JPH10113003A - 代掻整地装置 - Google Patents
代掻整地装置Info
- Publication number
- JPH10113003A JPH10113003A JP29332296A JP29332296A JPH10113003A JP H10113003 A JPH10113003 A JP H10113003A JP 29332296 A JP29332296 A JP 29332296A JP 29332296 A JP29332296 A JP 29332296A JP H10113003 A JPH10113003 A JP H10113003A
- Authority
- JP
- Japan
- Prior art keywords
- plate
- engaging
- grading
- pin
- swing link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000002689 soil Substances 0.000 title abstract 5
- 239000000463 material Substances 0.000 description 7
- 238000007790 scraping Methods 0.000 description 3
- 210000000078 claw Anatomy 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000002788 crimping Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 238000006748 scratching Methods 0.000 description 1
- 230000002393 scratching effect Effects 0.000 description 1
- 239000010902 straw Substances 0.000 description 1
Landscapes
- Soil Working Implements (AREA)
Abstract
砕土体後方に延設する回動自在の整地板を有する代掻整
地装置の固定切換装置をシンプルな構成とする。 【構成】 入力ミッションを支承する機枠で、砕土体を
支持するとともに砕土体後方に延設する回動自在の整地
板を有する代掻整地装置であること。入力ミッション後
方に揺動自在に設けた揺動リンクと整地板に連結する補
助ロッドと揺動リンクの前端に係合ピンを設けたこと。
入力ミッション上部に設けた支持部材に操作レバーを設
けて、操作レバーに連動する係合板を配置する。係合板
は揺動リンクの先端の係合ピンと係合離脱して、凸部の
土の移動の為の固定、代掻作業時のフリー状態、及び移
動時の整地板のハイリフト位置固定をする構成である。
Description
とともに砕土体後方に延設する回動自在の整地板を有す
る代掻整地装置の固定切換操作の改良に関する。
作としては、実公昭63−12644号が提案されてい
る。この従来の代掻整地装置の構成は、「機枠で砕土体
を支持するとともに砕土体後方に延設する回動自在の整
地板を有する代掻整地装置において、機枠に回動自在に
連結する中間リンク及び整地板に連結する補助ロッド
と、補助ロッドに一端を連結し前後方向に摺動自在の作
動杆と、機枠上部で機枠を挟持して突設する支持板と、
支持板間に軸支するとともに作動杆が貫通する摺動駒
と、作動杆の端部外周に形成するストップ材と支持板に
軸支する断面略L字型の係合金とからなり、係合金のL
字の長辺はストップ材下面から作動杆頭部までの長さよ
り長く、作動杆の前後方向への摺動可能距離は係合金の
L字の長辺より長いことを特徴とする代掻整地装置。」
である。
「機枠に回動自在に連結する中間リンク及び整地板に連
結する補助ロッドと、補助ロッドに一端を連結し前後方
向に摺動自在の作動杆と機枠上部で機枠を挟持して突設
する支持板と、支持板間に軸支するとともに作動杆が貫
通する摺動駒と、」と有しており、複雑で大掛かりな整
地板の固定切換装置となっている。従って、長時間の使
用においてはガタツキも増長して動作も緩慢になる欠点
があった。
ために、入力ミッションを支承する機枠で砕土体を支持
するとともに砕土体後方に延設する回動自在の整地板を
有する代掻整地装置において、前記入力ミッション後方
に揺動自在に設けた揺動リンクと、整地板に連結する補
助ロッドと、揺動リンクの後端と補助ロッドの上部と連
結し、この揺動リンクの前端に係合ピンを設けるととも
に、入力ミッション上部に設けた支持材に操作レバーを
設け、この操作レバーに連動する係合凹部と凸部を有す
る係合板を配置し、この係合板と前記係合ピンとが、係
合・離脱可能に構成したことを特徴とした代掻装置を提
供したものである。
揺動リンクの係合ピンをフリーにすると整地板は泥土面
に沿って均平化作業をする。水田の凸部の泥土を凹部に
移送する時は、操作レバーを上方に起して係合板の凹部
へ貫入させると揺動リンクはロックされて整地板は固定
されて泥土の移送に適する。又、圃場間の移動時におい
ては整地板の地上高を高めるために係合板の凸部によっ
て揺動リンクの係合ピンを押し下げると補助ロッドを上
昇させて整地板はリフトした状態で固定される。
する。図1、図2、図3は本発明を実施した側面断面図
であり、図1は整地板を固定した状態図、図2は整地板
がフリーな状態の側面断面図、図3は整地板が持ち上げ
られた状態の側面断面図である。図4、図5は要部の平
面図で、図5は特に平面断面図である。図6は係合板の
説明図を示したものである。
入力軸3を有して、左右にパイプフレーム1を配置して
機枠を兼用し、左右端で砕土体6を回動可能に支承して
いる。砕土体6は主軸5の周囲に適宜に砕土爪7を装着
して構成される。4はカバーで砕土体6の上部を被覆し
てなる。
ション2の上部に設けられて、チャンネルを逆さ状に取
り付けて、整地板8の固定切換装置25を内装してい
る。操作レバー13は第1ピン18によって前後に揺動
自在に設けられ14の連結バーを前後に移動させる。
前後に揺動自在で、支持材12の外方に設けたコイルバ
ネ11によって弾着され、第2ピン19を支点越えとし
て前後の位置に圧着安定される。この係合板15は下部
に係合部を形成して上端は前記連結バー14の後方と連
結される。
して揺動自在に設け、先端には前記した係合板15に係
合するように、係合ピン21を突出して設け、後端は補
助ロッド17に連結される。
インを突出させ、下端にゴム板10を装備してなる。2
2は横ピンを示し、整地板8をカバー4の後部に回動自
在に取り付けるものである。整地板8の中央上面に補助
ロッド17を設け、補助ロッド17の上端は前記した揺
動リンク16の後端と回動自在に取り付けられている。
ピン19を支点として14の連結バーによって前後に回
動する係合板15の下部には23の凸部、24の凹部を
形成してなる。図6の状態では揺動リンク16の先端の
係合ピン21が係合板15の凹部に貫入しており、揺動
リンク16は固定状態を示しており、整地板8は固定さ
れている。
合板15の中途位置で揺動自在であり、代掻作業に適す
る状態である。
合板15の凸部23に押し下げられて補助ロッド17を
吊り上げて、整地板8を高い位置に固定するので地上高
が有利になる。
は支持部材12に被覆されている。図5は支持部材12
を断面とした説明図である。
な構成で小型に製作でき、長時間の使用においても正確
な動作をする等の実益がある。
した状態図
Claims (1)
- 【請求項1】 入力ミッションを支承する機枠で砕土体
を支持するとともに砕土体後方に延設する回動自在の整
地板を有する代掻整地装置において、前記入力ミッショ
ン後方に揺動自在に設けた揺動リンクと、整地板に連結
する補助ロッドと、揺動リンクの後端と補助ロッドの上
部と連結し、この揺動リンクの前端に係合ピンを設ける
とともに、入力ミッション上部に設けた支持材に操作レ
バーを設け、この操作レバーに連動する係合凹部と凸部
を有する係合板を配置し、この係合板と前記係合ピンと
が、係合・離脱可能に構成したことを特徴とした代掻装
置。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP29332296A JP3658475B2 (ja) | 1996-10-14 | 1996-10-14 | 代掻整地装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP29332296A JP3658475B2 (ja) | 1996-10-14 | 1996-10-14 | 代掻整地装置 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10113003A true JPH10113003A (ja) | 1998-05-06 |
| JP3658475B2 JP3658475B2 (ja) | 2005-06-08 |
Family
ID=17793340
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP29332296A Expired - Lifetime JP3658475B2 (ja) | 1996-10-14 | 1996-10-14 | 代掻整地装置 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3658475B2 (ja) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118655053A (zh) * | 2024-08-12 | 2024-09-17 | 合肥水泥研究设计院有限公司 | 一种水泥粗细程度检测装置 |
-
1996
- 1996-10-14 JP JP29332296A patent/JP3658475B2/ja not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118655053A (zh) * | 2024-08-12 | 2024-09-17 | 合肥水泥研究设计院有限公司 | 一种水泥粗细程度检测装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3658475B2 (ja) | 2005-06-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3658475B2 (ja) | 代掻整地装置 | |
| JP3884654B2 (ja) | ロータリ耕耘装置 | |
| JPH0522002Y2 (ja) | ||
| JP4233951B2 (ja) | ロータリ耕耘装置におけるフロントカバーの取付構造 | |
| JPH06284802A (ja) | 補助リアカバー取付構造 | |
| JPH10164905A (ja) | トラクタのヒッチ機構 | |
| JP3707190B2 (ja) | ロータリ耕耘具 | |
| JPH08266102A (ja) | 耕耘装置のリヤカバー構造 | |
| CA2298923A1 (en) | Spring trip standard with positive stop | |
| US4274652A (en) | Structure for attaching an implement to an offset-type tractor | |
| JP2578666B2 (ja) | 水田作業機のフロート構造 | |
| JP3005601B2 (ja) | 圃場整地機 | |
| JPH0433688Y2 (ja) | ||
| JP2820343B2 (ja) | 双用犂連結装置 | |
| JP2004290085A (ja) | 代掻き装置 | |
| JPH0928118A (ja) | 耕耘同時移植機の整地板 | |
| JP2820344B2 (ja) | 双用犂連結装置 | |
| JP3005602B2 (ja) | 圃場整地機 | |
| JPH064649Y2 (ja) | ロ−タリ−耕耘機のリヤカバ−装置 | |
| JPS6125611Y2 (ja) | ||
| JPH05211801A (ja) | 双用犂連結装置 | |
| JPH08172810A (ja) | 作業機の尾輪フローティング装置 | |
| JP2001095304A (ja) | ロータリ耕耘具のリヤカバー吊持装置 | |
| JPH0735529Y2 (ja) | ロータリ耕耘装置の尾輪フローティング装置 | |
| JPS6312644Y2 (ja) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20030922 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20040823 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040831 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20041022 |
|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20041022 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050215 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050314 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090318 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090318 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100318 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100318 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110318 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120318 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130318 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130318 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140318 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |