|
US7434619B2
(en)
|
2001-02-05 |
2008-10-14 |
Schlumberger Technology Corporation |
Optimization of reservoir, well and surface network systems
|
|
MXPA05005466A
(es)
*
|
2002-11-23 |
2006-02-22 |
Schlumberger Technology Corp |
Metodo y sistema para simulaciones integradas de redes de instalaciones en depositos y en superficie.
|
|
US7096172B2
(en)
*
|
2003-01-31 |
2006-08-22 |
Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. |
System and method for automated reservoir targeting
|
|
US7200540B2
(en)
*
|
2003-01-31 |
2007-04-03 |
Landmark Graphics Corporation |
System and method for automated platform generation
|
|
EP1745612A4
(de)
*
|
2004-05-11 |
2011-03-16 |
Trimble Planning Solutions Pty Ltd |
Weganalysesystem
|
|
US7627461B2
(en)
*
|
2004-05-25 |
2009-12-01 |
Chevron U.S.A. Inc. |
Method for field scale production optimization by enhancing the allocation of well flow rates
|
|
WO2005121840A1
(en)
*
|
2004-06-07 |
2005-12-22 |
Exxonmobil Upstream Research Company |
Method for solving implicit reservoir simulation matrix equation
|
|
CA2570058C
(en)
|
2004-06-25 |
2013-07-30 |
Shell Canada Limited |
Closed loop control system for controlling production of hydrocarbon fluid from an underground formation
|
|
US7809537B2
(en)
*
|
2004-10-15 |
2010-10-05 |
Saudi Arabian Oil Company |
Generalized well management in parallel reservoir simulation
|
|
US7373285B2
(en)
*
|
2004-12-01 |
2008-05-13 |
Bp Corporation North America Inc. |
Application of phase behavior models in production allocation systems
|
|
US7596480B2
(en)
*
|
2005-04-14 |
2009-09-29 |
Saudi Arabian Oil Company |
Solution method and apparatus for large-scale simulation of layered formations
|
|
CA2624766C
(en)
*
|
2005-10-06 |
2016-01-05 |
Schlumberger Canada Limited |
Method, system and apparatus for numerical black oil delumping
|
|
AU2005338352B2
(en)
*
|
2005-11-21 |
2012-05-24 |
Chevron U.S.A., Inc. |
Method for field scale production optimization
|
|
CN101371164A
(zh)
*
|
2006-01-20 |
2009-02-18 |
界标制图有限公司 |
动态生产系统管理
|
|
US10260329B2
(en)
*
|
2006-05-25 |
2019-04-16 |
Honeywell International Inc. |
System and method for multivariable control in three-phase separation oil and gas production
|
|
US8571688B2
(en)
*
|
2006-05-25 |
2013-10-29 |
Honeywell International Inc. |
System and method for optimization of gas lift rates on multiple wells
|
|
WO2008055186A2
(en)
*
|
2006-10-30 |
2008-05-08 |
Schlumberger Canada Limited |
System and method for performing oilfield simulation operations
|
|
US8271247B2
(en)
*
|
2006-10-31 |
2012-09-18 |
Exxonmobil Upstream Research Company |
Modeling and management of reservoir systems with material balance groups
|
|
US8078444B2
(en)
*
|
2006-12-07 |
2011-12-13 |
Schlumberger Technology Corporation |
Method for performing oilfield production operations
|
|
US8190458B2
(en)
*
|
2007-01-17 |
2012-05-29 |
Schlumberger Technology Corporation |
Method of performing integrated oilfield operations
|
|
US7946127B2
(en)
*
|
2007-02-21 |
2011-05-24 |
Honeywell International Inc. |
Apparatus and method for optimizing a liquefied natural gas facility
|
|
US8775141B2
(en)
*
|
2007-07-02 |
2014-07-08 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
|
US20090076632A1
(en)
*
|
2007-09-18 |
2009-03-19 |
Groundswell Technologies, Inc. |
Integrated resource monitoring system with interactive logic control
|
|
US8892221B2
(en)
*
|
2007-09-18 |
2014-11-18 |
Groundswell Technologies, Inc. |
Integrated resource monitoring system with interactive logic control for well water extraction
|
|
WO2009056992A2
(en)
*
|
2007-11-01 |
2009-05-07 |
Schlumberger Canada Limited |
Reservoir fracture simulation
|
|
US7668707B2
(en)
*
|
2007-11-28 |
2010-02-23 |
Landmark Graphics Corporation |
Systems and methods for the determination of active constraints in a network using slack variables and plurality of slack variable multipliers
|
|
BRPI0820870A2
(pt)
*
|
2007-12-13 |
2015-06-16 |
Exxonmobil Upstream Res Co |
Método para simular um modelo de reservatório.
|
|
CA2706482A1
(en)
*
|
2007-12-21 |
2009-07-02 |
Exxonmobil Upstream Research Company |
Modeling in sedimentary basins
|
|
US20090198505A1
(en)
*
|
2008-02-05 |
2009-08-06 |
Peter Gipps |
Interactive path planning with dynamic costing
|
|
EP2161406A1
(de)
*
|
2008-09-03 |
2010-03-10 |
BP Exploration Operating Company Limited |
Verfahren und Vorrichtung zur Konfiguration eines Öl- und/oder Gasbeförderungsystems
|
|
BRPI0915280A2
(pt)
*
|
2008-06-16 |
2016-02-16 |
Bp Exploration Operating |
método e aparelho para configurar um sistema de produção de óleo e/ou gás
|
|
EP2151540A1
(de)
*
|
2008-06-16 |
2010-02-10 |
Bp Exploration Operating Company Limited |
Verfahren und Vorrichtung zur Konfiguration von Öl und/oder Gasbeförderungsystem
|
|
US8670966B2
(en)
*
|
2008-08-04 |
2014-03-11 |
Schlumberger Technology Corporation |
Methods and systems for performing oilfield production operations
|
|
BRPI0919457A2
(pt)
*
|
2008-09-30 |
2015-12-01 |
Exxonmobil Upstream Res Co |
método para simular escoamento de fluido em um reservatório de hidrocarboneto
|
|
US20100082509A1
(en)
*
|
2008-09-30 |
2010-04-01 |
Ilya Mishev |
Self-Adapting Iterative Solver
|
|
US9228415B2
(en)
|
2008-10-06 |
2016-01-05 |
Schlumberger Technology Corporation |
Multidimensional data repository for modeling oilfield operations
|
|
US8301426B2
(en)
*
|
2008-11-17 |
2012-10-30 |
Landmark Graphics Corporation |
Systems and methods for dynamically developing wellbore plans with a reservoir simulator
|
|
AU2010208105B2
(en)
*
|
2009-01-30 |
2015-01-22 |
Chevron U.S.A. Inc. |
System and method for predicting fluid flow in subterranean reservoirs
|
|
AU2014201894B2
(en)
*
|
2009-04-20 |
2016-10-06 |
David Randolph Smith |
Method and apparatus to enhance oil recovery in wells
|
|
US8490696B2
(en)
|
2009-04-20 |
2013-07-23 |
David Randolph Smith |
Method and apparatus to enhance oil recovery in wells
|
|
US20120130696A1
(en)
*
|
2009-08-12 |
2012-05-24 |
Exxonmobil Upstream Research Company |
Optimizing Well Management Policy
|
|
BR112012025995A2
(pt)
|
2010-04-30 |
2016-06-28 |
Exxonmobil Upstream Res Co |
método e sistema para simulação de fluxo de volume finito
|
|
US8463586B2
(en)
|
2010-06-22 |
2013-06-11 |
Saudi Arabian Oil Company |
Machine, program product, and computer-implemented method to simulate reservoirs as 2.5D unstructured grids
|
|
AU2011283196B2
(en)
|
2010-07-29 |
2014-07-31 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
|
US10087721B2
(en)
|
2010-07-29 |
2018-10-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine—learning based simulation of flow
|
|
EP2599023B1
(de)
|
2010-07-29 |
2019-10-23 |
Exxonmobil Upstream Research Company |
Verfahren und systeme für eine auf maschinenlernen beruhende flusssimulation
|
|
WO2012015517A1
(en)
|
2010-07-29 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
|
US8386227B2
(en)
|
2010-09-07 |
2013-02-26 |
Saudi Arabian Oil Company |
Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation
|
|
US8433551B2
(en)
|
2010-11-29 |
2013-04-30 |
Saudi Arabian Oil Company |
Machine, computer program product and method to carry out parallel reservoir simulation
|
|
BR112013002114A2
(pt)
|
2010-09-20 |
2016-05-17 |
Exxonmobil Upstream Res Co |
formulações flexíveis e adaptáveis para simulações de reservatório complexas
|
|
GB2503578A
(en)
|
2010-12-13 |
2014-01-01 |
Chevron Usa |
Method and system for coupling reservoir and surface facility simulations
|
|
US8972232B2
(en)
*
|
2011-02-17 |
2015-03-03 |
Chevron U.S.A. Inc. |
System and method for modeling a subterranean reservoir
|
|
US20120215364A1
(en)
*
|
2011-02-18 |
2012-08-23 |
David John Rossi |
Field lift optimization using distributed intelligence and single-variable slope control
|
|
CA2843929C
(en)
|
2011-09-15 |
2018-03-27 |
Exxonmobil Upstream Research Company |
Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
|
|
US9946986B1
(en)
|
2011-10-26 |
2018-04-17 |
QRI Group, LLC |
Petroleum reservoir operation using geotechnical analysis
|
|
US9767421B2
(en)
*
|
2011-10-26 |
2017-09-19 |
QRI Group, LLC |
Determining and considering petroleum reservoir reserves and production characteristics when valuing petroleum production capital projects
|
|
US20130110474A1
(en)
*
|
2011-10-26 |
2013-05-02 |
Nansen G. Saleri |
Determining and considering a premium related to petroleum reserves and production characteristics when valuing petroleum production capital projects
|
|
EP2780544B1
(de)
*
|
2012-02-24 |
2017-12-20 |
Landmark Graphics Corporation |
Ermittlung von optimalen parametern für eine bohrlochoperation
|
|
US9863228B2
(en)
*
|
2012-03-08 |
2018-01-09 |
Schlumberger Technology Corporation |
System and method for delivering treatment fluid
|
|
US9803457B2
(en)
|
2012-03-08 |
2017-10-31 |
Schlumberger Technology Corporation |
System and method for delivering treatment fluid
|
|
CA2874994C
(en)
*
|
2012-06-15 |
2017-02-07 |
Landmark Graphics Corporation |
Systems and methods for solving a multi-reservoir system with heterogeneous fluids coupled to a common gathering network
|
|
US20150169798A1
(en)
*
|
2012-06-15 |
2015-06-18 |
Landmark Graphics Corporation |
Methods and systems for gas lift rate management
|
|
AU2013274731B2
(en)
*
|
2012-06-15 |
2016-08-25 |
Landmark Graphics Corporation |
Systems and methods for optimizing facility limited production and injection in an integrated reservoir and gathering network
|
|
US9031822B2
(en)
|
2012-06-15 |
2015-05-12 |
Chevron U.S.A. Inc. |
System and method for use in simulating a subterranean reservoir
|
|
WO2014051903A1
(en)
|
2012-09-28 |
2014-04-03 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
|
US10012071B2
(en)
|
2013-07-11 |
2018-07-03 |
Laurie Sibbald |
Differential method for equitable allocation of hydrocarbon component yields using phase behavior process models
|
|
US20150337631A1
(en)
*
|
2014-05-23 |
2015-11-26 |
QRI Group, LLC |
Integrated production simulator based on capacitance-resistance model
|
|
EP3175265A1
(de)
|
2014-07-30 |
2017-06-07 |
ExxonMobil Upstream Research Company |
Verfahren zur erzeugung eines volumetrischen gitters in einem bereich mit heterogenen materialeigenschaften
|
|
US9951601B2
(en)
|
2014-08-22 |
2018-04-24 |
Schlumberger Technology Corporation |
Distributed real-time processing for gas lift optimization
|
|
US10443358B2
(en)
|
2014-08-22 |
2019-10-15 |
Schlumberger Technology Corporation |
Oilfield-wide production optimization
|
|
EP3213125A1
(de)
|
2014-10-31 |
2017-09-06 |
Exxonmobil Upstream Research Company Corp-urc-e2. 4A.296 |
Verfahren zur handhabung von diskontinuität beim aufbau eines entwurfsraums für ein fehlerhaftes unterirdisches modell mit beweglichen kleinsten quadraten
|
|
AU2015339884B2
(en)
|
2014-10-31 |
2018-03-15 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
|
FR3054705B1
(fr)
*
|
2016-07-29 |
2018-07-27 |
Veolia Environnement-VE |
Outil de gestion de multiples ressources en eau
|
|
US11263370B2
(en)
|
2016-08-25 |
2022-03-01 |
Enverus, Inc. |
Systems and methods for allocating hydrocarbon production values
|
|
US10303819B2
(en)
|
2016-08-25 |
2019-05-28 |
Drilling Info, Inc. |
Systems and methods for allocating hydrocarbon production values
|
|
CA3043231C
(en)
|
2016-12-23 |
2022-06-14 |
Exxonmobil Upstream Research Company |
Method and system for stable and efficient reservoir simulation using stability proxies
|
|
CN108729911A
(zh)
*
|
2017-04-24 |
2018-11-02 |
通用电气公司 |
用于资源生产系统的优化装置、系统和方法
|
|
GB2573694B
(en)
*
|
2017-06-14 |
2022-03-30 |
Landmark Graphics Corp |
Modeling geological strata using weighted parameters
|
|
US11466554B2
(en)
|
2018-03-20 |
2022-10-11 |
QRI Group, LLC |
Data-driven methods and systems for improving oil and gas drilling and completion processes
|
|
US11506052B1
(en)
|
2018-06-26 |
2022-11-22 |
QRI Group, LLC |
Framework and interface for assessing reservoir management competency
|
|
US11960261B2
(en)
|
2019-07-12 |
2024-04-16 |
Johnson Controls Tyco IP Holdings LLP |
HVAC system with sustainability and emissions controls
|
|
US12393992B2
(en)
|
2018-10-18 |
2025-08-19 |
Tyco Fire & Security Gmbh |
Systems and methods for assessing and controlling sustainability of an energy plant
|
|
US12007732B2
(en)
|
2019-07-12 |
2024-06-11 |
Johnson Controls Tyco IP Holdings LLP |
HVAC system with building infection control
|
|
US11078773B2
(en)
|
2018-12-03 |
2021-08-03 |
Saudi Arabian Oil Company |
Performing continuous daily production allocation
|
|
WO2021002853A1
(en)
*
|
2019-07-02 |
2021-01-07 |
Landmark Graphics Corporation |
Multi-agent, multi-objective wellbore gas-lift optimization
|
|
US12529490B2
(en)
|
2019-07-12 |
2026-01-20 |
Tyco Fire & Security Gmbh |
Infection control tool for HVAC system
|
|
US11714393B2
(en)
|
2019-07-12 |
2023-08-01 |
Johnson Controls Tyco IP Holdings LLP |
Building control system with load curtailment optimization
|
|
US12264828B2
(en)
|
2019-07-12 |
2025-04-01 |
Tyco Fire & Security Gmbh |
Air quality control and disinfection system
|
|
US11226600B2
(en)
*
|
2019-08-29 |
2022-01-18 |
Johnson Controls Tyco IP Holdings LLP |
Building control system with load curtailment optimization
|
|
CA3148100A1
(en)
*
|
2019-08-07 |
2021-02-11 |
Drilling Info, Inc. |
Systems and methods for allocating hydrocarbon production values
|
|
US12175380B2
(en)
|
2020-12-15 |
2024-12-24 |
Saudi Arabian Oil Company |
Gas-oil separation plant virtual water cut predictor based on supervised learning framework on time series data
|
|
US12261434B2
(en)
|
2022-02-10 |
2025-03-25 |
Tyco Fire & Security Gmbh |
Control system with multi-factor carbon emissions optimization
|
|
US12398905B2
(en)
|
2021-05-28 |
2025-08-26 |
Tyco Fire & Security Gmbh |
Building control system with multi-objective control of carbon emissions and occupant comfort
|
|
US12332617B2
(en)
|
2021-09-20 |
2025-06-17 |
Tyco Fire & Security Gmbh |
Building management system with sustainability improvement
|
|
JP2024534489A
(ja)
|
2021-09-20 |
2024-09-20 |
タイコ・ファイアー・アンド・セキュリティー・ゲーエムベーハー |
建物に対する持続可能性計画のためのシステム及び方法
|
|
US20250154856A1
(en)
*
|
2022-02-21 |
2025-05-15 |
Abu Dhabi National Oil Company |
Back allocation method
|