JPH0363340A - Controlling method of flexibility of large span skeleton - Google Patents

Controlling method of flexibility of large span skeleton

Info

Publication number
JPH0363340A
JPH0363340A JP19697589A JP19697589A JPH0363340A JP H0363340 A JPH0363340 A JP H0363340A JP 19697589 A JP19697589 A JP 19697589A JP 19697589 A JP19697589 A JP 19697589A JP H0363340 A JPH0363340 A JP H0363340A
Authority
JP
Japan
Prior art keywords
span frame
large span
lower chord
frame
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP19697589A
Other languages
Japanese (ja)
Inventor
Takehisa Fukuda
福田 武久
Masayuki Hayama
早間 将之
Kazumi Nakayama
和美 中山
Osamu Chiba
脩 千葉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP19697589A priority Critical patent/JPH0363340A/en
Publication of JPH0363340A publication Critical patent/JPH0363340A/en
Pending legal-status Critical Current

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明は大スパン架構の梁のたわみの制御方法に関する
ものである。
DETAILED DESCRIPTION OF THE INVENTION <Industrial Application Field> The present invention relates to a method for controlling deflection of a beam in a large span frame.

(従来の技術) 大スパン架構は屋内競技場や大型格納庫等中間に柱を設
けない構造物に使用されている。
(Prior Art) Large span frames are used for structures such as indoor stadiums and large hangars that do not have intermediate columns.

これらの構造物は100m〜200mの大スパンのトラ
ス屋模型式の梁を両端で支持しているため、鉄梁が自重
等の鉛直荷重により下側にたわむという問題があった。
Since these structures support truss shop model beams with large spans of 100 m to 200 m at both ends, there is a problem in that the steel beams bend downward due to vertical loads such as their own weight.

そこで、近年はこのたわみを制御する方法、すなわち第
4図及び第5図に示すような梁Mに「むくり」をつける
代表的な方法として以下の2つの方法が提案されている
Therefore, in recent years, the following two methods have been proposed as a method for controlling this deflection, that is, as a typical method for adding "bulge" to the beam M as shown in FIGS. 4 and 5.

まず第1は第4図に示すように、両柱5の脚柱部に互に
対向する内側への水平力Pを与えることによって点線で
せ示すような梁Mに実線で示すような「むくりJを与え
る方法である。
First, as shown in FIG. 4, by applying a horizontal force P to the pillars of both pillars 5 inwardly facing each other, the beam M shown by the dotted line is forced to create a "muscle" shown by the solid line. This is a method of giving chestnut J.

第2は第5図に示すように梁Mの下弦材6に沿わせた高
張力鋼線(図示せず)を両端から緊張することにより点
線で示すような梁Mに実線で示すような「むくり」を与
える方法である。
Second, as shown in FIG. 5, by tensioning a high-tensile steel wire (not shown) along the lower chord member 6 of the beam M from both ends, the beam M shown by the dotted line has the shape shown by the solid line. This is a method of giving ``mukuri''.

(発明が解決しようとする課題) しかしながら、上記の方法のうち第1の方法は水平力を
加えることによる移動作業と、大きな水平力を加えた状
態における固定作業とを必要とするため作業工程が煩雑
になるばかりでなく、柱脚部への水平力を与えるための
専用の反力装置を必要とし、さらに基礎が大型になって
工費が嵩むという問題があった。
(Problem to be Solved by the Invention) However, the first method among the above methods requires moving work by applying a horizontal force and fixing work while applying a large horizontal force, so the work process is slow. Not only is this complicated, but it also requires a special reaction force device to apply horizontal force to the column base, and there are also problems in that the foundation becomes large and construction costs increase.

また第2の方法は高張力鋼線が梁に組み込まれるので、
施工的に困難な面があると共に前記と同様に工費が嵩む
といった問題があった。
In the second method, high-tensile steel wires are incorporated into the beam, so
There were problems in that it was difficult to construct and, like the above, the construction cost increased.

本発明は、上記のような問題点に鑑みてなされたもので
あり、その目的は大スパン架構における梁に簡潔かつ安
価にむくりを与えてたわみを制御することのできる大ス
パン架構のたわみの制御方法を提供することである。
The present invention has been made in view of the above-mentioned problems, and its purpose is to control the deflection of a large-span frame by simply and inexpensively providing a curve to the beam in the large-span frame. The object of the present invention is to provide a control method.

く課題を達成するための手段) 以上の課題を達成するための本発明の手段たる構成は、
下弦材を予め算出した下弦材の長さより短くした梁の両
端に柱を設けて大スパン架構を形成し、該大スパン架構
を組立てる際に梁を支持仮台で鉛直方向へ支持すると共
に前記柱脚部を移動可能な滑り支承で支持し、しかる後
前記支持仮台を取り外くことを特徴とする大スパン架構
のたわみの制御方法に存する。
(Means for achieving the above objects) The configuration of the present invention as a means for achieving the above objects is as follows.
A large-span frame is formed by installing columns at both ends of a beam whose lower chord is shorter than the pre-calculated length of the lower chord, and when assembling the large-span frame, the beam is supported in the vertical direction with temporary support stands, and the columns are The present invention resides in a method for controlling deflection of a large span frame, which comprises supporting the legs with movable sliding bearings and then removing the temporary support base.

(作用) 而して上記のような構成によると、梁の下弦材を予め算
出した下弦材の長さより短くすることにより、梁に予め
鉛直上方へのむくりを与えた大スパン架構が形成され、
該大スパン架構を組立る際に、梁を支持仮台で支えると
共に柱を滑り支承で支持して組立て、該大スパン架構を
組立てた後に支持仮台を取り外すことにより、梁に自重
及び積載荷重による下方への鉛直荷重が加わえられるの
で滑り支承側の柱脚が外側に移動して下弦材が予め算出
した長さになることにより大スパン架構が予め設計した
形状に形成されてたわみを制御することができる。
(Function) According to the above configuration, by making the lower chord of the beam shorter than the pre-calculated length of the lower chord, a large span frame is formed in which the beam is curved vertically upward in advance. ,
When assembling the large span frame, the beams are supported by temporary supports and the columns are supported by sliding bearings, and the temporary supports are removed after the large span frame is assembled, so that the beams are free from their own weight and live load. As a downward vertical load is applied, the column base on the sliding bearing side moves outward and the bottom chord reaches the pre-calculated length, forming the large-span frame into the pre-designed shape and controlling deflection. can do.

(実施例) 以下、本発明の一実施例を図面に基づいて詳細に説明す
る。
(Example) Hereinafter, an example of the present invention will be described in detail based on the drawings.

第1図は大スパン架構Aの正面図であり、上弦材1aと
下弦材1bと束材又は斜材1cで構成されたトラス状の
梁1の両端に柱2が接合されて構成されている。
Figure 1 is a front view of a large-span frame A, which is composed of columns 2 joined to both ends of a truss-shaped beam 1 composed of an upper chord member 1a, a lower chord member 1b, and a bundle or diagonal member 1c. .

梁1は下弦材1bが予め算出した下弦材1dの長さより
も短く形成されているため、第1図に示すように上方へ
の鉛直力、即ち上方へのむくりが与えられた状態で形成
されている。
Since the lower chord member 1b of the beam 1 is formed to be shorter than the pre-calculated length of the lower chord member 1d, the beam 1 is formed with an upward vertical force, that is, an upward curve, as shown in Fig. 1. has been done.

また該梁lの両端に設けられた柱2の一方の下端には滑
り支承3が取り付けられて移動可能に形成され、梁1に
加えられる下方への鉛直荷0重により外側に移動して拡
開する。
In addition, a slide support 3 is attached to the lower end of one of the pillars 2 provided at both ends of the beam 1, and is formed to be movable. Open.

尚、この滑り支承4は両方の柱2または梁1の両端部或
は片端部に設けることも任意であり、いずれの場合も上
記と同様に柱2及び梁1が外側に移動する。
Note that this sliding support 4 may optionally be provided at both ends or one end of both pillars 2 or beams 1, and in either case, the pillars 2 and beams 1 move outward in the same manner as described above.

而して該大スパン架mAを組立る場合は、第1図に示す
ように梁1を支持架台4で支えた状態で柱2を組立てる
。この際鉄梁1は下弦材1bが予め算出した下弦材1d
の長さより短いため上方へのむくりが与えられた状態で
組立られ、かつ両方の柱2も内側に傾いた状態で固定さ
れる。
When assembling the large span frame mA, the pillars 2 are assembled with the beams 1 supported by the support frames 4, as shown in FIG. At this time, the steel beam 1 has a lower chord member 1b calculated in advance.
Because it is shorter than the length of , it is assembled in an upwardly curved state, and both pillars 2 are also fixed in an inwardly inclined state.

そして、これら両方の柱2が固定されて大スパン架構A
が組み立てられた後に前記支持架台4を取り外すことに
より、梁1に自重等の下方への鉛直荷重が加えられるの
で、滑り支承3が設けられた柱2が外側に拡開されて第
1図の点線で示されるような予め設計した形状に形成さ
れる。
Then, both of these columns 2 are fixed to form a large span frame A.
By removing the support pedestal 4 after the support frame 4 is assembled, a downward vertical load such as its own weight is applied to the beam 1, so that the column 2 on which the sliding support 3 is installed is expanded outward, as shown in FIG. It is formed into a pre-designed shape as shown by the dotted line.

また、上記のように滑り支承3を柱2に設けるのではな
く、梁1の両端部または片端部に設けた場合は梁1端部
を支持架台4で支持した後、該支持架台4を取り外すと
上記と同様な効果を得ることができる。
In addition, if the sliding bearing 3 is not provided on the pillar 2 as described above but is provided on both ends or one end of the beam 1, the end of the beam 1 is supported by the support pedestal 4, and then the support pedestal 4 is removed. The same effect as above can be obtained.

第2図は上、下弦材が350X350X12X19  
(以下いずれも単位はmm )のHfRで、柱が900
X3QOχ16X2.9のH鋼で形成した大スパン架構
Aとそれに使用する部材を示したものであり、これを解
析することにより予め算出した予定した形状に形成され
た。
In Figure 2, the upper and lower chords are 350X350X12X19
(All units below are mm) HfR, the column is 900
This figure shows a large span frame A made of H steel of X3QOχ16X2.9 and the members used therein, which were formed into a planned shape calculated in advance by analyzing this.

この場合、第2図において下弦材1bは予め算出した第
3図の下弦材1dの長さより10cm短縮した長さであ
る。
In this case, the length of the lower chord member 1b in FIG. 2 is 10 cm shorter than the previously calculated length of the lower chord member 1d in FIG.

この結果を施工的にも考慮すれば第2図の形状の大スパ
ン架構Aを組立てると共に、梁1を支持架台4で支持し
、組立完了後に該支持架台4を取り外すことにより大ス
パン架IAが第3図のように予め算出した予定の形状に
形成されることを証明することができ、かつ下記の効果
を確認することができた。
Taking this result into consideration in terms of construction, the large span frame IA can be constructed by assembling the large span frame A having the shape shown in Figure 2, supporting the beam 1 with the support frame 4, and removing the support frame 4 after the assembly is completed. As shown in FIG. 3, it was possible to prove that the film was formed into the pre-calculated planned shape, and the following effects were confirmed.

(発明の効果) 本発明は以上の様な構成にしたことにより下記の効果を
有する。     ′ ■ 下弦材を予め算出した下弦材の長さより短くした梁
の両端に柱を設けて大スパン架構を形成し、該大スパン
架構を組立てる際に梁を支持仮台で鉛直方向にすると共
に、前記柱を移動可能な滑り支承で固定し、しかる後に
前記支持仮台を取り外すことにより、梁の自重等により
柱が外側に拡開するので、大スパン架構が予め設計した
形状に形成されてたわみを容易に制御することができる
(Effects of the Invention) The present invention has the following effects by having the above configuration. ′ ■ A large-span frame is formed by installing columns at both ends of a beam whose lower chord is shorter than the pre-calculated length of the lower chord, and when assembling the large-span frame, the beam is oriented vertically with temporary supports, By fixing the column with a movable sliding bearing and then removing the temporary support base, the column expands outward due to the beam's own weight, so the large span frame is formed into a pre-designed shape and bends. can be easily controlled.

■ 柱の下端に滑り支承を設けたことにより応力加がな
く、しかも外力を必要とせずにたわみのの制御をするこ
とができる。
■ By providing a sliding bearing at the lower end of the column, no stress is applied, and deflection can be controlled without the need for external force.

【図面の簡単な説明】[Brief explanation of drawings]

第1図〜第3図は本発明の大スパン架構のたわみの制御
方法の実施状況を示す正面図、第4図及び第5図は従来
の大スパン架構のたわみの制御方法の実施状況を示す正
面図である。 A:大スパン架構   1:梁 la:上弦材     1b:下弦材 1d:予め算出した下弦材 2:柱        3:滑り支承 4:支持架台
Figures 1 to 3 are front views showing how the method for controlling deflection of a large span frame according to the present invention is implemented, and Figures 4 and 5 show how the conventional method for controlling deflection of a large span frame is implemented. It is a front view. A: Large span frame 1: Beam la: Upper chord member 1b: Lower chord member 1d: Lower chord member calculated in advance 2: Column 3: Sliding support 4: Support frame

Claims (1)

【特許請求の範囲】[Claims] 下弦材を予め算出した下弦材の長さより短くした梁の両
端に柱を設けて大スパン架構を形成し、該大スパン架構
を組立てる際に梁を支持仮台で鉛直方向へ支持すると共
に、前記柱脚部を移動可能な滑り支承で支持し、しかる
後に前記支持仮台を取り外すことを特徴とする大スパン
架構のたわみの制御方法。
A large span frame is formed by providing columns at both ends of a beam whose lower chord is shorter than the pre-calculated length of the lower chord, and when assembling the large span frame, the beam is supported in the vertical direction by temporary support stands, and A method for controlling deflection of a large-span frame, comprising supporting a column base with a movable sliding support, and then removing the temporary support base.
JP19697589A 1989-07-31 1989-07-31 Controlling method of flexibility of large span skeleton Pending JPH0363340A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19697589A JPH0363340A (en) 1989-07-31 1989-07-31 Controlling method of flexibility of large span skeleton

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19697589A JPH0363340A (en) 1989-07-31 1989-07-31 Controlling method of flexibility of large span skeleton

Publications (1)

Publication Number Publication Date
JPH0363340A true JPH0363340A (en) 1991-03-19

Family

ID=16366756

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19697589A Pending JPH0363340A (en) 1989-07-31 1989-07-31 Controlling method of flexibility of large span skeleton

Country Status (1)

Country Link
JP (1) JPH0363340A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63233138A (en) * 1987-03-20 1988-09-28 川崎製鉄株式会社 Construction method of truss beam

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63233138A (en) * 1987-03-20 1988-09-28 川崎製鉄株式会社 Construction method of truss beam

Similar Documents

Publication Publication Date Title
JPH0820910A (en) Construction method of PC cable stayed bridge
JP2000352017A (en) Bridge construction method
JPH0363340A (en) Controlling method of flexibility of large span skeleton
JPH02136445A (en) Construction of structure including superframe
JP3247749B2 (en) Construction method of long span truss beams
JPH03293447A (en) Erection of long span construction
JP2934668B2 (en) Beam structure
JPH0715180B2 (en) Deflection control method for large span frame
JPH03103560A (en) Truss structure
JP2761792B2 (en) Construction method of large space building
RU2188915C1 (en) Method of installation of prestressed strutted frame
JP2926147B2 (en) Building construction method
JP2916585B2 (en) Construction method of building
JP3200783B2 (en) Retractable roof
JPH01102146A (en) Construction of large span structure
JPH04216776A (en) Construction method of long span steel frame skeleton
JP3174924B2 (en) Beam string structure
JP2916587B2 (en) Construction method of building
JP2903006B2 (en) Push-up method for large roof
JPH07259191A (en) All-weather construction method for structures
JPH05340002A (en) Construction method for steel construction building with large outrigger girder
JPH0686752B2 (en) Construction method for the roof of a large-scale building
JPS62228568A (en) Construction of roof of structure
JPH07197536A (en) Building
JP2595057Y2 (en) Large roof frame