JPH041368A - Underfloor stable execution method - Google Patents
Underfloor stable execution methodInfo
- Publication number
- JPH041368A JPH041368A JP10363090A JP10363090A JPH041368A JP H041368 A JPH041368 A JP H041368A JP 10363090 A JP10363090 A JP 10363090A JP 10363090 A JP10363090 A JP 10363090A JP H041368 A JPH041368 A JP H041368A
- Authority
- JP
- Japan
- Prior art keywords
- floor
- existing
- bundle
- existing floor
- forms
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title description 2
- 239000000463 material Substances 0.000 claims abstract description 18
- 239000000945 filler Substances 0.000 claims abstract description 13
- 239000011347 resin Substances 0.000 claims abstract description 12
- 229920005989 resin Polymers 0.000 claims abstract description 12
- 238000010276 construction Methods 0.000 claims description 15
- 238000009415 formwork Methods 0.000 claims description 14
- 239000006260 foam Substances 0.000 claims description 5
- 238000005187 foaming Methods 0.000 abstract 1
- 239000011162 core material Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000007667 floating Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Landscapes
- Residential Or Office Buildings (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Floor Finish (AREA)
Abstract
Description
【発明の詳細な説明】
産業上の利用分野
この発明は、建物の既設床部に、プレハブ式の室内設備
の床部を安定して固定するための床下安定施工法に関す
るものである。DETAILED DESCRIPTION OF THE INVENTION Field of Industrial Application This invention relates to a stable underfloor construction method for stably fixing the floor of prefabricated indoor equipment to the existing floor of a building.
従来の技術
一般に、既存の浴室を改修する場合、床部を残して既設
の壁を撤去したのち、下地補修を行t)、防水・防湿工
事を行っ1こ後、モルタルやタイル等による仕上げ工事
を行う。しにかって、改修工事をするには、各種技能工
か必要であり、また、その工期も比較的長期(20日乃
至1箇月)に及ぶ。Conventional technology Generally, when renovating an existing bathroom, the existing walls are removed leaving the floor intact, the foundation is repaired (t), waterproofing/moisture proofing work is carried out, and finishing work with mortar, tiles, etc. is carried out. I do. Therefore, various types of skilled workers are required to carry out the repair work, and the work period is relatively long (20 days to one month).
その1こめ、その施工期間中に入浴することは出来ない
。そこで、施工期間の短縮化を図るべく、ユニットバス
や組み立て式のプレハブバス等が提供されているが、ユ
ニットバスは一定の規格的な寸法に製作されるから、既
設の室内にそのまま過不足なく収納することは出来ない
ものである。しかしながら、プレハブバスは、既設の浴
室内に収まるへき新しい浴室を個々的に設計した上で、
その設計に基づいてプレハブ式に浴室を工場生産し、そ
れを現場に搬入して短期間(l乃至2日)で組み立て施
工をするものであるから、前記施工期間の問題を解決し
ており、近時、反響が著しく、その施工注文が増大して
いる。First, you will not be able to take a bath during the construction period. Therefore, in order to shorten the construction period, unit baths and prefabricated prefabricated baths are provided, but unit baths are manufactured to a certain standard size, so they can be placed directly in the existing room. It cannot be stored. However, prefabricated baths are designed to fit within the existing bathroom, and the new bathroom is individually designed.
Based on the design, a prefabricated bathroom is produced in a factory, then delivered to the site and assembled in a short period of time (1 to 2 days), which solves the problem of the construction period. Recently, the response has been remarkable and the number of orders for its construction is increasing.
発明が解決しようとする課題
しかしながら、」二記プレハブバスを既設浴室の床部に
載置固定する際、既設床部が排水孔を中心として所定の
傾斜角度を有し、又は凸凹があったりするために、床部
を安定して固定させることはなかなか難しく、かなりの
経験と熟練を要する。Problem to be Solved by the Invention However, when mounting and fixing the prefabricated bath mentioned in 2 on the floor of an existing bathroom, the existing floor may have a predetermined inclination angle around the drainage hole or may be uneven. Therefore, it is difficult to stably fix the floor and requires considerable experience and skill.
すなわち、通例、浴室の既設床部は正方形若しくは長方
形であるから、当然に、プレハブバスの床部も正方形若
しくは長方形となるか、このような形状では、床部を支
持するだめの束を四隅に設(するので、4本の束を高低
なく安定して固定することは通常困難である。3本の束
であれば安定して固定することは比較的易しいことであ
る。In other words, since the existing floor of a bathroom is usually square or rectangular, it is natural that the floor of a prefabricated bath will also be square or rectangular. Because of the construction, it is usually difficult to stably fix a bundle of four without any height.It is relatively easy to stably fix a bundle of three.
そこで、この発明は、プレハブバス等の床部を既設床部
に安定して固定するに於の施工法を目的としてなされた
。Therefore, the present invention was made for the purpose of providing a construction method for stably fixing the floor of a prefabricated bath or the like to an existing floor.
課題を解決するための手段
この発明は上記課題を解決するため、既設床部にプレハ
ブ式の室内設備の床部を載置固定する施工において、予
め室内設備の床部を既設床部の上に載置固定してその束
の高さ調整をした後、その束を中心として包囲する型枠
を既設床部に載置し、その型枠内に発泡性樹脂材料を注
入して発泡かつ硬化させ、既設床部と室内設備の床部と
の間に硬質系の充填材を介在させる床下安定施工法を構
成したものである。Means for Solving the Problems In order to solve the above-mentioned problems, the present invention aims to solve the above-mentioned problems by placing the floor of prefabricated indoor equipment on the existing floor in advance. After placing and fixing the bundle and adjusting the height of the bundle, a formwork surrounding the bundle is placed on the existing floor, and a foamable resin material is injected into the formwork to foam and harden. , a stable underfloor construction method in which a hard filler is interposed between the existing floor and the floor of indoor equipment.
作用
上記施工法によれば、室内設備の床部は、束の高さ調整
のみによっては十分な安定状態が得られない場合に、発
泡性樹脂材料が既設床部と室内設備の床部との間を束を
中心として堅く充填するから、束が既設床部から浮いて
いても、その充填材により支持され、安定する。Function According to the above construction method, when the floor of the indoor equipment cannot be stabilized by adjusting the height of the bundle alone, the foamed resin material can be used to connect the existing floor and the floor of the indoor equipment. Since the spaces are tightly filled with the bundle at the center, even if the bundle floats off the existing floor, it will be supported and stabilized by the filling material.
実施例
以下にこの発明を図面に基づき説明する。第1図は既設
床部lにプレハブバス等の床部2を安定して固定した四
隅の一つの縦断面を示し、図中、3は床部2を支持する
束で、既設床部1に載置される座金4と、座金4の中央
部に突設したスクリュウネジ5と、スクリュウネジ5を
螺合して心材6に固定したナツト状部材7とからなる。EXAMPLES The present invention will be explained below with reference to the drawings. Figure 1 shows a vertical cross section of one of the four corners of a floor 2 such as a prefabricated bath that is stably fixed to the existing floor 1. In the figure, 3 is a bundle that supports the floor 2 and is attached to the existing floor 1. It consists of a washer 4 to be placed, a screw 5 protruding from the center of the washer 4, and a nut-shaped member 7 fixed to a core material 6 by screwing the screw 5 together.
8は心材6の裏面に塗覆された防水用の樹脂材料、9は
心材6の上面に張設されたタイル、10は床部2と壁部
11を連結する防水連結部である。そして、束3を中心
とする既設床部lと床部2との間に、発泡性の樹脂材料
からなる充填材12が介在している。8 is a waterproof resin material coated on the back surface of the core material 6, 9 is a tile stretched over the upper surface of the core material 6, and 10 is a waterproof connecting portion that connects the floor portion 2 and the wall portion 11. A filler 12 made of a foamable resin material is interposed between the existing floor section 1 and the floor section 2, centering on the bundle 3.
充填材12は、既設床部1に床部2を載置固定する施工
に際し、スクリュウネジ5を回転させて座金4と床部2
の間隔を調整することによって束3の高さを床12の四
隅においてそれぞれ決定し、床部2を既設床部lに載置
固定する際、第2図及び第3図に示したように、予め束
3を中心とじて包囲する状態で型枠13をそれぞれ既設
床部l上に配置し、床部2を既設床部lに載置した後、
型枠13内に発泡性樹脂材料を注入する。型枠13は所
定半径の円形でも、四角形又は多角形でもよい。発泡性
樹脂材料は空気に触れて発泡し、かつ、硬化して充填材
12となるものであり、既設床部lと床部2間の間隔は
、束3のみならず、充填材12によっても保持される。When installing and fixing the floor 2 on the existing floor 1, the filler 12 is inserted between the washer 4 and the floor 2 by rotating the screw 5.
The heights of the bundles 3 are determined at each of the four corners of the floor 12 by adjusting the intervals between them, and when the floor section 2 is placed and fixed on the existing floor section l, as shown in FIGS. 2 and 3, After placing the formwork 13 on the existing floor l in advance, surrounding the bundle 3 at the center, and placing the floor 2 on the existing floor l,
A foamable resin material is injected into the formwork 13. The formwork 13 may be circular with a predetermined radius, square, or polygonal. The foamable resin material foams when exposed to air and hardens to become the filler 12. Retained.
型枠13はそのままの状態で放置しておく。したがって
、四隅の一つの束3か既設床部1から多少浮いていて、
がたつくことがあっても、その充填材12により支持さ
れ、床部2ががたつくことがない。なお、14は排水孔
であり、既設床部lに形成されている排水孔15と連通
ずるものであるが、この排水孔14゜15を連結する排
水孔接続具16の周囲にも型枠13aを介して充填材1
2か前記同様にして形成されている。しfコがって、床
部2はその四隅と排水孔14の5つの部分において、そ
れぞれ束3と充填材12により既設床部1に支持されて
いるから、床部2は安定して既設床部lに支持されるこ
ととなる。The formwork 13 is left as it is. Therefore, one of the bundles 3 at the four corners is slightly floating from the existing floor 1,
Even if it rattles, it is supported by the filler 12 and the floor part 2 will not rattle. Note that 14 is a drainage hole that communicates with a drainage hole 15 formed in the existing floor l, and a formwork 13a is also provided around the drainage hole connector 16 that connects the drainage holes 14 and 15. Filler 1 through
2 is formed in the same manner as above. Therefore, the floor part 2 is supported by the existing floor part 1 at its four corners and five parts of the drainage holes 14 by the bundles 3 and the filler material 12, respectively, so that the floor part 2 is stably supported by the existing floor part 1. It will be supported by the floor l.
なお、充填材12は束3を中心とする局部にのみ設けに
が、それは発泡性樹脂材料か高価であるためであり、経
済か許すならば、床部2の下面全体に注入してもよい。The filling material 12 is only provided locally around the bundle 3, but this is because the foamed resin material is expensive, and if economy permits, it may be injected onto the entire bottom surface of the floor 2. .
発明の効果
以上記載したこの発明によれば、既設床部にプレハブ式
の室内設備の床部を載置固定する施工法において、予め
室内設備の床部を既設床部の上に載置固定してその束の
高さ調整をしf二後、その束を中心として包囲する型枠
を既設床部に載置し、その型枠内に発泡性樹脂材料を注
入して発泡かつ硬化させ、既設床部と室内設備の床部と
の間に硬質系の充填材を介在させるようにしたので、室
内設備の床部は、束の高さ調整のみによっては十分な安
定状態が得られない場合に、発泡性樹脂材料か既設床部
と室内設備の床部との間を束を中心として充填するから
、束が既設床部から浮いていても、その充填材により支
持され、安定するため、建物の一部を改修してプレハブ
式室内設備を組み立て施工する場合、既設床部に載置固
定した床部の一隅が浮いてかfこつくことを防止できて
、この種の施工の質の向上を図ることができる。しかも
、予め高さ調整しfこ床部の束を中心として包囲する型
枠を設け、その型枠内に発泡性樹脂材料を注入するのみ
の簡単な作業で足るから、施工作業のコスト低下及び能
率向上をもたらす、等の効果を奏する。Effects of the Invention According to the invention described above, in the construction method of placing and fixing the floor of prefabricated indoor equipment on the existing floor, the floor of the indoor equipment is placed and fixed in advance on the existing floor. After adjusting the height of the bundle, a formwork surrounding the bundle is placed on the existing floor, and a foamable resin material is injected into the formwork to foam and harden. Since a hard filler is interposed between the floor and the floor of the indoor equipment, the floor of the indoor equipment can be used in cases where a sufficiently stable state cannot be obtained only by adjusting the height of the bundle. Since the foam resin material is used to fill the space between the existing floor and the floor of the indoor equipment, centering around the bundle, even if the bundle floats off the existing floor, it will be supported and stabilized by the filling material, so the building When assembling and constructing prefabricated indoor equipment by renovating a part of the existing floor, it is possible to prevent one corner of the floor that is placed and fixed on the existing floor from floating or becoming stiff, improving the quality of this type of construction. can be achieved. In addition, it is sufficient to simply prepare a formwork that surrounds the bundle of floor parts by adjusting the height in advance, and inject the foamed resin material into the formwork, which reduces the cost of construction work. It has effects such as improving efficiency.
第1図はこの発明に係る床下安定施]二法を実施しに例
を示す要部縦断面図、第2図と第3図は施工法の説明図
で、第2図は平面図、第3図は第2図A、−A断面図で
ある。
l・・既設床部、2 室内設備の床部、3・束、12・
充填材、13・型枠Fig. 1 is a vertical sectional view of the main part showing an example of implementing the two methods of underfloor stabilization according to the present invention, Figs. 2 and 3 are explanatory diagrams of the construction method, and Fig. 2 is a plan view; FIG. 3 is a sectional view taken along line A and -A in FIG. l...Existing floor, 2 Floor of indoor equipment, 3. Bundle, 12.
Filling material, 13/Formwork
Claims (1)
定する施工において、予め室内設備の床部を既設床部の
上に載置固定してその束の高さ調整をした後、その束を
中心として包囲する型枠を既設床部に載置し、その型枠
内に発泡性樹脂材料を注入して発泡かつ硬化させ、既設
床部と室内設備の床部との間に硬質系の充填材を介在さ
せることを特徴とする床下安定施工法。(1) In construction work in which the floor of prefabricated indoor equipment is placed and fixed on the existing floor, the floor of the indoor equipment is placed and fixed on the existing floor and the height of the bundle is adjusted in advance. , place a formwork surrounding the bundle on the existing floor, inject foamable resin material into the formwork, foam and harden it, and create a space between the existing floor and the floor of indoor equipment. A stable underfloor construction method characterized by interposing a hard filler.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2103630A JPH083277B2 (en) | 1990-04-19 | 1990-04-19 | Underfloor stable construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2103630A JPH083277B2 (en) | 1990-04-19 | 1990-04-19 | Underfloor stable construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH041368A true JPH041368A (en) | 1992-01-06 |
| JPH083277B2 JPH083277B2 (en) | 1996-01-17 |
Family
ID=14359090
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2103630A Expired - Lifetime JPH083277B2 (en) | 1990-04-19 | 1990-04-19 | Underfloor stable construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH083277B2 (en) |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5227124U (en) * | 1975-08-19 | 1977-02-25 | ||
| JPS5719262A (en) * | 1980-07-03 | 1982-02-01 | Hitachi Ltd | Compensator for load of elevator |
-
1990
- 1990-04-19 JP JP2103630A patent/JPH083277B2/en not_active Expired - Lifetime
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5227124U (en) * | 1975-08-19 | 1977-02-25 | ||
| JPS5719262A (en) * | 1980-07-03 | 1982-02-01 | Hitachi Ltd | Compensator for load of elevator |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH083277B2 (en) | 1996-01-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0494061B1 (en) | A method and elements for assembling a non-recoverable formwork | |
| US10273698B2 (en) | Connector for form boards and system for cast construction | |
| JPH041368A (en) | Underfloor stable execution method | |
| US4136499A (en) | Method for making a reinforced wall or foundation | |
| KR100830239B1 (en) | Composite Method of Lightweight Composite Wall and Concrete Floor Slab of Lightweight Composite Structure System Using Pre-Construction Anchors | |
| KR101177705B1 (en) | Method of constructing unit bath room | |
| US4542612A (en) | System for forming structural concrete | |
| JP3866632B2 (en) | Floor base structure and basement floor base | |
| KR102622073B1 (en) | Inter-floor noise prevention heating piping panel that is easy to install at regular intervals of heating piping | |
| JP2000129928A (en) | Skeleton construction method, and board used therefor | |
| KR200247957Y1 (en) | Assembly panel construction system | |
| JP2855613B2 (en) | How to level the wall panel | |
| JP2821464B2 (en) | Heat storage tank wall insulation method | |
| JP2002294894A (en) | Outer lined heat insulating structure and construction method therefor | |
| JP3044011B2 (en) | Floor framing method and floor framing | |
| JP2002070035A (en) | Continuous footing form | |
| FI127725B (en) | Precast alignment element and method of mounting a volume module in a building | |
| JPH09302673A (en) | Fixing mechanism of sill of building | |
| JP2997661B2 (en) | Base plate material | |
| JP3092975B2 (en) | How to install the housing unit on the foundation | |
| JPH1037364A (en) | Construction method of wet floating floor | |
| JPH0352376Y2 (en) | ||
| JP2529445B2 (en) | Construction method of bus unit in unit housing | |
| JPH04221163A (en) | Execution method for double floor and floor plate supporting fitting using this method | |
| JP3095410B2 (en) | Floor-based manufacturing method |