaging each other with their claws. The upper part of this steel sheet pile wall is covered with a cap concrete block l, as shown in Figure 6, in order to improve its appearance, and in the case of a quay wall, to provide a structure for attaching fenders, etc. This cap concrete block 1 is made by, for example, fixing vertical and horizontal reinforcing bars 3 to the top of a steel sheet pile wall 2 in a cage shape, setting a concrete formwork around its outer circumference, and then pouring concrete 4 into the concrete formwork. After curing, the formwork is removed to form a cap concrete block 1 as described above.
[発明が解決しようとする課題]
従来技術においては、鋼矢板2を設けた岸壁などに材料
を持込んで配筋、コンクリートの打設などを行うもので
あるため、すなわち現場打ちのなめその作業に長時間を
要し、また打設したコンクリートには養生時間が必要で
ある。さらにコンクリートの現場打ちのために笠コンク
リートブロックの位置を水面より上方に配置する必要が
あり、また前記配筋工事及び複雑な形状をしたコンクリ
ートブロック型枠の取付け、取外しに手間がかかる問題
点があった。[Problems to be Solved by the Invention] In the conventional technology, materials are brought to a quay where steel sheet piles 2 are installed and reinforcement placement, concrete placement, etc. are carried out. It takes a long time to prepare, and the poured concrete requires curing time. Furthermore, in order to cast concrete on-site, it is necessary to position the cap concrete block above the water surface, and there is also the problem that the above-mentioned reinforcement work and the installation and removal of complex-shaped concrete block forms are time-consuming. there were.
本発明は前記問題点を解決して短時間で簡単に鋼矢板壁
に設けることができる鋼矢板壁の笠コンクリートブロッ
クを提供することを目的とする。SUMMARY OF THE INVENTION An object of the present invention is to solve the above problems and provide a concrete block for a steel sheet pile wall that can be easily installed on a steel sheet pile wall in a short period of time.
[課題を解決するための手段]
本発明は爪部を係合して鋼矢板が連続打設される鋼矢板
壁の上部に設けられる笠コンクリートブロックにおいて
、鋼矢板壁の上部に載置される天板部の一側に前記鋼矢
板壁に沿って設けられる側板部゛を連設するとともにこ
れら天板部と側板部をプレキャストコンクリートブロッ
クにより一体に形成したものである。[Means for Solving the Problems] The present invention relates to a cap concrete block that is placed on the top of a steel sheet pile wall in which steel sheet piles are continuously cast by engaging claws. A side plate part is provided along the steel sheet pile wall on one side of the top plate part, and the top plate part and the side plate part are integrally formed from a precast concrete block.
[作 用]
予めプレキャストコンクリートブロックで一体形成され
た天板部を鋼矢板壁の上部に載置し、また側板部を鋼矢
板壁に沿わせてセットした後、笠コンクリートブロック
を鋼矢板壁に固定するものである。[Function] After placing the top plate integrally formed with a precast concrete block on the top of the steel sheet pile wall and setting the side plate part along the steel sheet pile wall, the cap concrete block is placed on the steel sheet pile wall. It is fixed.
[実施例] 次に本発明の一実施例を添付図面を参照して説明する。[Example] Next, one embodiment of the present invention will be described with reference to the accompanying drawings.
11は鋼矢板であり、相互の爪部12を係合させて連続
打設して鋼矢板壁13が形成されている。尚、この鋼矢
板壁13の上部14はほぼ水面15と同一高さに設定さ
れている。Reference numeral 11 denotes a steel sheet pile, and the steel sheet pile wall 13 is formed by continuously driving the steel sheet piles by engaging each other's claw portions 12. Incidentally, the upper part 14 of this steel sheet pile wall 13 is set at approximately the same height as the water surface 15.
16は笠コンクリートブロックであり、この笠コンクリ
ートブロック16は前記鋼矢板壁13の上部14に載置
する天板部17が形成され、この天板部17の前側に下
方には前記鋼矢板壁13側に沿って側板部18が垂設し
ている。これら天板部17と側板部18を一体形成した
笠コンクリートブロック16はプレキャストによって予
め工場で製造されたものである。そしてこの笠コンクリ
ートブロック13の側板部18には固定用の貫通孔19
が形成されており、この貫通孔19及び該貫通孔19に
対向して前記鋼矢板壁13に形成された貫通孔20に螺
子捧21を貫挿してこの両端にナツト22を螺着して笠
コンクリートブロック16を鋼矢板13に固定できるよ
うになっている。さらに前記天板部17の下面後端には
固定用の取付孔23が縦設しており、また鋼矢板13の
背面側の上端にはアングル状の取付座24が固着してお
り、そしてこの取付座24に挿入したボルト25が前記
取付孔23に螺着している。尚、前記取付孔23を縦設
した貫通孔とし、螺子棒を貫挿するとともに、この螺子
棒の両端にナツトを螺着して両者を固定してもよい、2
6は一端を前記鋼矢板壁13に連結したタイロッド27
はゴム板からなるワッシャーである。28は前記上部1
4と天板部17に介在するゴム等弾性板である。尚、前
記笠コンクリートブロック16の両端には止水のなめに
段部29が形成されている。Reference numeral 16 indicates a cap concrete block, and this cap concrete block 16 has a top plate portion 17 that is placed on the upper part 14 of the steel sheet pile wall 13, and the steel sheet pile wall 13 is disposed below on the front side of the top plate portion 17. A side plate portion 18 is provided vertically along the side. The cap concrete block 16 in which the top plate part 17 and the side plate part 18 are integrally formed is manufactured in advance at a factory by precasting. The side plate portion 18 of this shade concrete block 13 has a through hole 19 for fixing.
is formed, a screw thread 21 is inserted into the through hole 19 and a through hole 20 formed in the steel sheet pile wall 13 opposite to the through hole 19, and nuts 22 are screwed onto both ends of the screw thread to form the shade. The concrete block 16 can be fixed to the steel sheet pile 13. Furthermore, a mounting hole 23 for fixing is provided vertically at the rear end of the lower surface of the top plate portion 17, and an angled mounting seat 24 is fixed to the upper end of the back side of the steel sheet pile 13. A bolt 25 inserted into the mounting seat 24 is screwed into the mounting hole 23. Incidentally, the mounting hole 23 may be a vertically arranged through hole, through which a screw rod is inserted, and nuts may be screwed onto both ends of the screw rod to fix both.
6 is a tie rod 27 whose one end is connected to the steel sheet pile wall 13;
is a washer made of a rubber plate. 28 is the upper part 1
4 and the top plate portion 17 is an elastic plate made of rubber or the like. Incidentally, stepped portions 29 are formed at both ends of the cap concrete block 16 to prevent water from entering.
次に前記構成につきその作用を説明する。Next, the operation of the above structure will be explained.
予め上部14を水面15と略同−レベルになるように鋼
矢板11を連続して鋼矢板壁13を形成する6次にクレ
ーン(図示せず)等で笠コンクリートブロック16を吊
り下げて側板部18を鋼矢板壁13に沿わせ、また天板
部17を鋼矢板壁13の上部14に載置した後、貫通孔
19.20に螺子棒21を貫挿し、そしてこの螺子棒2
1の両端にナツト22を螺子して鋼矢W、壁13に笠コ
ンクリートブロック13を固定する0次に取付座24に
ボルト25を挿入して鋼矢板壁13と天板部18を固着
するものである。The steel sheet piles 11 are connected in advance to form the steel sheet pile wall 13 so that the upper part 14 is approximately at the same level as the water surface 15. Next, the concrete block 16 is suspended by a crane (not shown) or the like to form the side plate part. 18 along the steel sheet pile wall 13 and the top plate part 17 is placed on the upper part 14 of the steel sheet pile wall 13, the screw rod 21 is inserted into the through hole 19.20, and the screw rod 2
Bolts 25 are inserted into the mounting seats 24 to fix the steel sheet pile wall 13 and the top plate part 18. It is.
以上のように笠コンクリートブロック16をプレキャス
トにより予め製作しこれを鋼矢板壁13にセットした後
、螺子棒21.ボルト25により両者を固定することに
より、笠コンクリートブロック16を固定することがで
きるため、現場での配筋、コンクリートブロック打設な
どを一掃して短時間で作業を完了でき、また現場での養
生期間を無くして工期の短縮化を図ることができる。ま
た現場での配筋工事および複雑形状をしたコンクリート
ブロック型枠の取付け、取外しの手間を無くしなため工
事費の低減を図ることができるとともに施工は天候の影
響を受けることがない。As described above, after the cap concrete block 16 is precast and set on the steel sheet pile wall 13, the screw rod 21. By fixing both with the bolts 25, the cap concrete block 16 can be fixed, so the work can be completed in a short time by clearing up the reinforcing, concrete block pouring, etc. on site, and curing on the site is also possible. It is possible to shorten the construction period by eliminating the period. In addition, construction costs can be reduced because there is no need for on-site reinforcing work and the installation and removal of complex-shaped concrete block formwork, and the construction work is not affected by the weather.
さらに、笠コンクリートブロック16はプレキャスト製
のために水中部でも施工でき、したがって鋼矢板壁13
の上部14を水面を略同−高さに設定できる。このため
鋼矢板11の長さを短くできコストダウンを図ることが
できる。Furthermore, since the cap concrete block 16 is made of precast, it can be constructed even underwater, and therefore the steel sheet pile wall 13
The upper part 14 of the water surface can be set at approximately the same height as the water surface. Therefore, the length of the steel sheet pile 11 can be shortened and costs can be reduced.
また笠コンクリートブロック16の品質の向上を図るこ
とができる。さらに補修時には螺子棒21.ボルト25
を弛めることによって笠コンクリートブロック16の入
れ替えを簡単に行うことができる。Furthermore, the quality of the shade concrete block 16 can be improved. Furthermore, when repairing, the screw rod 21. bolt 25
By loosening the cap concrete blocks 16, the concrete blocks 16 can be easily replaced.
しかも笠コンクリートブロック16は天板部17と側板
部18を一体形成してL形をなくしているため、簡単に
製作できるとともに鋼矢板壁13の上部の体裁を良くす
ることができる。In addition, since the cap concrete block 16 has the top plate part 17 and the side plate part 18 integrally formed to eliminate the L shape, it can be manufactured easily and the appearance of the upper part of the steel sheet pile wall 13 can be improved.
また天板部18が鋼矢板壁13の上部14に載置するた
め安定性に優れる。Moreover, since the top plate part 18 is placed on the upper part 14 of the steel sheet pile wall 13, stability is excellent.
第3図および第4図は第2実施例および第3実施例を示
しており、前記第1実施例と同一部分には同一符号を付
しその詳細な説明を省略する。3 and 4 show a second embodiment and a third embodiment, in which the same parts as in the first embodiment are given the same reference numerals, and detailed explanation thereof will be omitted.
第2実施例においては、一方の笠コンクリートブロック
16Aの一側面には平坦面31.テーパ面32.テーパ
面33.凸所34および平坦面35が形成され、また他
方の笠コンクリートブロック16Bの一側には、平坦面
31A、テーバ面32A、平坦面32A、凹所34Aお
よび平坦面35Aが形成されており、これらは突き合わ
されて笠コンクリートブロック16A、16Bが並設さ
れている。そして前記テーパ面32.32A間にはゴム
等弾性材からなる止水パツキン36が設けられている。In the second embodiment, a flat surface 31. Tapered surface 32. Tapered surface 33. A protrusion 34 and a flat surface 35 are formed, and a flat surface 31A, a tabular surface 32A, a flat surface 32A, a recess 34A and a flat surface 35A are formed on one side of the other shade concrete block 16B. The concrete blocks 16A and 16B are placed side by side, butted against each other. A water stop packing 36 made of an elastic material such as rubber is provided between the tapered surfaces 32 and 32A.
したがって前記テーバ面32.32A等の突き合わせ部
および止水パツキン36によって漏水等を防止すること
ができる。Therefore, water leakage etc. can be prevented by the abutting portions such as the tapered surfaces 32, 32A and the water stop packing 36.
第3実施例においては、一方の笠コンクリートブロック
16Aの一側面に平坦面37.テーバ面38.平坦面3
92円状凸所4oおよび平坦面41が形成され、また他
方の笠コンクリートブロック16Bの他側には平坦面3
7A、テーバ面38A、平坦面39A、半円状凹40A
および平坦面41Aが形成され、そして前記テーパ面3
8゜38Aには止水パツキン42が設けられて漏水処理
が施工されている。In the third embodiment, a flat surface 37. Taber surface 38. flat surface 3
92 circular convex portion 4o and a flat surface 41 are formed, and a flat surface 3 is formed on the other side of the other shade concrete block 16B.
7A, Taber surface 38A, flat surface 39A, semicircular concave 40A
and a flat surface 41A are formed, and the tapered surface 3
A water stop gasket 42 is provided at 8° 38A to prevent water leakage.
尚、本発明は前記実施例に限定されるものではなく、例
えば笠コンクリートブロック側にアングルなどの取付座
を固着し、この取付座を介して鋼矢板壁に固定するなど
の種々の変形が可能である。It should be noted that the present invention is not limited to the above-mentioned embodiment, and various modifications are possible, such as fixing a mounting seat such as an angle to the shade concrete block side and fixing it to a steel sheet pile wall via this mounting seat. It is.
[発明の効果]
本発明は爪部を係合して鋼矢板が連続打設される鋼矢板
壁の上部に設けられる笠コンクリートブロックにおいて
、鋼矢板壁の上部に載置される天板部の一側に前記鋼矢
板壁に沿って設けられる側板部を連設するとともにこれ
ら矢板部を側板部をプレキャストにより一体に形成した
ものであり、笠コンクリートブロックをプレキャストに
より形成したことにより、現場での作業を低減して工期
の短縮化。[Effects of the Invention] The present invention provides a cap concrete block that is installed on the top of a steel sheet pile wall in which steel sheet piles are continuously cast by engaging the claw portions, and the top plate portion that is placed on the top of the steel sheet pile wall. A side plate section provided along the steel sheet pile wall is installed on one side, and these sheet pile sections are integrally formed by precasting, and by forming the cap concrete block by precasting, it is easy to use on site. Reduce work and shorten construction period.
コストダウンなどを図ることができる。It is possible to reduce costs.
第1図は第1実施例を示す斜視図、第2図は同平断面図
、第3図は縦断面図、第4図は第2実施例の平面図、第
5図は第3実施例の平面図、第6図は従来例の断面図で
ある。
11・・・鋼矢板 12・・・爪部13・・
・鋼矢板壁 14・・・上部16・・・笠コン
クリートブロックFig. 1 is a perspective view of the first embodiment, Fig. 2 is a cross-sectional plan view thereof, Fig. 3 is a vertical sectional view, Fig. 4 is a plan view of the second embodiment, and Fig. 5 is a third embodiment. FIG. 6 is a sectional view of a conventional example. 11... Steel sheet pile 12... Claw portion 13...
・Steel sheet pile wall 14... Upper part 16... Kasa concrete block
Claims (1)
部に設けられる笠コンクリートブロックにおいて、鋼矢
板壁の上部に載置される天板部の一側に前記鋼矢板壁に
沿って設けられる側板部を連設するとともにこれら天板
部と側板部をプレキャストにより一体に形成したことを
特徴とする鋼矢板壁用笠コンクリートブロック。In a cap concrete block that is provided on the top of a steel sheet pile wall where steel sheet piles are continuously cast by engaging the claw portions, a cap concrete block is provided on one side of the top plate portion that is placed on the top of the steel sheet pile wall. A cap concrete block for a steel sheet pile wall, characterized in that a side plate part is provided along the line and the top plate part and the side plate part are integrally formed by precasting.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1139623A JPH0625409B2 (en) | 1989-05-31 | 1989-05-31 | Cap concrete block for steel sheet pile wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1139623A JPH0625409B2 (en) | 1989-05-31 | 1989-05-31 | Cap concrete block for steel sheet pile wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH035509A true JPH035509A (en) | 1991-01-11 |
| JPH0625409B2 JPH0625409B2 (en) | 1994-04-06 |
Family
ID=15249595
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1139623A Expired - Fee Related JPH0625409B2 (en) | 1989-05-31 | 1989-05-31 | Cap concrete block for steel sheet pile wall |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0625409B2 (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS52154227A (en) * | 1976-06-18 | 1977-12-21 | Shinkouzou Gijiyutsu Kk | Method of building breast wall |
-
1989
- 1989-05-31 JP JP1139623A patent/JPH0625409B2/en not_active Expired - Fee Related
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS52154227A (en) * | 1976-06-18 | 1977-12-21 | Shinkouzou Gijiyutsu Kk | Method of building breast wall |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0625409B2 (en) | 1994-04-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2994222B2 (en) | Construction method of cast-in-place slab of precast concrete girder and its formwork | |
| JPH035509A (en) | Shade concrete block for steel sheet pile wall | |
| CN217710879U (en) | Basement post-cast strip protective structure | |
| JPH07259048A (en) | Concrete block for revetment | |
| JPH035508A (en) | Shade concrete block for steel sheet pile wall | |
| KR910007423B1 (en) | PC-Beam Bridge Construction Method Using Adjustable Bracket | |
| JPH07259049A (en) | Concrete block for revetment | |
| JP3142180B2 (en) | Concrete construction method | |
| JP3211228B2 (en) | Shaft concrete block for steel sheet pile wall | |
| CN211816455U (en) | Pre-closed advanced water stop post-pouring belt for basement outer wall | |
| JPH08269912A (en) | Fastening method of steel bridge pier to footing | |
| JP2000064314A (en) | Construction method of foundation structure | |
| CN213418096U (en) | Subside post-cast strip and pour with prefabricated apron against construction | |
| JPH0224438A (en) | Concrete unit board | |
| KR100433991B1 (en) | Wall Maintenance and Reinforce Engineering Method of Wall On the Water | |
| JPH0549787B2 (en) | ||
| JPH0771018A (en) | Working method of disposable form of concrete lining on revetment wall | |
| JPH11323912A (en) | Mounting structure of front panel and coping of steel sheet pile wall | |
| JPH0566462B2 (en) | ||
| JP3013207U (en) | Concrete Kasagi block | |
| JPH0625410B2 (en) | Cap concrete block for steel sheet pile wall | |
| JPH05187030A (en) | Gravity-type retaining wall and manufacture thereof | |
| KR200212403Y1 (en) | Built-up type temporary levee protector | |
| JPH0754371A (en) | Method of fitting and temporary-fitting concrete placing form to steel structure revetment wall | |
| JPH06240637A (en) | How to attach the bottom formwork |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |