JPH0786229B2 - Impermeable wall using impermeable sheet, construction method thereof, and impermeable sheet used for impermeable wall - Google Patents
Impermeable wall using impermeable sheet, construction method thereof, and impermeable sheet used for impermeable wallInfo
- Publication number
- JPH0786229B2 JPH0786229B2 JP26526186A JP26526186A JPH0786229B2 JP H0786229 B2 JPH0786229 B2 JP H0786229B2 JP 26526186 A JP26526186 A JP 26526186A JP 26526186 A JP26526186 A JP 26526186A JP H0786229 B2 JPH0786229 B2 JP H0786229B2
- Authority
- JP
- Japan
- Prior art keywords
- water
- impermeable
- impermeable sheet
- male
- sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、ダム、地下タンク、産業廃棄物埋立場等の建
設事業における不透水性シートを使用した遮水壁および
その施工方法並びに遮水壁に使用する不透水性シートに
関する。DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention relates to a water-impervious wall using an impermeable sheet in a construction project such as a dam, an underground tank, an industrial waste landfill, etc. The present invention relates to an impermeable sheet used for walls.
従来、地下水流出防止や地下水涵養等のための地中遮水
壁の構築法としては、鉄筋コンクリートを使用した地中
連続壁工法が一般的であるが、この工法は高価であると
共に、周辺地盤の変形に対して追従性が無いため壁体に
応力が集中し、また、地震時にクラックが発生して漏水
する等の問題を有している。Conventionally, the underground continuous wall construction method using reinforced concrete is generally used as a method of constructing an underground water barrier for preventing groundwater runoff and groundwater recharge, but this method is expensive and Since it does not follow the deformation, stress concentrates on the wall, and there are problems such as cracks and water leakage when an earthquake occurs.
また、鉄筋コンクリートの代わりに泥水固化系材料、ベ
ントナイトコンクリート、アスファルトコンクリート等
の低強度遮水材料を用いた遮水壁の研究も行われている
が、これらの材料はコンクリートに比較すれば、変形係
数が小さく周辺地盤の変形に対して追従性が優れている
が、クラック発生の問題や、その発生したクラックが50
〜100年という耐用年数の間に透水により拡大する恐れ
があり信頼性に欠けるため、遮水性の確保のために鋼矢
板を挿入するなどの方法がとられている。しかし、地下
ダム等深部の遮水をする場合には、鋼矢板の水平繋ぎが
困難であり、挿入できたとしても相当高価なものとなる
という問題を有している。In addition, research on impermeable walls using low-strength impermeable materials such as mud solidified materials, bentonite concrete, and asphalt concrete in place of reinforced concrete is also being conducted. Is small and has excellent followability to the deformation of the surrounding ground, but the problem of cracks and the cracks
It is unreliable because it may expand due to water permeation during its useful life of ~ 100 years, so methods such as inserting steel sheet piles are used to ensure water impermeability. However, if water is to be blocked in a deep area such as an underground dam, it is difficult to horizontally connect the steel sheet piles, and even if it can be inserted, there is a problem that it is considerably expensive.
従来、上記問題を解決するために、塩化ビニル系材料、
ポリエチレン系材料、ゴム系材料等の可撓性材料からな
る不透水性シートを用いた遮水壁が提案されている。こ
れを第4図により説明すると、遮水壁は掘削溝20内に圧
入される接続金具21を有する仕切鉄板22と、隣接する仕
切鉄板22a、22bの接続金具21、22間に挟着される不透水
性シート23と、隣接する仕切鉄板22a、22b間に注入固化
される注入材料25からなる。接続金具21と不透水性シー
ト23の接続はそれぞれの雌雄の継手により行われる。Conventionally, in order to solve the above problems, vinyl chloride material,
A water barrier using a water impermeable sheet made of a flexible material such as a polyethylene material or a rubber material has been proposed. This will be explained with reference to FIG. 4. The impermeable wall is sandwiched between a partition iron plate 22 having a connection fitting 21 press-fitted into the excavation groove 20 and the connection fittings 21, 22 of the adjacent partition iron plates 22a, 22b. It is composed of a water impermeable sheet 23 and an injection material 25 which is injected and solidified between the adjacent partition iron plates 22a and 22b. The connection fitting 21 and the water impermeable sheet 23 are connected to each other by male and female joints.
その施工法について説明すると、図において前工程で仕
切鉄板22aの左側の遮水壁Aの施工完了後、泥水26が満
たされている掘削溝20内に不透水性シート23を仕切鉄板
22aの接続金具21に沿って下降させる。次いで、仕切鉄
板22bの接続金具21を不透水性シート23の端部に沿って
下降させ、隣接する仕切鉄板22a、22b間に注入材料25を
注入固化した後、接続金具21内にもグラウトを注入して
固化させ遮水壁Bを形成し、以下順次この方法を繰り返
して遮水壁を形成してゆく。The construction method will be explained. After the construction of the impermeable wall A on the left side of the partition iron plate 22a in the previous step in the figure is completed, the impermeable sheet 23 is partitioned into the excavation groove 20 filled with the mud 26.
It is lowered along the connection fitting 21 of 22a. Next, the connection fitting 21 of the partition iron plate 22b is lowered along the end of the water-impermeable sheet 23, and the injection material 25 is injected and solidified between the adjacent partition iron plates 22a and 22b, and then the grout is also inside the connection fitting 21. The water-impermeable wall B is formed by injecting and solidifying, and this method is sequentially repeated to form the water-impermeable wall.
また、第5図(a)および第5図(b)に示すように、
仕切鉄板の代わりにロッキングパイプを用いる方法も提
案されている。第5図(a)は不透水性シート23の一端
に接続金具27を挿通し、この接続金具27の雌継手に沿っ
てロッキングパイプ28の雄継手29を下降させ、注入材料
25を注入固化した後ロッキングパイプ28のみを引抜き、
以下順次この方法を繰り返し、接続金具27の継手部分内
にもグラウトを注入して固化させ遮水壁を形成する。Further, as shown in FIGS. 5 (a) and 5 (b),
A method of using a locking pipe instead of the partition iron plate has also been proposed. In FIG. 5 (a), the connecting fitting 27 is inserted into one end of the impermeable sheet 23, and the male fitting 29 of the locking pipe 28 is lowered along the female fitting of the connecting fitting 27 to inject the injected material.
After injecting and solidifying 25, pull out only the locking pipe 28,
Thereafter, this method is sequentially repeated to inject the grout into the joint portion of the connection fitting 27 and solidify it to form the impermeable wall.
また、第5図(b)は同図(a)のように不透水性シー
ト23と別体の接続金具27を用いないで、不透水性シート
23の一端に雌継手からなる接続金具30を固着し、この接
続金具30の雌継手に沿ってロッキングパイプ28に設けた
雄継手29を下降させ、注入材料25を注入固化した後ロッ
キングパイプ28のみを引抜き、以下順次この方法を繰り
返し、接続金具30の継手部分内にもグラウトを注入して
固化させ遮水壁を形成するものである。Further, FIG. 5 (b) does not use the water-impermeable sheet 23 and the separate connection fitting 27 as shown in FIG. 5 (a).
A connecting fitting 30 made of a female joint is fixed to one end of 23, the male joint 29 provided on the locking pipe 28 is lowered along the female joint of the connecting fitting 30, and the injection material 25 is injected and solidified, and then only the locking pipe 28 is provided. Then, this method is sequentially repeated to inject grout into the joint portion of the connecting fitting 30 and solidify it to form a water-impervious wall.
上記従来の不透水性シートを用いた遮水壁において、仕
切鉄板22およびロッキングパイプ28の役割は、未施工空
間に満たされている泥水内に注入材料25が混入しないよ
うにシールすることであるが、上記従来例のうち仕切鉄
板22に接続金具21を取付ける方法においては、仕切鉄板
が高価であるとともに、グラウトを注入する手間がかか
り過ぎるという問題を有している。In the impermeable wall using the conventional impermeable sheet, the role of the partition iron plate 22 and the locking pipe 28 is to seal the injection material 25 from mixing into the muddy water filled in the unconstructed space. However, the method of attaching the connecting fitting 21 to the partition iron plate 22 among the above-mentioned conventional examples has a problem that the partition iron plate is expensive and it takes too much time to inject grout.
また、ロッキングパイプ28と接続金具27、30を組合わせ
る方法においては、ロッキングパイプの挿入に手間がか
かるという問題があり、とくに第5図(a)の例におい
ては、ロッキングパイプ引抜き時に接続金具27も同時に
抜出してしまうという問題があり、また、第5図(b)
の例においては不透水性シート23と接続金具30の固着が
異種材料であるため困難であるとともに、現場接着とす
るには信頼性に欠けるという問題を有している。Further, in the method of combining the locking pipe 28 and the connecting fittings 27 and 30, there is a problem that it takes time to insert the locking pipe. Especially, in the example of FIG. 5 (a), the connecting fitting 27 is pulled out when the locking pipe is pulled out. There is also a problem that they will be removed at the same time, and Fig. 5 (b)
In the above example, it is difficult to fix the water-impermeable sheet 23 and the connection fitting 30 to each other because they are made of different materials, and there is a problem in that they are unreliable for the field bonding.
さらに、不透水性シート間の継手部分はグラウトを注入
固化しているため、経年変化により透水が生じてしまう
という問題を有している。Further, since the grout is injected and solidified in the joint portion between the impermeable sheets, there is a problem that water permeability occurs due to aging.
本発明は上記問題を解決するものであって、不透水性シ
ートにロッキングパイプの機能を付加することにより、
泥水内への注入材料の混入を遮断すると共に施工能率、
コストを向上させ、また、不透水性シート間の継手部の
シール性を向上させることができる遮水壁用不透水性シ
ート、不透水性シートを使用した遮水壁および遮水壁の
施工方法を提供することを目的とする。The present invention is to solve the above problems, by adding the function of a locking pipe to the impermeable sheet,
In addition to blocking the mixture of the injection material into the muddy water, construction efficiency,
Impermeable sheet for impermeable wall, which can improve cost and also improve sealing property of joint between impermeable sheets, impermeable wall using impermeable sheet, and construction method of impermeable wall The purpose is to provide.
そのために本発明の本発明の不透水性シートを使用した
遮水壁は、掘削溝と、該掘削孔内に挿入される不透水性
シートと、該不透水性シートの両端に設けられる雌雄の
継手と、該雌雄の継手の間で不透水性シートの両面に取
付ける折畳可能なロッキングバッグと、該ロッキングバ
ッグ内および前記掘削溝内に注入される注入材料からな
ることを特徴とし、さらに本発明の遮水壁の施工方法
は、掘削溝内に両端に雌雄の継手を有する不透水性シー
トを挿入し掘削溝内に注入材料を注入固化した後、前記
不透水性シートの雌雄の継手を順次接続することにより
遮水壁を施工する方法において、不透水性シートの雌雄
の継手の間で不透水性シートの両面に折畳まれたロッキ
ングバッグを取付け、該折畳まれたロッキングバッグ内
に注入材料を注入し前記掘削溝をシールした後、掘削溝
内に注入材料を注入することを特徴とし、さらに遮水壁
に使用する不透水性シートは、不透水性シートの両端に
雌雄の継手を設けるとともに、該不透水性シートの雌雄
の継手の間で不透水性シートの両面に折畳可能なロッキ
ングバッグを取付けたことを特徴とするものである。For that purpose, the impermeable wall using the water-impermeable sheet of the present invention is an excavation groove, a water-impermeable sheet inserted into the excavation hole, and a male and a female provided at both ends of the water-impermeable sheet. A joint, a foldable locking bag attached to both sides of the water-impermeable sheet between the male and female joints, and an injection material injected into the locking bag and the trench. The method of constructing an impermeable wall of the invention is to insert a water-impermeable sheet having male and female joints at both ends in the excavation groove and inject and solidify the injected material in the excavation groove, and then insert the male and female joints of the impermeable sheet In a method of constructing a water-impervious wall by sequentially connecting, a folding rocking bag is attached to both sides of the water-impermeable sheet between the male and female joints of the water-impermeable sheet, and the folded rocking bag is attached. Inject material After sealing the excavation groove, a feature of injecting an injection material into the excavation groove, further the water-impermeable sheet used for the impermeable wall, with the male and female joints provided at both ends of the water-impermeable sheet, It is characterized in that a foldable locking bag is attached to both sides of the water-impermeable sheet between the male and female joints of the water-impermeable sheet.
本発明においては、例えば第2図および第3図に示すよ
うに、不透水性シート6のロッキングバッグ7、7に、
その中に低強度遮水材料8が注入されると、図示点線の
如く膨らみ掘削溝9内をシールし、注入材料が泥水10内
に混入するのを遮断するため、従来の仕切鉄板或いはロ
ッキングパイプの役割を果たすことになる。また、隣接
するシート1、1′の継手部は吸水性膨張部材5が吸水
膨張するため、止水性を完全なものとすることができ
る。In the present invention, for example, as shown in FIGS. 2 and 3, the locking bags 7, 7 of the water impermeable sheet 6 are
When the low-strength water-impervious material 8 is injected into it, it expands as shown by the dotted line to seal the inside of the excavation groove 9 and to prevent the injected material from mixing into the muddy water 10. Will play the role of. Further, since the water-absorptive expansion member 5 absorbs water and expands at the joint portions of the adjacent sheets 1 and 1 ', the water-stopping property can be perfect.
以下、本発明の実施例について図面を参照しつつ説明す
る。Hereinafter, embodiments of the present invention will be described with reference to the drawings.
第1図は本発明の遮水壁の施工方法の1実施例を示す施
工順序を説明するための図、第2図は本発明の遮水壁用
不透水性シートの1実施例を示す断面図、第3図は遮水
壁用不透水性シートの作用を説明するための図である。
図において、1、1′は不透水性シート、2は雄継手、
3は雌継手、5は吸水性膨張材料、6は不透水性シー
ト、7はロッキングバッグ、8、11は注入材料、9は掘
削溝、10は泥水を示す。FIG. 1 is a view for explaining a construction sequence showing one embodiment of a method of constructing a water-impervious wall of the present invention, and FIG. 2 is a cross section showing one embodiment of an impermeable sheet for water-impervious wall of the present invention. FIG. 3 and FIG. 3 are views for explaining the action of the water-impermeable sheet impermeable sheet.
In the figure, 1 and 1'are water-impermeable sheets, 2 are male joints,
3 is a female joint, 5 is a water-absorbent expansion material, 6 is a water impermeable sheet, 7 is a locking bag, 8 and 11 are injection materials, 9 is a digging groove, and 10 is muddy water.
第2図において、不透水性シート1、1′は、塩化ビニ
ル系材料、ポリエチレン系材料、ゴム系材料、薄板鋼板
等の可撓性材料から製造され、不透水性シート1、1′
の一端に雄継手2が、他端に雌継手3が設けられ、雌継
手3内にゴム等からなる吸水性膨張部材5が配設されて
いる。これら雌雄の継手2、3は不透水性シート1、
1′と同一種類の材料で固着される。この不透水性シー
ト1、1′同士の接続は、例えばシート1の雄継手2の
上方にシート1′の雌継手3を合致させ、シート1′を
下降させることにより行われ、シート1、1′の継手部
は吸水性膨張部材5が吸水膨張し止水性を完全なものと
することができる。In FIG. 2, the water-impermeable sheets 1, 1'are made of a flexible material such as vinyl chloride-based material, polyethylene-based material, rubber-based material, thin steel plate, etc.
A male joint 2 is provided at one end and a female joint 3 is provided at the other end, and a water-absorption expansion member 5 made of rubber or the like is provided in the female joint 3. These male and female joints 2 and 3 are impermeable sheets 1,
It is fixed with the same type of material as 1 '. The impermeable sheets 1, 1'are connected to each other by, for example, aligning the female joint 3 of the sheet 1'above the male joint 2 of the sheet 1 and lowering the sheet 1 '. In the joint portion of ′, the water absorbing expansion member 5 absorbs water and expands, so that the water stopping property can be completed.
不透水性シート1は上記した両端に前記雄継手2および
雌継手3のみが設けられたシートと、第3図に示すよう
に雄継手2と雌継手3の間でシート1の両側にロッキン
グバッグ7、7を固着したシート6が用意される。この
ロッキングバッグ7、7は、その中にモルタル等の低強
度遮水材料8が注入されると、図示点線の如く膨らみ掘
削溝9をシールし、注入材料が泥水10内に混入するのを
遮断するため、従来の仕切鉄板板或いはロッキングパイ
プの役割を果たすことになる。The water-impermeable sheet 1 is a sheet in which only the male joint 2 and the female joint 3 are provided on both ends, and a locking bag on both sides of the seat 1 between the male joint 2 and the female joint 3 as shown in FIG. A sheet 6 to which 7 and 7 are fixed is prepared. When the low-strength water-blocking material 8 such as mortar is injected into the locking bags 7, 7, the rocking bags 7 and 7 expand as shown by the dotted line in the drawing to seal the excavation groove 9 and prevent the injected material from mixing into the muddy water 10. Therefore, it plays a role of a conventional partition iron plate or a locking pipe.
次に、本発明の遮水壁の施工方法の1実施例を第1図に
より説明すると、先ずロングウォールドリル機、グラブ
等により1サイクル分の掘削溝9を掘削し()、次い
で泥水10が満たされた掘削溝9内に、不透水性シート1
を挿入しこのシート1の雄継手2の上方にロッキングバ
ッグ7を有する不透水性シート6の雌継手3を合致さ
せ、シート6を挿入する()、なお、不透水性シート
はクレーンにより吊下げながら挿入してもよいし、ロー
ル状に巻いた不透水性シートを回転させながら挿入する
ようにしてもよい。このときロッキングバッグ7は折畳
まれた状態にある。次に、ロッキングバッグ7内に注入
材料8を注入し()、図示点線の如くロッキングバッ
グ7を膨らませ掘削溝9をシールした後、ロッキングバ
ッグ7を仕切りとした空間A間に注入材料11を注入して
固化させるか又は泥水10を原位置で固化させる()。
空間Aに遮水壁が形成されると、次のサイクル分を掘削
し()、上記〜の作業を順次くりかえすことによ
り遮水壁を施工するものである。Next, one embodiment of the method of constructing the impermeable wall of the present invention will be described with reference to FIG. 1. First, the excavation groove 9 for one cycle is excavated by a long wall drill machine, a grab, etc. In the filled excavation trench 9, the impermeable sheet 1
And the female joint 3 of the impermeable sheet 6 having the locking bag 7 above the male joint 2 of the sheet 1 is inserted, and the sheet 6 is inserted (). The impermeable sheet is hung by a crane. The water-impermeable sheet wound in a roll may be inserted while rotating. At this time, the locking bag 7 is in a folded state. Next, the injection material 8 is injected into the locking bag 7 (), the locking bag 7 is inflated as shown by the dotted line in the figure to seal the excavation groove 9, and then the injection material 11 is injected into the space A partitioned by the locking bag 7. To solidify or muddy water 10 in situ ().
When the impermeable wall is formed in the space A, the impermeable wall is constructed by excavating for the next cycle () and repeating the above-mentioned operations in sequence.
なお、本発明は上記実施例に限定されるものではなく種
々の変更が可能である。The present invention is not limited to the above embodiment, and various modifications can be made.
例えば上記実施例においては、両端に前記雄継手2およ
び雌継手3のみが設けられたシート1と、雄継手2と雌
継手3の間でシート1の両側にロッキングバッグ7、7
を固着したシート6とを交互に接続しているが、ロッキ
ングバッグ7を有するシート6のみを接続することによ
り遮水壁を形成してもよい。For example, in the above-mentioned embodiment, the seat 1 provided with only the male joint 2 and the female joint 3 on both ends, and the locking bags 7, 7 on both sides of the seat 1 between the male joint 2 and the female joint 3.
Although the sheets 6 to which is fixed are alternately connected, the water impermeable wall may be formed by connecting only the sheet 6 having the locking bag 7.
また、上記実施例においては、不透水性シートと注入材
料により遮水壁を形成しているが、不透水性シートの片
側あるいは両側に鉄筋を配設し、モルタルまたはコンク
リートを注入することにより、遮水壁を施工し遮水壁に
構造壁の機能を持たせてもよい。Further, in the above embodiment, the impermeable wall is formed by the impermeable sheet and the injection material, but the reinforcing bars are arranged on one side or both sides of the impermeable sheet, and by injecting mortar or concrete, The impermeable wall may be constructed so that it has the function of a structural wall.
さらに、上記実施例においては、雌雄の継手2、3は不
透水性シート1、1′と同一種類の材料で固着している
が、雌雄の継手の一部に鉄筋、ワイヤーメッシュ等の剛
性材料を付加するようにしてもよい。この場合には可撓
性材料からなる不透水性シート同士の接続を容易に行う
ことが可能となる。Further, in the above-mentioned embodiment, the male and female joints 2 and 3 are fixed by the same kind of material as the water impermeable sheets 1 and 1 ', but a part of the male and female joints is made of a rigid material such as a reinforcing bar and a wire mesh. May be added. In this case, the impermeable sheets made of a flexible material can be easily connected to each other.
以上説明したように本発明によれば、不透水性シートに
仕切機能を付加することにより簡単な構成で泥水内への
注入材の混入を遮断し、従来の仕切鉄板、ロッキングパ
イプを不用とするため、施工能率を向上させるととも
に、コストを低減させることができる。As described above, according to the present invention, the partitioning function is added to the impermeable sheet to prevent the injection material from entering the muddy water with a simple structure, thereby eliminating the conventional partition iron plate and the locking pipe. Therefore, the construction efficiency can be improved and the cost can be reduced.
また、不透水性シートには予め継手を取付けることがで
きるため、製品の信頼性を高めることができるととも
に、不透水性シートと継手が同一材料で形成されるた
め、簡単に強固な固着が可能となる。In addition, since the joint can be attached to the impermeable sheet in advance, the reliability of the product can be improved, and since the impermeable sheet and the joint are made of the same material, it is possible to easily and firmly fix them. Becomes
さらに、不透水性シートの継手部分には吸水性膨張部材
を使用してシート間の継手の止水を行うため、継手部の
シール性を向上させることができると共に、従来行って
いた継手部のグラウト注入が不用となり、施工能率をさ
らに向上させることができる。Furthermore, since the water-absorptive expansion member is used for the joint portion of the water-impermeable sheet to stop the joint water between the sheets, it is possible to improve the sealability of the joint portion, and at the The grout injection becomes unnecessary, and the construction efficiency can be further improved.
第1図は本発明の遮水壁の施工方法の1実施例を示す施
工順序を説明するための図、第2図は本発明の遮水壁用
不透水性シートの1実施例を示す断面図、第3図は遮水
壁用不透水性シートの作用を説明するための図、第4図
および第5図(a)、同図(b)は従来の遮水壁の施工
方法を説明するための図である。 1、1′…不透水性シート、2…雄継手、3…雌継手、
5…吸水性膨張部材、6…不透水性シート、7…ロッキ
ングバッグ、8、11…注入材料、9…掘削溝、10…泥
水。FIG. 1 is a view for explaining a construction sequence showing one embodiment of a method of constructing a water-impervious wall of the present invention, and FIG. 2 is a cross section showing one embodiment of an impermeable sheet for water-impervious wall of the present invention. Fig. 3 is a diagram for explaining the action of the impermeable sheet for impermeable walls, and Fig. 4 and Fig. 5 (a) and Fig. (B) are conventional construction methods for impermeable walls. FIG. 1, 1 '... Impermeable sheet, 2 ... Male joint, 3 ... Female joint,
5 ... Water-absorbent expansion member, 6 ... Impermeable sheet, 7 ... Rocking bag, 8, 11 ... Injection material, 9 ... Excavation groove, 10 ... Muddy water.
Claims (6)
性シートと、該不透水性シートの両端に設けられる雌雄
の継手と、該雌雄の継手の間で不透水性シートの両面に
取付ける折畳可能なロッキングバッグと、該ロッキング
バッグ内および前記掘削溝内に注入される注入材料から
なることを特徴とする不透水性シートを使用した遮水
壁。1. A digging groove, a water impermeable sheet inserted into the digging groove, a male and female joint provided at both ends of the impermeable sheet, and a water impermeable sheet between the male and female joints. A water-impermeable wall using a water-impermeable sheet, comprising a foldable locking bag attached to both sides and an injection material injected into the locking bag and the excavation groove.
水性シートを挿入し掘削溝内に注入材料を注入固化した
後、前記不透水性シートの雌雄の継手を順次接続するこ
とにより遮水壁を施工する方法において、不透水性シー
トの雌雄の継手の間で不透水性シートの両面に折畳まれ
たロッキングバッグを取付け、該折畳まれたロッキング
バッグ内に注入材料を注入し前記掘削溝をシールした
後、掘削溝内に注入材料を注入することを特徴とする遮
水壁の施工方法。2. A water-impermeable sheet having male and female joints at both ends is inserted into the excavation groove, an injection material is injected and solidified in the excavation groove, and then the male and female joints of the impermeable sheet are sequentially connected. In a method of constructing an impermeable wall, a folding locking bag is attached to both sides of the impermeable sheet between the male and female joints of the impermeable sheet, and the injection material is injected into the folded locking bag. A method of constructing an impermeable wall, comprising injecting an injection material into the excavation groove after sealing the excavation groove.
のみを有する不透水性シートと、雌雄の継手の間で不透
水性シートの両面に折畳まれたロッキングバッグを取付
けた不透水性シートからなることを特徴とする特許請求
の範囲第2項記載の遮水壁の施工方法。3. The water-impermeable sheet, wherein the water-impermeable sheet has only male and female joints at both ends, and a rocking bag folded on both sides of the water-impermeable sheet between the male and female joints. The method for constructing an impermeable wall according to claim 2, characterized in that it comprises a water-permeable sheet.
るとともに、該不透水性シートの雌雄の継手の間で不透
水性シートの両面に折畳可能なロッキングバッグを取付
けたことを特徴とする遮水壁に使用する不透水性シー
ト。4. A male and female joint is provided at both ends of the water-impermeable sheet, and foldable locking bags are attached to both sides of the water-impermeable sheet between the male and female joints of the water-impermeable sheet. Impermeable sheet used for impermeable walls.
一材料からなることを特徴とする特許請求の範囲第4項
記載の遮水壁に使用する不透水性シート。5. The water-impermeable sheet used for a water-impervious wall according to claim 4, wherein the water-impermeable sheet and the male / female joint are made of the same material.
ことを特徴とする特許請求の範囲第4項または第5項記
載の遮水壁に使用する不透水性シート。6. A water impermeable sheet for use in a water impermeable wall according to claim 4 or 5, characterized in that a water absorbing expansion member is arranged in the female joint.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP26526186A JPH0786229B2 (en) | 1986-11-07 | 1986-11-07 | Impermeable wall using impermeable sheet, construction method thereof, and impermeable sheet used for impermeable wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP26526186A JPH0786229B2 (en) | 1986-11-07 | 1986-11-07 | Impermeable wall using impermeable sheet, construction method thereof, and impermeable sheet used for impermeable wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63122817A JPS63122817A (en) | 1988-05-26 |
| JPH0786229B2 true JPH0786229B2 (en) | 1995-09-20 |
Family
ID=17414772
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP26526186A Expired - Lifetime JPH0786229B2 (en) | 1986-11-07 | 1986-11-07 | Impermeable wall using impermeable sheet, construction method thereof, and impermeable sheet used for impermeable wall |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0786229B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4643471B2 (en) * | 2006-02-28 | 2011-03-02 | 株式会社間組 | Steel underground wall |
| JP4771157B2 (en) * | 2006-06-20 | 2011-09-14 | 清水建設株式会社 | Impermeable sheet construction apparatus and impermeable sheet construction method |
| CO6330166A1 (en) * | 2011-06-22 | 2011-10-20 | Figueroa Pablo Poch | PROCEDURE FOR REINFORCEMENT AND REGULATION OF THE FILTRATIONS OF THE JARILLONES OF THE LAGOON AND LAKE RIVERS |
-
1986
- 1986-11-07 JP JP26526186A patent/JPH0786229B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63122817A (en) | 1988-05-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4741644A (en) | Environmental cut-off and drain | |
| EP0135584B1 (en) | Environmental cut-off for deep excavations | |
| US5106233A (en) | Hazardous waste containment system | |
| US5240348A (en) | Methods of hazardous waste containment | |
| JP4088871B2 (en) | Impermeable wall structure and impermeable wall structure using the impermeable wall | |
| JP3194192B2 (en) | Open shield method | |
| JPS5936058B2 (en) | How to construct a structure using underground continuous walls | |
| JP2832650B2 (en) | Construction method of water stop wall | |
| JPS63122817A (en) | Impermeable walls using impermeable sheets, their construction methods, and impermeable sheets used for impermeable walls | |
| JP2001032265A (en) | Steel pipe sheet pile continuous wall method | |
| JP3355282B2 (en) | Construction method of perforated sheet pile and continuous underground wall having permeation section using this sheet pile | |
| JPH0617421A (en) | Construction method of continuous underground water stop wall | |
| JPS63304821A (en) | Construction work of underground continuous cut-off wall | |
| JP3098458B2 (en) | Construction method of multi-functional underground diaphragm wall | |
| JP3114093B2 (en) | Concrete box used for open shield method | |
| JP2852709B2 (en) | Construction method of water stop wall | |
| JP3509066B2 (en) | Pipe burial method | |
| JP3023236B2 (en) | How to construct a suspended water wall | |
| JPH0442496B2 (en) | ||
| JPS63522A (en) | Underground continuous wall | |
| JPH07259078A (en) | Construction method of steel material for shield opening and underground continuous wall, and mirror opening method of vertical shaft | |
| JPH01190819A (en) | Method for constructing under-ground continuous impervious wall | |
| JP2829805B2 (en) | How to build a continuous underground water barrier | |
| JPS60250119A (en) | Construction method of underground concrete pipe structure | |
| JPH07305347A (en) | Water stop wall and construction method |