PL433754A1 - Method for the protection of the rock mass in the area of heading crossings - Google Patents
Method for the protection of the rock mass in the area of heading crossingsInfo
- Publication number
- PL433754A1 PL433754A1 PL433754A PL43375420A PL433754A1 PL 433754 A1 PL433754 A1 PL 433754A1 PL 433754 A PL433754 A PL 433754A PL 43375420 A PL43375420 A PL 43375420A PL 433754 A1 PL433754 A1 PL 433754A1
- Authority
- PL
- Poland
- Prior art keywords
- intersection
- injection holes
- arched
- heading
- area
- Prior art date
Links
- 239000011435 rock Substances 0.000 title abstract 4
- 238000000034 method Methods 0.000 title abstract 2
- 238000002347 injection Methods 0.000 abstract 4
- 239000007924 injection Substances 0.000 abstract 4
- 239000011230 binding agent Substances 0.000 abstract 1
- 239000003245 coal Substances 0.000 abstract 1
- 238000005553 drilling Methods 0.000 abstract 1
- 238000005065 mining Methods 0.000 abstract 1
- 230000003245 working effect Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/36—Linings or supports specially shaped for tunnels or galleries of irregular cross-section
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Geochemistry & Mineralogy (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Zgłoszenie dotyczy sposobu zabezpieczenia górotworu w rejonie skrzyżowania wyrobisk chodnikowych w górnictwie podziemnym węgla kamiennego. Przynajmniej z jednego z krzyżujących się chodników (A, B) w trakcie jego drążenia wierci się otwory iniekcyjne łukowe (4, 6) w stropie skrzyżowania (1), wzdłużne do tego chodnika (A, B) i o długości (L1, L3) przekraczającej długości (L2, L4) skrzyżowania (1), skierowane wypukłością w górę, w głąb skał stropu. Następnie w te otwory iniekcyjne łukowe (4, 6) zatłacza się środki wiążące pod ciśnieniem wyższym od mechanicznej wytrzymałości na ściskanie skał w stropie skrzyżowania (1). Korzystnie otwory iniekcyjne łukowe (4, 6) wierci się w obu chodnikach (A, B) skrzyżowania (1) tak, że w każdym z nich mają one różne przewyższenia względem powierzchni stropu skrzyżowania (1) i mają przebiegi wzajemnie poprzeczne.The application concerns the method of securing the rock mass in the area of the intersection of heading workings in the underground hard coal mining industry. Arched injection holes (4, 6) are drilled from at least one of the intersecting galleries (A, B) in the course of its drilling, longitudinal injection holes (A, B) in the ceiling of the intersection (1), lengthwise (A, B) and length (L1, L3) exceeding of the length (L2, L4) of the intersection (1), with their convexity directed upwards, deep into the roof rocks. Then, binders are injected into these arched injection holes (4, 6) under a pressure higher than the mechanical compressive strength of the rocks in the roof of the intersection (1). Preferably, arched injection holes (4, 6) are drilled in both roadways (A, B) of the intersection (1) so that in each of them they have different elevations relative to the ceiling surface of the intersection (1) and have mutually transverse runs.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL43034319 | 2019-06-24 | ||
| PLP.430343 | 2019-06-24 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| PL433754A1 true PL433754A1 (en) | 2020-12-28 |
| PL242837B1 PL242837B1 (en) | 2023-05-02 |
Family
ID=86184115
Family Applications (4)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL433756A PL242838B1 (en) | 2019-06-24 | 2020-04-30 | Method for the protection of the rock mass in the area of planned heading crossings |
| PL433758A PL242839B1 (en) | 2019-06-24 | 2020-04-30 | Method of strengthening the rock mass for the designed heading |
| PL433759A PL242840B1 (en) | 2019-06-24 | 2020-04-30 | Method of strengthening roof rocks on the longwall face advance |
| PL433754A PL242837B1 (en) | 2019-06-24 | 2020-04-30 | Method for the protection of the rock mass in the area of heading crossings |
Family Applications Before (3)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL433756A PL242838B1 (en) | 2019-06-24 | 2020-04-30 | Method for the protection of the rock mass in the area of planned heading crossings |
| PL433758A PL242839B1 (en) | 2019-06-24 | 2020-04-30 | Method of strengthening the rock mass for the designed heading |
| PL433759A PL242840B1 (en) | 2019-06-24 | 2020-04-30 | Method of strengthening roof rocks on the longwall face advance |
Country Status (1)
| Country | Link |
|---|---|
| PL (4) | PL242838B1 (en) |
-
2020
- 2020-04-30 PL PL433756A patent/PL242838B1/en unknown
- 2020-04-30 PL PL433758A patent/PL242839B1/en unknown
- 2020-04-30 PL PL433759A patent/PL242840B1/en unknown
- 2020-04-30 PL PL433754A patent/PL242837B1/en unknown
Also Published As
| Publication number | Publication date |
|---|---|
| PL242839B1 (en) | 2023-05-02 |
| PL242840B1 (en) | 2023-05-02 |
| PL433756A1 (en) | 2020-12-28 |
| PL433759A1 (en) | 2020-12-28 |
| PL242837B1 (en) | 2023-05-02 |
| PL242838B1 (en) | 2023-05-02 |
| PL433758A1 (en) | 2020-12-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104632220B (en) | Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope | |
| MX2012009756A (en) | Underground mining. | |
| RU2396429C1 (en) | Procedure for weakening marginal massif of mine workings at development of coal beds | |
| RU2428566C1 (en) | Development method of gently sloping coal beds | |
| Zhang et al. | Spontaneous caving and gob-side entry retaining of thin seam with large inclined angle | |
| CN113153291A (en) | Comprehensive mechanical continuous mining method for hydraulic fracturing of gently inclined hard rock | |
| RU2441160C1 (en) | Method for underground mining of coal beds | |
| Esterhuizen et al. | Pillar stability issues based on a survey of pillar performance in underground limestone mines | |
| Konicek | Destressing | |
| CN105649627B (en) | A kind of single girdle coal-mining method of high-dipping | |
| CN103982185B (en) | Mechanized section-fill mining method with vertical hole and horizontal hole synergistic mining | |
| PL433754A1 (en) | Method for the protection of the rock mass in the area of heading crossings | |
| Yao et al. | Examples of ground support practice in challenging ground conditions at Vale� deep operations in Sudbury | |
| Townend et al. | Mitigation strategies for mining in high stress sill pillars at Coleman Mine–a case study | |
| Hudecek et al. | Results from dealing with rock and gas outburst prevention in the czech republic | |
| Imgrund et al. | Relaxation and gas drainage boreholes for high performance longwall operations in low permeability coal seams | |
| CN108678744B (en) | Mining method for excavating inclined manganese ore layer in ore body by using movable shield support | |
| RU2399766C1 (en) | Removal method of mechanical complex of mining face | |
| RU2403387C1 (en) | Method for development of contiguous beds series | |
| CN104747233A (en) | Roof management method for safety coal mining under condition of hard roof | |
| Khalikova et al. | Technological conditions for ensuring the stability of the array of enclosing rocks during the fastening of mine workings | |
| Dong et al. | Application of full-length anchor support technology in a large-section roadway under complicated geological conditions | |
| Chen et al. | Mining system for remaining coal of final highwall | |
| Konicek et al. | Destress blasting on the border of safety pillars | |