JPH083614Y2 - Gravestone basics - Google Patents
Gravestone basicsInfo
- Publication number
- JPH083614Y2 JPH083614Y2 JP1990084262U JP8426290U JPH083614Y2 JP H083614 Y2 JPH083614 Y2 JP H083614Y2 JP 1990084262 U JP1990084262 U JP 1990084262U JP 8426290 U JP8426290 U JP 8426290U JP H083614 Y2 JPH083614 Y2 JP H083614Y2
- Authority
- JP
- Japan
- Prior art keywords
- foundation
- gravestone
- present
- stone
- basics
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Road Signs Or Road Markings (AREA)
- Walking Sticks, Umbrellas, And Fans (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
【考案の詳細な説明】 〔産業上の利用分野〕 本考案は遺骨を葬る墓標の基礎に関するものである。[Detailed Description of the Invention] [Industrial field of application] The present invention relates to the foundation of a grave marker for burial of remains.
従来の墓標の基礎は、第3図に示す様に中央に骨つぼ
収容部(A)を残し、4枚の石を合わせて形成するか、
或は現場で型枠を形成し、コンクリートを流し込み基礎
を形成していた。The foundation of the conventional grave marker is formed by combining four stones, leaving the urn container (A) in the center as shown in FIG.
Alternatively, a formwork was formed on site and concrete was poured to form a foundation.
従来の石を合わせた基礎やコンクリート使用の基礎
は、地震或は地盤の沈下等、基礎下に異常が生じ基礎と
共に墓標が傾くと、基礎上の墓石を総て取り除き補修し
なければならなかったのである。Conventional foundations with stones and concrete foundations had to be repaired by removing all gravestones on the foundation when an abnormality occurred under the foundation such as an earthquake or ground subsidence and the gravestone tilted with the foundation. Of.
即ち、石を合わせた基礎では各石をそれぞれ平坦に直
さなければならなく、墓石を載せたままでは殆ど不可能
である。In other words, each stone must be flattened on the basis of the combined stones, and it is almost impossible to carry the tombstones.
又、コンクリート使用の基礎ではひび割れが生じ易
く、墓石を取り除きコンクリート打ちをやり直さなけれ
ばならないのである。In addition, cracks are likely to occur in the foundation using concrete, and it is necessary to remove the tombstone and re-cast concrete.
上記点に鑑み、本考案は地盤に異常が生じ、基礎と共
に墓標が傾いた場合でも、墓石を取り除くことなく基礎
を即是正することのできる墓標の基礎を提供せんとする
ものである。In view of the above point, the present invention is to provide a foundation of a gravestone that can immediately correct the foundation without removing the gravestone even when the ground is abnormal and the gravestone is tilted together with the foundation.
上記目的を達成するため本考案墓標の基礎は、基礎を
一枚石で形成したことを特徴とするものである。In order to achieve the above object, the foundation of the tombstone of the present invention is characterized in that the foundation is made of a monolith.
〔作用〕 次に、本考案墓標の基礎の作用を述べるに、本考案は
墓標の基礎を一枚石で形成したため、地盤地下等地盤に
異常が生じ、基礎が傾くことにより墓標全体が傾いた場
合、基礎下と地盤間に石を挟めば基礎が一枚石であるか
ら、一挙に全体が是正される。したがって、従来の数枚
の石を合わせたもののように、各石をそれぞれ是正する
必要がないものである。[Operation] Next, to describe the operation of the foundation of the tombstone of the present invention, since the foundation of the tombstone of the present invention is formed of a single stone, an abnormality occurs in the ground, such as underground, and the foundation is inclined and the entire tombstone is inclined. In this case, if you put a stone between the bottom of the foundation and the ground, the foundation is a monolith, and the whole is corrected at once. Therefore, it is not necessary to correct each stone, unlike the conventional combination of several stones.
以下、本考案墓標の基礎の実施例を図面に基づき説明
すれば、第1図は本考案墓標の基礎の平面図、第2図は
同上の使用状態を示した正面図、第3図は従来の墓標の
基礎の平面図を示すものである。An embodiment of the foundation of the gravestone of the present invention will be described below with reference to the drawings. FIG. 1 is a plan view of the foundation of the gravemark of the present invention, FIG. 2 is a front view showing the same usage state, and FIG. It is a top view of the foundation of the grave marker.
而して、図中(1)は一枚石より成る基礎であり、中
央に骨つぼ収容孔(2)が穿設されている。Thus, (1) in the figure is a foundation made of monolithic stone, and a crus accommodating hole (2) is formed in the center.
(3)は土台、(4)は中台、(5)は花立て、
(6)は上台、(7)は竿石である。(3) is the base, (4) is the middle platform, (5) is a flower stand,
(6) is an upper stand, and (7) is a rod stone.
本考案によれば、基礎下の地盤に異常が生じ、基礎が
傾くことにより墓標が傾いても、基礎上の墓石を取り除
くことなく基礎を簡単に是正できるため、従来の数枚の
石を組み合わせたものの如く、墓石を取り除き各石をそ
れぞれ是正する手間が省けたものである。According to the present invention, even if an abnormality occurs in the ground beneath the foundation and the gravestone tilts due to the foundation tilting, the foundation can be easily corrected without removing the gravestone on the foundation, so that several conventional stones are combined. Like the ones, it eliminates the need to remove the tombstones and correct each stone individually.
又、一枚石であるから強固で、コンクリート使用の基
礎の如くひび割れもなく、現場でのコンクリート打ち直
し等の作業も必要がなくなったものである。Moreover, since it is a monolithic stone, it is strong, does not crack like a foundation using concrete, and does not require work such as re-casting concrete on site.
第1図は本考案墓標の基礎の実施例を示した平面図、第
2図は同上の使用状態を示した正面図、第3図は従来例
を示した平面図である。 符号 (1)は基礎FIG. 1 is a plan view showing an embodiment of the foundation of the tombstone of the present invention, FIG. 2 is a front view showing the usage state of the same, and FIG. 3 is a plan view showing a conventional example. The code (1) is the basic
Claims (1)
とする墓標の基礎。1. A foundation for a grave marker, characterized in that the foundation (1) is formed of a monolith.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1990084262U JPH083614Y2 (en) | 1990-08-08 | 1990-08-08 | Gravestone basics |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1990084262U JPH083614Y2 (en) | 1990-08-08 | 1990-08-08 | Gravestone basics |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0441058U JPH0441058U (en) | 1992-04-07 |
| JPH083614Y2 true JPH083614Y2 (en) | 1996-01-31 |
Family
ID=31632603
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1990084262U Expired - Lifetime JPH083614Y2 (en) | 1990-08-08 | 1990-08-08 | Gravestone basics |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH083614Y2 (en) |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5879660U (en) * | 1981-11-26 | 1983-05-30 | アサヒ術衛株式会社 | ceramic tombstone |
| JPH0260164U (en) * | 1988-10-25 | 1990-05-02 |
-
1990
- 1990-08-08 JP JP1990084262U patent/JPH083614Y2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0441058U (en) | 1992-04-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3002292U (en) | Osseous room | |
| JPH08218409A (en) | Building structure maintenance method and building structure maintenance device | |
| JPH0469270B2 (en) | ||
| JP7330410B1 (en) | tombstone | |
| JP2879426B2 (en) | Underground recharge structure | |
| JPH03262833A (en) | Construction of underground floor | |
| JPH1037531A (en) | Construction method of tombstones | |
| JP3638680B2 (en) | Wall tomb | |
| JP2955577B2 (en) | Tombstone | |
| JP2975297B2 (en) | Casting block for construction work and steel tower temporary construction method using this block | |
| JPS6192265A (en) | Root wrapping method for steel column legs | |
| JPH0512357Y2 (en) | ||
| JPS6290445A (en) | Block for foundation and its manufacture | |
| JPH0350202Y2 (en) | ||
| JP3025214B2 (en) | Concrete fence | |
| JPH0249314Y2 (en) | ||
| JP3055381U (en) | Double-layered osseous chamber structure in a tomb | |
| JP2891079B2 (en) | Underground burial pond | |
| JP3020262U (en) | Seismic isolation outer fence for graves | |
| SU1622520A1 (en) | Precast block | |
| JPH05485B2 (en) | ||
| JPH077385Y2 (en) | Civil engineering and building foundation blocks | |
| JP3806414B2 (en) | Tombstone slope repair method | |
| US25944A (en) | Farm-fence | |
| JP2586468Y2 (en) | Building foundation |