JPH0480198B2 - - Google Patents
Info
- Publication number
- JPH0480198B2 JPH0480198B2 JP61293274A JP29327486A JPH0480198B2 JP H0480198 B2 JPH0480198 B2 JP H0480198B2 JP 61293274 A JP61293274 A JP 61293274A JP 29327486 A JP29327486 A JP 29327486A JP H0480198 B2 JPH0480198 B2 JP H0480198B2
- Authority
- JP
- Japan
- Prior art keywords
- inner formwork
- existing
- primary lining
- lining
- gable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009415 formwork Methods 0.000 claims description 37
- 239000000463 material Substances 0.000 claims description 19
- 238000002347 injection Methods 0.000 claims description 9
- 239000007924 injection Substances 0.000 claims description 9
- 238000010276 construction Methods 0.000 claims description 8
- 238000009412 basement excavation Methods 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 239000002131 composite material Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000011800 void material Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000003566 sealing material Substances 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
【発明の詳細な説明】
〔産業上の利用分野〕
シールドテール内で一次覆工用のセグメントリ
ングを組み立て後、放射状に摺動可能な部材を両
端部に有した内型枠リングを組み立て、二次覆工
材を打設し、一次二次覆工の同時施工を可能にし
た一次覆工を活かしたシールドトンネルの一体構
築工法に関する発明である。[Detailed Description of the Invention] [Industrial Application Field] After assembling the segment ring for the primary lining within the shield tail, the inner formwork ring having radially slidable members at both ends is assembled, and the second This invention relates to a method for integrally constructing a shield tunnel that takes advantage of the primary lining, which enables simultaneous construction of primary and secondary linings by placing secondary lining materials.
従来は一次覆工のみによるトンネルが貫通した
のち、二次覆工を施工するため工期が長くなり、
一次覆工だけで地山荷重を支持する期間が比較的
長期にわたることと、その間の荷重変化が明確で
ないため、一次覆工は永久構造物として設計せざ
るを得ず、二次覆工が強度上考慮されないため極
めて不経済な覆工となつている等の欠点を有して
いたものである。
Conventionally, a tunnel with only a primary lining was penetrated, and then a secondary lining was constructed, which increased the construction period.
Because the period in which the primary lining alone supports the earth load is relatively long, and the change in load during that period is not clear, the primary lining has no choice but to be designed as a permanent structure, and the secondary lining has a strong However, this method had drawbacks such as the fact that the above was not taken into account, making the lining extremely uneconomical.
一次覆工完了後、二次覆工することによる工期
の長期化という問題点、一次覆工を永久構造物と
するための不経済性という問題点を解決しようと
する発明である。
This invention attempts to solve the problem of prolonging the construction period by applying a secondary lining after the completion of the primary lining, and the uneconomical problem of making the primary lining a permanent structure.
既設の一次覆工セグメントの前部に一次覆工セ
グメントを組み立て固定すると共に一次覆工セグ
メントの外側に裏込め材を充填し、既設の内型枠
の前部に既設の内型枠に対し内型枠を千鳥状に組
み立て、既設の内型枠の前部の妻枠と連結した内
型枠の後部の妻枠を外方向へスライドした後、ひ
とつ後の妻枠リングを内方向へ縮め、前記拡径し
た妻枠、一次覆工セグメント、既設二次覆工及び
内型枠で囲まれた覆工材注入空間に覆工材を注入
し、同時にシールドマシンを一工程分掘進し、掘
進完了後シールドジヤツキを縮めテールにセグメ
ント等を組み立てる空間を形成して、既設の一次
覆工セグメントの前部に一次覆工セグメントを組
み立てる作業を順次くり返し行うことにより問題
点を解決したものである。
Assemble and fix the primary lining segment in front of the existing primary lining segment, fill the outside of the primary lining segment with backfill material, and fill the front part of the existing inner formwork with the inner formwork. Assemble the formwork in a staggered manner, slide the rear gable of the inner formwork that is connected to the front gable of the existing inner formwork outward, and then contract the next gable ring inward. Lining material is injected into the lining material injection space surrounded by the expanded gable frame, primary lining segment, existing secondary lining, and inner formwork, and at the same time, the shield machine is used to excavate one step to complete the excavation. This problem was solved by retracting the rear shield jack to form a space in the tail for assembling segments, etc., and repeatedly assembling the primary lining segment in front of the existing primary lining segment.
既設の一次覆工セグメントの前部一次覆工セグ
メントを組み立て固定し、既設の内型枠の前部に
既設の内型枠に対し内型枠を千鳥状に組み立て、
既設の内型枠の前部の妻枠と連結した内型枠の後
部の妻枠を外方向へスライドした後、ひとつ後の
妻枠リングを内方向へ縮め、前記拡径した妻枠、
一次覆工セグメント、既設二次覆工及び内型枠で
囲まれた覆工材注入空間に覆工材を注入し、同時
にシールドマシンを一工程分掘進し、掘進中或い
は掘進後一次覆工セグメントの背面のテールボイ
ドに裏込め材を充填し掘進完了後シールドジヤツ
キを縮めテールにセグメント等を組み立てる空間
を形成して、既設の一次覆工セグメントの前部に
一次覆工セグメントを組み立てる作業を順次くり
返し行うことにより、一次覆工、二次覆工の同時
施工を可能にしたことにより、工期を短縮でき、
初期の地山荷重の作用時点から、両覆工が合成断
面とし機能することにより極めて経済的な断面を
実現することができる。
Assemble and fix the front primary lining segment of the existing primary lining segment, assemble the inner formwork in a staggered manner to the front of the existing inner formwork, and
After sliding the rear gable of the inner formwork connected to the front gable of the existing inner formwork outward, the next gable ring after the gable is shrunk inward, and the diameter of the gable frame expanded,
The lining material is injected into the lining material injection space surrounded by the primary lining segment, the existing secondary lining, and the inner formwork, and at the same time, the shield machine is excavated for one step, and the primary lining segment is removed during or after excavation. Fill the tail void on the back of the tunnel with backfill material, and after the excavation is completed, shrink the shield jack to form a space in which to assemble segments, etc. in the tail, and assemble the primary lining segment in front of the existing primary lining segment. By repeating this process, it is possible to construct the primary lining and secondary lining at the same time, which shortens the construction period.
From the initial stage of application of the ground load, both linings function as a composite section, making it possible to achieve an extremely economical section.
既設の一次覆工セグメント1の前部に一次覆工
セグメント2を組み立て固定しセグメンドリング
を形成する。その後一次覆工セグメント2の内側
に主鉄筋及び配力筋と配筋前後に摺動自在の妻枠
4を設けた内型枠5を、既設の内型枠6の前部に
組み立て固定するものであるが、既設の内型枠6
に対し連設する内型枠5は千鳥状に組み立て(第
8図参照)るものである。
The primary lining segment 2 is assembled and fixed to the front part of the existing primary lining segment 1 to form a segment ring. Thereafter, the inner formwork 5, which has main reinforcing bars and distribution bars inside the primary lining segment 2, and a slidable end frame 4 before and after the reinforcement is assembled and fixed to the front part of the existing inner formwork 6. However, the existing inner formwork 6
The inner formwork 5 provided in series with the inner formwork 5 is assembled in a staggered manner (see Fig. 8).
内型枠5及び6は同一構造であつてトンネルの
円周方向に4分割され、両側継手板7には隣接す
る内型枠5と連結するボルト孔8が穿たれてい
る。 The inner forms 5 and 6 have the same structure and are divided into four parts in the circumferential direction of the tunnel, and bolt holes 8 are bored in the joint plates 7 on both sides to connect with the adjacent inner forms 5.
内型枠5,6の前後面には外側は内型枠の円弧
と同一の円弧状に形成された妻枠4を摺動自在に
取り付け、内型枠の内部で作業の邪魔にならない
ところに設けたジヤツキ9にて摺動させる。内型
枠5,6の前後板10に長孔11を穿ち、前後の
長孔11に作動杆12を挿通し、作動杆12の前
後端に妻板4を固定し、ジヤツキ9のロツドを作
動杆12に枢着ジヤツキ9の作動により妻板4を
摺動させるものである。ジヤツキ9は内型枠5,
6の内側に設けた補強部材等に取り付ければよ
く、転用して用いるものである。 The end frame 4, which is formed in the same arc shape as the inner formwork on the outside, is slidably attached to the front and rear surfaces of the inner formworks 5 and 6, and is placed in a place inside the inner formwork where it will not interfere with the work. Slide it using the provided jack 9. Drill long holes 11 in the front and rear plates 10 of the inner formworks 5 and 6, insert the operating rods 12 into the front and rear elongated holes 11, fix the end plates 4 to the front and rear ends of the operating rods 12, and attach the rods of the jacks 9 to the operating rods. 12, the end plate 4 is slid by the operation of a pivoting jack 9. Jacket 9 is inner formwork 5,
It can be attached to a reinforcing member etc. provided on the inside of 6, and can be used for other purposes.
覆工材注入空間25の施工を詳細に述べれば既
設の内型枠6の前部に内型枠5を連接し、ボルト
孔17にてボルトナツトを用いて固定し、円周方
向全ての組み立てが終了したらば既設の内型枠6
の前部の妻枠4及び連結した内型枠5の後部の妻
枠4をジヤツキ9を作動しロツドを伸し妻枠4を
外方向へスライドし妻枠リングを形成すると同時
にひとつ後ろの妻枠リングを縮め、既設の内型枠
6及び既設の一次覆工セグメント1の前部を気密
に閉塞して、既設の内型枠6、既設覆工23、既
設の一次覆工セグメント1及び妻枠4にて覆工材
注入空間25を形成する。 To describe the construction of the lining material injection space 25 in detail, the inner formwork 5 is connected to the front part of the existing inner formwork 6, and is fixed using bolts and nuts through the bolt holes 17, and the entire circumferential direction is assembled. Once finished, replace the existing inner formwork 6
The front gable 4 and the rear gable 4 of the connected inner form 5 are operated by the jack 9 to extend the rod and slide the gable 4 outward to form a gable ring. The frame ring is shortened and the front parts of the existing inner formwork 6 and the existing primary lining segment 1 are closed airtight, and the existing inner formwork 6, the existing lining 23, the existing primary lining segment 1 and the gable are closed. The frame 4 forms a lining material injection space 25.
その後、覆工材注入管22より覆工材注入空間
25に覆工材を注入すると同時にシールドジヤツ
キ20を作動し、一次覆工セグメント2ら反力を
取り一工程分シールドマシン18を掘進させる。
掘進中或いは掘進完了後、一次覆工セグメント2
と地山の間に形成されるテールボイド3に裏込め
材を注入する。 Thereafter, the lining material is injected into the lining material injection space 25 from the lining material injection pipe 22, and at the same time the shield jack 20 is operated to remove the reaction force from the primary lining segment 2 and cause the shield machine 18 to dig for one step. .
During excavation or after completion of excavation, primary lining segment 2
A backfilling material is injected into the tail void 3 formed between the ground and the ground.
その後シールドジヤツキ20を作動してロツド
を一工程分縮め一次覆工セグメント2を既設一次
覆工セグメント1の前部に連結する。 Thereafter, the shield jack 20 is operated to retract the rod by one step and connect the primary lining segment 2 to the front part of the existing primary lining segment 1.
従つて前段で説明中の一次覆工セグメント2が
既設の一次覆工セグメント1に呼び名が変り、順
次この作業をくり返しシールドトンネルを施工す
るものである。 Therefore, the name of the primary lining segment 2 described in the previous section is changed to the existing primary lining segment 1, and this operation is repeated one after another to construct a shield tunnel.
妻枠4で一次覆工セグメントと内型枠の前部を
密閉する時は妻枠4の溝16に配力筋を嵌合し、
すき間はシール材でシールし覆工材の流れ止めを
行う。 When sealing the primary lining segment and the front part of the inner formwork with the end frame 4, fit the distribution bar into the groove 16 of the end frame 4,
Seal the gaps with sealing material to prevent the flow of lining material.
又一次覆工セグメントを連結組み立てた後、主
鉄筋、配力筋を配筋してもよいが、一次覆工セグ
メントとを工場にて生産する際、第2図及び第3
図に示すように配筋し現場にては組み立てるだけ
にしてもよいものである。 In addition, after connecting and assembling the primary lining segments, main reinforcing bars and distribution bars may be arranged, but when producing the primary lining segments at a factory,
It is also possible to simply arrange the reinforcement as shown in the figure and assemble it on site.
一次覆工セグメント1は内面に鉄筋吊り治具1
3を設け、主鉄筋14及び配力筋15を配筋し、
妻枠4には配力筋15の挿通用の溝16を外端部
より刻設しておくものである。 The primary lining segment 1 has a reinforcing bar hanging jig 1 on the inner surface.
3, and arrange the main reinforcing bars 14 and distribution bars 15,
A groove 16 for inserting the distribution bar 15 is cut into the end frame 4 from the outer end.
17は内型枠5,6の連結用のボルト孔、18
はシールドマシンで内部に複数のプレート19を
同一円周上に固定し、プレート19の後部にシー
ルドジヤツキ20のシリンダーを固定し、ロツド
を一次覆工セグメント1に当接できるようにす
る。 17 is a bolt hole for connecting the inner formworks 5 and 6; 18
A plurality of plates 19 are fixed on the same circumference inside by a shield machine, and a cylinder of a shield jack 20 is fixed to the rear of the plate 19, so that the rod can come into contact with the primary lining segment 1.
21はセレクター、22は覆工材注入管、23
は既設覆工材、24は内型枠のスキンプレート、
25は覆工材注入空間を示すものである。 21 is a selector, 22 is a lining material injection pipe, 23
24 is the existing lining material, 24 is the skin plate of the inner formwork,
25 indicates a lining material injection space.
一次、二次覆工の同時施工が可能であるため、
工期の短縮を図ることができる。
Because it is possible to construct the primary and secondary lining at the same time,
It is possible to shorten the construction period.
また初期の地山荷重の作用時点から、両覆工が
合成断面として機能するので、従来工法に比べて
極めて経済的な断面を実現することができる。 Furthermore, since both linings function as a composite cross section from the time when the initial ground load is applied, it is possible to realize a cross section that is extremely economical compared to conventional construction methods.
第1図はトンネルの縦断面図、第2図は一次覆
工用セグメントの正面図、第3図は第2図のa−
a矢視図、第4図は第1図のa−a矢視図、第5
図は第4図の背面図、第6図は第5図のb−b矢
視図、第7図は同c−c矢視図、第8図は内枠リ
ングの組み方を示す平面図である。
Figure 1 is a vertical cross-sectional view of the tunnel, Figure 2 is a front view of the primary lining segment, and Figure 3 is a--
Fig. 4 is a view from the a-a arrow in Fig. 1, Fig. 5
The figure is a rear view of Fig. 4, Fig. 6 is a view taken along the b-b arrow of Fig. 5, Fig. 7 is a view taken along the c-c arrow of the same, and Fig. 8 is a plan view showing how to assemble the inner frame ring. be.
Claims (1)
セグメントを組み立て固定し、既設の内型枠の前
部に既設の内型枠に対し内型枠を千鳥状に組み立
て、既設の内型枠の前部の妻枠と連結した内型枠
の後部の妻枠を外方向へスライドした後、ひとつ
後の妻枠リングを内方向へ縮め、前記拡径した妻
枠、一次覆工セグメント、既設二次覆工及び内型
枠で囲まれた覆工材注入空間に覆工材を注入し、
同時にシールドマシンを一工程分掘進し、掘進完
了後シールドジヤツキを縮めテールにセグメント
等を組み立てる空間を形成して、既設の一次覆工
セグメントの前部に一次覆工セグメントを組み立
てる作業を順次くり返し行うこと特徴とする一次
覆工を活かしたシールドトンネルの一体構築工
法。1. Assemble and fix the primary lining segment in front of the existing primary lining segment, assemble the inner formwork in a staggered manner in front of the existing inner formwork, and attach the inner formwork to the front of the existing inner formwork. After sliding the rear gable of the inner formwork connected to the front gable of the inner formwork outward, the next gable ring is contracted inward, and the expanded gable, primary lining segment, and existing Inject the lining material into the lining material injection space surrounded by the secondary lining and inner formwork,
At the same time, the shield machine is excavated for one step, and after the excavation is completed, the shield jack is retracted to form a space in the tail for assembling segments, etc., and the work of assembling the primary lining segment in front of the existing primary lining segment is repeated in sequence. An integrated construction method for shield tunnels that takes advantage of the primary lining.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP61293274A JPS63147100A (en) | 1986-12-09 | 1986-12-09 | An integrated construction method for shield tunnels that utilizes the primary lining |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP61293274A JPS63147100A (en) | 1986-12-09 | 1986-12-09 | An integrated construction method for shield tunnels that utilizes the primary lining |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63147100A JPS63147100A (en) | 1988-06-20 |
| JPH0480198B2 true JPH0480198B2 (en) | 1992-12-17 |
Family
ID=17792704
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP61293274A Granted JPS63147100A (en) | 1986-12-09 | 1986-12-09 | An integrated construction method for shield tunnels that utilizes the primary lining |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS63147100A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4855213B2 (en) * | 2006-10-24 | 2012-01-18 | アルパイン株式会社 | Speaker |
-
1986
- 1986-12-09 JP JP61293274A patent/JPS63147100A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63147100A (en) | 1988-06-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN114704272B (en) | Construction method of underground tunnel with first building and then digging | |
| US4786206A (en) | Lining tunnel wall made by shield type tunnel excavator | |
| JP3285261B2 (en) | Precast formwork for tunnel lining | |
| JP3890528B2 (en) | Tunnel construction method | |
| JPS63147100A (en) | An integrated construction method for shield tunnels that utilizes the primary lining | |
| JPH10331567A (en) | Excavating jig for sunk well | |
| JP2819224B2 (en) | Reaction force support structure for shaft excavator | |
| JP3022282B2 (en) | Assembly structure of tunnel lining members | |
| JP2005188260A (en) | How to build a shield tunnel | |
| JP3584416B2 (en) | Tunnel and its construction method | |
| JPH0194199A (en) | Method of constructing concrete lining body into ground and segment containing coarse aggregate used for said construction | |
| JPH0462299A (en) | Larger section tunnel and construction method thereof | |
| JP4392576B2 (en) | Tunnel construction method | |
| JPH0772476B2 (en) | How to build a tunnel lining | |
| JP3651970B2 (en) | Start / arrival method of branch shield machine and lining structure used therefor | |
| JPH03281898A (en) | Method for connecting shield tunnel to structure or shield tunnels each other, and device therefor | |
| JP3162348B2 (en) | Steel segment and shield tunnel excavation method for tunnel lining | |
| JPH04247200A (en) | Lining process for shielded tunnel | |
| JP4829593B2 (en) | Shield machine and shield method using the same | |
| JPH011894A (en) | In-situ lining method for shield tunnels | |
| JP3347810B2 (en) | Shield tunnel widening method and equipment | |
| JPH04277298A (en) | Primary segment for shield tunnel and working method thereof | |
| JPH05311995A (en) | Construction method of tunnel structure using bellows steel plate | |
| JPH0765465B2 (en) | Construction method of underground structure | |
| JPH0536599B2 (en) |