NO20063935L - Fremgangsmate for oppdatering av en geologisk reservoarmodell ved hjelp av dynamiske data - Google Patents
Fremgangsmate for oppdatering av en geologisk reservoarmodell ved hjelp av dynamiske dataInfo
- Publication number
- NO20063935L NO20063935L NO20063935A NO20063935A NO20063935L NO 20063935 L NO20063935 L NO 20063935L NO 20063935 A NO20063935 A NO 20063935A NO 20063935 A NO20063935 A NO 20063935A NO 20063935 L NO20063935 L NO 20063935L
- Authority
- NO
- Norway
- Prior art keywords
- gradual
- pilot points
- procedure
- dynamic data
- reservoir model
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 230000000295 complement effect Effects 0.000 abstract 1
- 239000003208 petroleum Substances 0.000 abstract 1
- 230000003068 static effect Effects 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V20/00—Geomodelling in general
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/66—Subsurface modeling
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/66—Subsurface modeling
- G01V2210/665—Subsurface modeling using geostatistical modeling
Landscapes
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Et innledende kart (y) over petrofysiske egenskaper blir konstruert ved hjelp av en geostatistisk simulator og statiske data. Et innledende sett med gradvise pilotpunkter (PP1) og minst ett komplementært sett med gradvise pilotpunkter (PPc) blir laget. Et kombinert sett med gradvise pilotpunkter (PP(t)) blir så konstruert ved å kombinere disse settene med gradvise pilotpunkter i henhold til den gradvise deformasjonsmetoden hvor minst én deformasjonsparameter er en karakteristisk parameter for pilotpunktene (posisjon og/eller verdi). Et innledende kart (y) blir så modifisert ved å ta hensyn til de petrofysiske egenskapene og det kombinerte settet med gradvise pilotpunkter (PP(t)). Deformasjonsparameterne blir så modifisert i henhold til de dynamiske data og prosedyren blir gjentatt fra det kombinerte konstruksjonssettet inntil et stoppkriterium blir nådd. Til slutt blir den geologiske reservoarmodellen oppdatert ved å tilordne kartet som er optimalisert med gitteret til modellen. Anvendelse: Spesielt egnet for utvikling av petroleumsreservoarer.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FR0509040A FR2890453B1 (fr) | 2005-09-05 | 2005-09-05 | Methode pour mettre a jour un modele geologique de reservoir a l'aide de donnees dynamiques |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| NO20063935L true NO20063935L (no) | 2007-03-06 |
Family
ID=36602454
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| NO20063935A NO20063935L (no) | 2005-09-05 | 2006-09-04 | Fremgangsmate for oppdatering av en geologisk reservoarmodell ved hjelp av dynamiske data |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US7363163B2 (no) |
| EP (1) | EP1760492B1 (no) |
| CA (1) | CA2558336C (no) |
| FR (1) | FR2890453B1 (no) |
| NO (1) | NO20063935L (no) |
Families Citing this family (56)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2851670B1 (fr) * | 2003-02-21 | 2005-07-01 | Inst Francais Du Petrole | Methode pour elaborer plus rapidement un modele stochastique representatif d'un reservoir heterogene souterrain, contraint par des donnees statiques et dynamiques incertaines |
| WO2005076124A1 (en) * | 2004-01-30 | 2005-08-18 | Exxonmobil Upstream Research Company | Reservoir evaluation methods |
| AU2007225358B2 (en) * | 2006-03-02 | 2012-11-15 | Exxonmobil Upstream Research Company | Method for quantifying reservoir connectivity using fluid travel times |
| WO2008067552A2 (en) * | 2006-11-30 | 2008-06-05 | Fluidigm Corporation | Method and apparatus for biological sample analysis |
| CA2678948A1 (en) * | 2007-03-20 | 2008-09-25 | Ion Geophysical Corporation | Apparatus and method for processing geophysical information |
| FR2914434B1 (fr) | 2007-03-30 | 2009-05-22 | Inst Francais Du Petrole | Methode de calage d'historique d'un modele geologique par modification graduelle des proportions des facies lithologiques |
| FR2920816B1 (fr) * | 2007-09-06 | 2010-02-26 | Inst Francais Du Petrole | Methode pour mettre a jour un modele geologique a l'aide de donnees dynamiques et d'essais de puits |
| US8437996B2 (en) | 2007-12-13 | 2013-05-07 | Exxonmobil Upstream Research Company | Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid |
| US7933750B2 (en) * | 2008-04-02 | 2011-04-26 | Schlumberger Technology Corp | Method for defining regions in reservoir simulation |
| WO2009137181A1 (en) * | 2008-05-05 | 2009-11-12 | Exxonmobil Upstream Research Company | Modeling dynamic systems by visualizing and narrowing a parameter space |
| US8355898B2 (en) * | 2008-06-17 | 2013-01-15 | Chevron U.S.A. Inc. | System and method for modeling flow events responsible for the formation of a geological reservoir |
| WO2010056427A1 (en) | 2008-11-14 | 2010-05-20 | Exxonmobil Upstream Research Company | Forming a model of a subsurface region |
| FR2949586B1 (fr) * | 2009-08-26 | 2011-09-23 | Inst Francais Du Petrole | Methode pour exploiter un reservoir petrolier a partir d'un calage d'historique optimise |
| WO2011037580A1 (en) | 2009-09-25 | 2011-03-31 | Landmark Graphics Corporation | Systems and methods for the quantitative estimate of production-forecast uncertainty |
| CN102741854B (zh) * | 2009-10-23 | 2015-08-19 | 埃克森美孚上游研究公司 | 利用梯度信息进行优化的方法 |
| CA2777346C (en) * | 2009-11-18 | 2017-01-10 | Conocophillips Company | Attribute importance measure for parametric multivariate modeling |
| FR2953039B1 (fr) * | 2009-11-26 | 2012-01-13 | Inst Francais Du Petrole | Methode d'exploitation d'un gisement petrolier par reconstruction de modele de reservoir |
| CN102640163B (zh) | 2009-11-30 | 2016-01-20 | 埃克森美孚上游研究公司 | 用于储层模拟的适应性牛顿法 |
| CA2783787A1 (en) | 2010-02-12 | 2011-08-18 | Exxonmobil Upstream Research Company | Method and system for creating history-matched simulation models |
| FR2957682B1 (fr) * | 2010-03-16 | 2012-03-23 | Inst Francais Du Petrole | Procede de surveillance d'un site de stockage geologique de gaz par inversion stratigraphique de donnees sismiques |
| BR112012025995A2 (pt) | 2010-04-30 | 2016-06-28 | Exxonmobil Upstream Res Co | método e sistema para simulação de fluxo de volume finito |
| US8775142B2 (en) | 2010-05-14 | 2014-07-08 | Conocophillips Company | Stochastic downscaling algorithm and applications to geological model downscaling |
| FR2961614B1 (fr) * | 2010-06-22 | 2012-06-15 | Inst Francais Du Petrole | Procede d'exploitation d'un gisement petrolier a partir d'un modele de reservoir deforme graduellement au moyen de cosimulations |
| AU2011283193B2 (en) | 2010-07-29 | 2014-07-17 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
| CA2803068C (en) | 2010-07-29 | 2016-10-11 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
| US10087721B2 (en) | 2010-07-29 | 2018-10-02 | Exxonmobil Upstream Research Company | Methods and systems for machine—learning based simulation of flow |
| CA2807300C (en) | 2010-09-20 | 2017-01-03 | Exxonmobil Upstream Research Company | Flexible and adaptive formulations for complex reservoir simulations |
| CN103282747B (zh) * | 2010-11-02 | 2016-06-29 | 界标制图有限公司 | 用于产生地质模型的更新的系统和方法 |
| AU2011332274B2 (en) | 2010-11-23 | 2017-02-23 | Exxonmobil Upstream Research Company | Variable discretization method for flow simulation on complex geological models |
| FR2970732B1 (fr) * | 2011-01-20 | 2013-01-04 | IFP Energies Nouvelles | Procede pour mettre a jour un modele de reservoir en temps reel a partir de donnees dynamiques tout en conservant sa coherence avec les observations statiques |
| US9164191B2 (en) * | 2011-02-09 | 2015-10-20 | Saudi Arabian Oil Company | Sequential fully implicit well model for reservoir simulation |
| US10113400B2 (en) * | 2011-02-09 | 2018-10-30 | Saudi Arabian Oil Company | Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation |
| FR2972539B1 (fr) * | 2011-03-09 | 2013-04-26 | Total Sa | Procede informatique d'estimation, procede d'exploration et d'exploitation petroliere mettant en oeuvre un tel procede |
| CN103959233B (zh) | 2011-09-15 | 2017-05-17 | 埃克森美孚上游研究公司 | 在执行eos计算的指令受限算法中最优化矩阵和向量运算 |
| US20130132052A1 (en) * | 2011-11-18 | 2013-05-23 | Chevron U.S.A. Inc. | System and method for assessing heterogeneity of a geologic volume of interest with process-based models and dynamic heterogeneity |
| US10387583B2 (en) | 2011-12-02 | 2019-08-20 | Schlumberger Technology Corporation | Rotations from gradient directions |
| WO2013148021A1 (en) | 2012-03-28 | 2013-10-03 | Exxonmobil Upstream Research Company | Method for mutiphase flow upscaling |
| FR2992448B1 (fr) * | 2012-06-26 | 2014-06-27 | IFP Energies Nouvelles | Procede d'exploitation d'un reservoir geologique a partir d'un modele de reservoir cale au moyen d'un parametrage multi-echelles |
| AU2013324162B2 (en) | 2012-09-28 | 2018-08-09 | Exxonmobil Upstream Research Company | Fault removal in geological models |
| US9458713B2 (en) | 2012-11-14 | 2016-10-04 | Repsol, S. A. | Generating hydrocarbon reservoir scenarios from limited target hydrocarbon reservoir information |
| US9470068B2 (en) * | 2013-08-28 | 2016-10-18 | Chevron U.S.A. Inc. | Methods and systems for historical, geological modeling to produce an estimated distribution of hydrocarbons trapped in subsurface clathrates |
| NL2012483B1 (en) | 2014-03-20 | 2016-01-18 | Stichting Incas3 | Method and system for mapping a three-dimensional structure using motes. |
| US10319143B2 (en) | 2014-07-30 | 2019-06-11 | Exxonmobil Upstream Research Company | Volumetric grid generation in a domain with heterogeneous material properties |
| US10359523B2 (en) | 2014-08-05 | 2019-07-23 | Exxonmobil Upstream Research Company | Exploration and extraction method and system for hydrocarbons |
| WO2016070073A1 (en) | 2014-10-31 | 2016-05-06 | Exxonmobil Upstream Research Company | Managing discontinuities in geologic models |
| AU2015339883B2 (en) | 2014-10-31 | 2018-03-29 | Exxonmobil Upstream Research Company | Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares |
| WO2016069171A1 (en) | 2014-10-31 | 2016-05-06 | Exxonmobil Upstream Research Company | Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques |
| CN106023131B (zh) * | 2015-08-28 | 2019-05-14 | 千寻位置网络有限公司 | 地图信息分析方法及其装置 |
| EP3362640B1 (en) * | 2015-10-14 | 2023-07-26 | Landmark Graphics Corporation | History matching of hydrocarbon production from heterogenous reservoirs |
| KR101625660B1 (ko) * | 2015-11-20 | 2016-05-31 | 한국지질자원연구원 | 지구통계기법에서의 관측자료를 이용한 2차자료 생성 방법 |
| WO2017222540A1 (en) * | 2016-06-24 | 2017-12-28 | Schlumberger Technology Corporation | Drilling measurement valuation |
| CN106501870B (zh) * | 2016-09-30 | 2019-04-09 | 中国石油天然气股份有限公司 | 一种湖相致密介壳灰岩相对优质储层识别方法 |
| HUE064459T2 (hu) | 2016-12-23 | 2024-03-28 | Exxonmobil Technology & Engineering Company | Eljárás és rendszer stabil és hatékony tározó szimulációhoz stabilitási proxyk alkalmazásával |
| CN111706318B (zh) * | 2020-05-26 | 2023-08-22 | 中国石油天然气集团有限公司 | 一种确定低渗储层剩余油分布状况的方法 |
| US20230385476A1 (en) * | 2022-05-25 | 2023-11-30 | Saudi Arabian Oil Company | Automated live properties component update in reservoir simulation model |
| US20250138211A1 (en) * | 2023-10-30 | 2025-05-01 | Saudi Arabian Oil Company | Surface-consistent travel-times inversion with accuracy estimation |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2780798B1 (fr) * | 1998-07-01 | 2000-12-08 | Inst Francais Du Petrole | Methode pour deformer graduellement un modele stochastique d'un milieu heterogene tel qu'une zone souterraine |
| FR2795841B1 (fr) * | 1999-07-02 | 2001-08-10 | Inst Francais Du Petrole | Methode pour deformer graduellement des simulations sequentielles d'un milieu heterogene tel qu'une zone souterraine |
| FR2823877B1 (fr) * | 2001-04-19 | 2004-12-24 | Inst Francais Du Petrole | Methode pour contraindre par des donnees dynamiques de production un modele fin representatif de la repartition dans le gisement d'une grandeur physique caracteristique de la structure du sous-sol |
| FR2846767B1 (fr) * | 2002-10-30 | 2004-12-24 | Inst Francais Du Petrole | Methode pour former plus rapidement un modele stochastique representatif d'un reservoir heterogene souterrain, contraint par des donnees dynamiques |
| FR2851670B1 (fr) * | 2003-02-21 | 2005-07-01 | Inst Francais Du Petrole | Methode pour elaborer plus rapidement un modele stochastique representatif d'un reservoir heterogene souterrain, contraint par des donnees statiques et dynamiques incertaines |
| FR2875305B1 (fr) * | 2004-09-16 | 2006-10-27 | Inst Francais Du Petrole | Methode pour generer un modele de reservoir sur maillage flexible |
-
2005
- 2005-09-05 FR FR0509040A patent/FR2890453B1/fr not_active Expired - Fee Related
-
2006
- 2006-08-30 EP EP06291384.3A patent/EP1760492B1/fr not_active Not-in-force
- 2006-09-01 CA CA2558336A patent/CA2558336C/fr not_active Expired - Fee Related
- 2006-09-04 NO NO20063935A patent/NO20063935L/no not_active Application Discontinuation
- 2006-09-05 US US11/514,925 patent/US7363163B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| US20070055447A1 (en) | 2007-03-08 |
| CA2558336C (fr) | 2014-11-18 |
| US7363163B2 (en) | 2008-04-22 |
| CA2558336A1 (fr) | 2007-03-05 |
| EP1760492A1 (fr) | 2007-03-07 |
| EP1760492B1 (fr) | 2014-10-15 |
| FR2890453A1 (fr) | 2007-03-09 |
| FR2890453B1 (fr) | 2007-10-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NO20062572L (no) | Fremgangsmate for a oppdatere en geologisk modell gjennom seismiske og produksjonsdata | |
| EA200970017A1 (ru) | Способ и система для проектирования и оптимизации операций бурения и заканчивания в углеводородных пластах - коллекторах | |
| NO20070369L (no) | Hydrodynamikk-basert gitterfrembringelse for geologisk modellering (Hydro-Gridding) | |
| GB2455237A (en) | System and method for performing oilfield simulation operations | |
| Komar et al. | Understanding long‐term carbon cycle trends: The late Paleocene through the early Eocene | |
| NO20063849L (no) | Fremgangsmater for evaluering av reservoarer | |
| Halland et al. | Evaluation of CO2 storage possibilities on the Norwegian Continental Shelf | |
| NO20065849L (no) | Fremgangsmate for oppdatering av en geologisk modell med seismiske data | |
| NO20054217D0 (no) | Fremgangsmate for a generere en reservoarmodell pa et fleksibelt gitter | |
| Chandra et al. | Effective integration of reservoir rock-typing and simulation using near-wellbore upscaling | |
| WO2009080711A3 (en) | Method for producing hydrocarbons through a well or well cluster of which the trajectory is optimized by a trajectory optimisation algorithm | |
| NO20073837L (no) | Fremgangsmate for a forutsi kvantitative verdier av en stein - eller fluidegenskap i et reserovar ved bruk av seismiske data | |
| CN106716181B (zh) | 使用多点统计模拟调节基于对象或事件的储层模型 | |
| NO20052045L (no) | Fremgangsmate for rekonstuksjon av en stokastisk modell som representerer et porost, heterogent medium med henblikk pa a forbedre modellens kalibrering med produksjonsdata | |
| NO20076326L (no) | Fremgangsmate for a bygge et geologisk modell av en underjordisk formasjon begrenset ved seismiske data | |
| NO20051563L (no) | Fremgangsmate for konstruksjo av en geomekanisk modell av en undergrunnssone som er tiltenkt koblet med en reservoarmodell | |
| FR2890453B1 (fr) | Methode pour mettre a jour un modele geologique de reservoir a l'aide de donnees dynamiques | |
| MY154586A (en) | Inversion of 4d seismic data | |
| NO20084606L (no) | Fremgangsmate for a optimalisere produksjonen fra en gruppe bronner | |
| Piñero et al. | 3-D numerical modelling of methane hydrate accumulations using PetroMod | |
| NO20061871L (no) | Karakterisering av konnektivitet i reservoarmodeller ved hjelp av baner med minst motstand | |
| GB2468812A (en) | Optimizing drilling operations using petrotechnical data | |
| GB2457823A (en) | System and method for performing oilfield simulation operations | |
| MY147190A (en) | Method and apparatus for investigating a borehole with a caliper | |
| WO2013135639A2 (en) | Method for simulating fluid flows, a computer program and a computer readable medium. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FC2A | Withdrawal, rejection or dismissal of laid open patent application |