PL149946B1 - Method of supporting roofs of mutually crossing dog headings - Google Patents

Method of supporting roofs of mutually crossing dog headings

Info

Publication number
PL149946B1
PL149946B1 PL25742386A PL25742386A PL149946B1 PL 149946 B1 PL149946 B1 PL 149946B1 PL 25742386 A PL25742386 A PL 25742386A PL 25742386 A PL25742386 A PL 25742386A PL 149946 B1 PL149946 B1 PL 149946B1
Authority
PL
Poland
Prior art keywords
workings
intersection
arches
corridor
mutually crossing
Prior art date
Application number
PL25742386A
Other languages
Polish (pl)
Other versions
PL257423A1 (en
Inventor
Jozef Pabian
Marian Kozdroj
Jozef Kaminski
Antoni Golaszewski
Krzysztof Nowak
Andrzej Bojko
Original Assignee
Bytomsko Rudzkie Gwarectwo Weg
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bytomsko Rudzkie Gwarectwo Weg filed Critical Bytomsko Rudzkie Gwarectwo Weg
Priority to PL25742386A priority Critical patent/PL149946B1/en
Publication of PL257423A1 publication Critical patent/PL257423A1/en
Publication of PL149946B1 publication Critical patent/PL149946B1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Description

OPIS PATENTOWYPATENT DESCRIPTION

149 946149 946

POLSKAPOLAND

RZECZPOSPOLITAREPUBLIC

LUDOWAFOLK

URZĄDOFFICE

PATENTOWYPATENT

PRLPRL

Patent dodatkowy do patentu nrZgłoszono: 86 Ol 08 /P. 257 423/Additional patent to patent no. Applied for: 86 Ol 08 / P. 257 423 /

Pierwszeństwo —-CZY łtLNIAPriority —- OR LIGHT

Urzędu PołowowegoThe Fishing Office

Int. Cl.4 E21D 11/36Int. Cl. 4 E21D 11/36

Zgłoszenie ogłoszono: &7 09 07 Opis patentowy opublikowano: 90 07 31Application announced: & 7 09 07 Patent description published: 90 07 31

Twórcy wynalazku: Józef Pabian, Marian Kozdrój, Józef Kamiński,Creators of the invention: Józef Pabian, Marian Kozdrój, Józef Kamiński,

Antoni Gołaszewski, Krzysztof Nowak, Andrzej BojkoAntoni Gołaszewski, Krzysztof Nowak, Andrzej Bojko

Uprawniony z patentu: Przedsiębiorstwo Eksploatacji Węgla Północ Kopalnia Węgla Kamiennego Rozbark, Bytom /Polska/The holder of a patent: Przedsiębiorstwo Eksploatacji Węgla Północ Coal Mine Rozbark, Bytom / Poland /

SPOSÓB OBUDOWY SKRZYŻOWANIA PODZIEMNYCH GÓRNICZYCH WYROBISK KORYTARZOWYCHMETHOD OF ENCLOSURE OF THE CROSSING OF UNDERGROUND MINING CORRIDOR PITCHES

Przedmiotem wynalazku jest sposób obudowy skrzyżowania dwóch krzyżujących się ze sobą górniczych wyrobisk korytarzowych w podziemiach kopalń, zabezpieczonych metalową obudową łukową. Stosowane w podziemiach kopalń wyrobiska korytarzowe zarówno udostępniające jak i przygotowawcze często krzyżują się ze sobą. Miejsca tych skrzyżowań są narażone na wzmożone ciśnienie górotworu, co czyni je bardzo niebezpiecznymi, wymagającymi starannej obudowy zdolnej do przeciwstawiania sią tym naprężeniom. Jednak ze względu na to, że nejczęściej wyrobiska korytarzowe służę do transportu materiałów odstawy urobku oraz do doprowadzenia odpowiedniej ilości powietrza do wyrobisk eksploatacyjnych, każde dodatkowe wzmocnienie obudowy skrzyżowania wyrobiska musi być tak wykonane, aby przy tym nie zmniejszało funkcjonalności obu krzyżujących się wyrobisk. Dotychczas najczęściej skrzyżowania wyrobisk korytarzowych obudowywano obudową prostokątną złożoną z podpór o dużej wytrzymałości na ściskanie i wyboczenia, stawianych w narożnikach skrzyżowania oraz z podciągów w postaci kształtowników stalowych, na których układano wykładkę z betonitów lub z drewna. Taka obudowa skrzyżowania ma tę wadę, że górotwór nad każdym wyrobiskiem tworzy naturalne sklepienie ciśnień i luźne skały tego sklepienia swoim ciężarem deformują w krótkim czasie obudowę skrzyżowania. Ratowanie obudowy przez podpieranie jej dodatkowymi stojakami zwykle prowadzi do takiego zagęszczenia elementów obudowy, że krzyżujące się wyrobiska przestają w ogóle spełniać swoje zadanie. W praktyce okazało się, że na skrzyżowaniu wyrobisk korytarzowych najkorzystniej jast stosować obudowę łukową zbliżoną kształtem do naturalnego sklepienia ciśnień. Jednak do tej pory było z tym dużo kłopotu ze względu na trudności połączenia ze sobą pod kątem łukowym elementów stropowych obudowy krzyżujących się wyrobisk korytażowych. Stosowana powszechnie podciągi szynowe nie zawsze dają pozytywne rezultaty, a niczym nia podparte przy tym narożniki trzeba wypełniać kasztami drewnianymi, które stano wią dość duże zagrożenie pożarowe.The subject of the invention is a method of lining the intersection of two intersecting mine workings in the underground of mines, protected by a metal arch lining. The corridor workings used in the underground of mines, both for access and for preparation, often intersect with each other. The places of these intersections are exposed to increased pressure of the rock mass, which makes them very dangerous, requiring careful casing capable of resisting these stresses. However, due to the fact that corridor excavations are most often used to transport materials for haulage of the excavated material and to supply the appropriate amount of air to the exploitation excavations, each additional reinforcement of the excavation intersection support must be made in such a way that it does not reduce the functionality of both intersecting excavations. Until now, most often the intersections of corridor workings were enclosed with a rectangular casing consisting of supports with high compressive strength and buckling strength, placed in the corners of the intersection, and of steel profile girders, on which a concrete or wooden lining was laid. Such an intersection casing has the disadvantage that the rock mass above each excavation creates a natural pressure vault and the loose rocks of this vault deform the junction casing with their weight in a short time. Saving the lining by supporting it with additional props usually leads to such a density of the lining elements that the intersecting pits stop fulfilling their task at all. In practice, it turned out that at the intersection of corridor workings, it is most advantageous to use an arch lining similar in shape to the natural pressure ceiling. However, so far it has been a lot of problems due to the difficulties of connecting the roof elements of the roofing of the crossing workings of the crossing with each other at an arc angle. The commonly used rail binders do not always give positive results, and the corners, which are supported at the same time, have to be filled with wooden battens, which pose a fairly high risk of fire.

149 946149 946

149 946149 946

Wymienionych wad i niedogodności nie na sposób obudowy skrzyżowań wyrobisk korytarzowych będącyc przedmiotem niniejszego wynalazku. Istota tego sposobu polega na tym, że na każdej z czterech linii połączenia wyrobisk korytarzowych ustawia się co najmniej dwa łukowe odrzwia obudowy w odległości około 0,2 m od siebie. Następnie na odcinku krzyżujących się wyrobisk obudowę wyrobiska głównego wykonuje się w postaci stropnic łukowych połączonych z obu stron z odcinkami stropnic prostych. Końce tych odcinków opiera się na prostych podciągach zamocowanych nad łukami stropnicowymi odrzwi wyrobisk bocznych. Podciągi te oparte w środku na stropnicach, mają końce połączone przegubowo z łukami ociosowymi odrzwi obudowy za pomocą wsporników. Całość obudowy skrzyżowania dodatkowo wzmacnia się podciągami szynowymi w znany sposób na długości około 15 m we wszystkich kierunkach od skrzyżowania. Taki sposób obudowy skrzyżowania wyrobisk korytarzowych w niczym nie zakłóca funkcjonalności tych wyrobisk. Dzięki zastosowaniu elementów łukowych uzyskano dobrą współpracę obudowy skrzyżowania z górotworem. Natomiast przez zastosowanie prostych odcinków połączonych z łukami stropowymi uzyskano możliwość bardzo łatwego i stosunkowo prostego łączenia ich z obudową łukową krzyżującego się wyrobiska korytarzowego.The abovementioned drawbacks and disadvantages do not cover the intersections of the workings being the subject of the present invention. The essence of this method is that on each of the four lines connecting the corridor workings, at least two arched support arches are set at a distance of about 0.2 m from each other. Then, on the section of intersecting workings, the main excavation support is made in the form of arched canopy connected on both sides with sections of straight canopies. The ends of these sections rest on straight binders fixed over the roof arches of the side excavation support arches. These beams, supported in the middle on the roof rails, have their ends articulated with the side arches of the support frame by means of brackets. The whole housing of the intersection is additionally reinforced with rail binders in a known manner over a length of about 15 m in all directions from the intersection. This method of supporting the intersection of corridor workings does not disturb the functionality of these workings in any way. Thanks to the use of arch elements, good cooperation of the intersection with the rock mass was achieved. On the other hand, by using straight sections connected with ceiling arches, it was possible to connect them very easily and relatively simply with the arch lining of the crossing corridor.

Przedmiot wynalazku jest dokładniej wyjaśniony na załączonym rysunku, na którym fig. 1 przedstawia schematycznie obudowę skrzyżowania wyrobisk korytarzowych w widoku z góry, fig. 2 - to samo skrzyżowanie w pionowym przekroju poprzeczyym wzdłuż linii A-A zaznaczonej na fig. 1, a fig. 3 - krzyżująca się wyrobisko korytarzowe w pionowym przekroju poprzecznym wzdłuż linii B-B zaznaczonej na fig. 2. Jak uwidoczniono na rysunku obudowę skrzyżowania dwóch krzyżujących się ze sobą wyrobisk korytarzowych zgodnie z wynalazkiem wykonuje się w następujący sposób. Najpierw na każdej linii połączenia wyrobisk korytarzowych zarówno w wyrobisku głównym 1 jak i w wyrobiskach bocznych 2 ustawia się co najmniej dwa odrzwia 3 obudowy łukowej w odległości około 0,2 m od siebie. Następnie w wyrobiskach bocznych 2 na tych odrzwiach układa się proste podciągi 4 o profilu korytkowym, które w środku podpiera się stropnicami odrzwi 3, a końce ich łączy się przegubowo za pomocą wsporników 5 z łukami ociosowymi tych odrzwi. Po wykonaniu tych czynności stropnice łukowe 6 wyrobiska głównego 1 łączy się z odcinkami 7 stropnic prostych, których końce opiera się na podciągach 4 wyrobisk bocznych 2, przy czym wszystkie połączenia są wykonane za pomocą śrub kabłąkowych. Na koniec zaś całość obudowy skrzyżowania wzmacnia się dodatkowo w znany sposób podciągami szynowymi na długości około 15 m w każdym kierunku od skrzyżowania·The subject of the invention is explained in more detail in the attached drawing, in which fig. 1 shows schematically the casing of the intersection of corridors in a plan view, fig. 2 - the same intersection in vertical cross-section along the line AA marked in fig. 1, and fig. 3 - intersecting corridor in a vertical cross-section along the line BB marked in Fig. 2. As shown in the drawing, the lining of the intersection of two intersecting corridors according to the invention is made as follows. First, on each line of connecting the corridor workings, both in the main heading 1 and in the side workings 2, at least two arch support frames 3 are set at a distance of about 0.2 m from each other. Then, in the side workings 2, on these frames, simple beams 4 with a trough profile are placed, which are supported in the center by the canopies of the support frames 3, and their ends are articulated with brackets 5 with the side arches of these frames. After that, the arched roofs 6 of the main excavation 1 are joined with the sections 7 of straight canopies, the ends of which rest on the binders 4 of the side excavations 2, all connections being made with U bolts. Finally, the whole housing of the intersection is additionally reinforced in a known manner with rail binders for a length of about 15 m in each direction from the intersection.

Claims (1)

Zastrzeżenie patentowePatent claim Sposób obudowy skrzyżowania podziemnych, górniczych wyrobisk korytarzowych, znamienny t y ra, że na każdej linii połączenia wyrobisk korytarzowych ustawia się co najmniej dwa odrzwia /3/ w odległości około 0,2 m od siebie i na odcinku krzyżujących się wyrobisk obudowę wyrobiska głównego /1/ wykonuje się w postaci stropnic łukowych /6/ połączonych z obu stron z odcinkami stropnic prostych /7/, które to odcinki opiera się końcami na prostych podciągach /4/ zamocowanych nad łukami stropowymi odrzwi /3/ w wyrobiskach bocznych /2/, przy czym końce podciągów /4/ łączy się przegubowo z łukami ociosowymi tych odrzwi za pomocą wsporników /5/.The method of supporting the intersection of underground, mining corridors, characterized by the fact that on each line of connecting the corridor workings, at least two doorframes / 3 / are placed at a distance of about 0.2 m from each other and on the section of the crossing workings the main excavation support / 1 / are made in the form of arched canopies / 6 / connected on both sides with sections of straight canopies / 7 /, which sections rest with their ends on straight binders / 4 / mounted over the arches of the arches / 3 / in side workings / 2 /, where the ends of the beams / 4 / are articulated with the side arches of these frames by means of brackets / 5 /. 149 946149 946 AAND Fig. 1Fig. 1 Δ=Α iΔ = Α i I siAnd si Fig.2Fig.2 6 76 7 Fig 3Fig 3
PL25742386A 1986-01-08 1986-01-08 Method of supporting roofs of mutually crossing dog headings PL149946B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL25742386A PL149946B1 (en) 1986-01-08 1986-01-08 Method of supporting roofs of mutually crossing dog headings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL25742386A PL149946B1 (en) 1986-01-08 1986-01-08 Method of supporting roofs of mutually crossing dog headings

Publications (2)

Publication Number Publication Date
PL257423A1 PL257423A1 (en) 1987-09-07
PL149946B1 true PL149946B1 (en) 1990-04-30

Family

ID=20030032

Family Applications (1)

Application Number Title Priority Date Filing Date
PL25742386A PL149946B1 (en) 1986-01-08 1986-01-08 Method of supporting roofs of mutually crossing dog headings

Country Status (1)

Country Link
PL (1) PL149946B1 (en)

Also Published As

Publication number Publication date
PL257423A1 (en) 1987-09-07

Similar Documents

Publication Publication Date Title
CN111456735A (en) Method for filling false roof without interval column and maintaining stability of downward single access
CN111456736A (en) A method for maintaining the stability of the down-flow single-pass filling false roof and recovering the inter-column
PL149946B1 (en) Method of supporting roofs of mutually crossing dog headings
RU2067173C1 (en) Method for transition of geological dislocation of disjunctive type by stoping face
CN213574101U (en) Wall caving prevention supporting structure for stoping roadway of fractured developing coal bed
US1006799A (en) Reinforced-concrete lining for mine-shafts and method of the manufacture thereof.
US4881853A (en) Support section for mines and tunnels
SU1252498A1 (en) Method of constructing tunnels of large section
PL146651B1 (en) Method of temprarily lining dog headings having arcuate floors
CA1231106A (en) Excavation and method of excavation
RU2111364C1 (en) Shield cover for mining of thick steep seams
GB2046815A (en) Tunnel lining units
Zuski The creation of a new transportation route near the Crystal Grotto in the “Wieliczka” Salt Mine through the construction of a fore-shaft equipped with a transportation device
PL191710B1 (en) The method of strengthening the sidewalks behind the front of the mining wall
RU2099539C1 (en) Device for reinforcing the fill mass
RU2018667C1 (en) Method for roof control in mounting slot
PL170101B1 (en) Support and method of making support for corridor workings
SU1565963A1 (en) Lining for sinking vertical working
PL137808B1 (en) Method of propping longwall-type workings
PL151438B1 (en) Method of arranging self-advancing roof support in a longwall inclined drift
PL223966B1 (en) Manufacturing method for the elimination and exit channel, and the mechanized complex of longwall mining excavations
PL150746B1 (en) Method of protecting floor rock against upheval and apparatus therefor
PL104761B1 (en) HOUSING OF CROSSED PITCH PITCHES
SU945457A1 (en) Flexible ceiling and method of its erection
SU1137214A1 (en) Multilayer ceiling for working thick sloping and steep seams with filling-up