PL433759A1 - Method of strengthening roof rocks on the longwall face advance - Google Patents
Method of strengthening roof rocks on the longwall face advanceInfo
- Publication number
- PL433759A1 PL433759A1 PL433759A PL43375920A PL433759A1 PL 433759 A1 PL433759 A1 PL 433759A1 PL 433759 A PL433759 A PL 433759A PL 43375920 A PL43375920 A PL 43375920A PL 433759 A1 PL433759 A1 PL 433759A1
- Authority
- PL
- Poland
- Prior art keywords
- wall
- longwall
- strengthening roof
- ceiling
- rocks
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 239000011435 rock Substances 0.000 title abstract 3
- 238000005728 strengthening Methods 0.000 title abstract 2
- 238000002347 injection Methods 0.000 abstract 3
- 239000007924 injection Substances 0.000 abstract 3
- 239000011230 binding agent Substances 0.000 abstract 1
- 239000003245 coal Substances 0.000 abstract 1
- 238000005065 mining Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/36—Linings or supports specially shaped for tunnels or galleries of irregular cross-section
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Geochemistry & Mineralogy (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Zgłoszenie dotyczy sposobu wzmacniania skał stropowych na wybiegu ściany, znajdujący zastosowanie w górnictwie podziemnym węgla kamiennego. Sposób ten polega na tym, że w stropie (4) ściany na jej wybiegu wykonuje się okresowo, z wyprzedzeniem (L) frontu (5) ściany, przynajmniej z jednego chodnika przyścianowego (2, 3) równoległe do frontu (5) ściany i powierzchni jej stropu (4) otwory iniekcyjne (6, 6') o długości (L2) równej długości frontu (5) ściany, a następnie przez ten otwór iniekcyjny (6, 6') zatłacza się środki wiążące pod ciśnieniem większym od wytrzymałości na ściskanie skał stropu (4). Otwory iniekcyjne (6, 6') wykonuje się w odległości (L1) od powierzchni stropu (4) na wybiegu ściany.The application concerns a method of strengthening roof rocks on the longwall run, which is used in underground hard coal mining. This method consists in the fact that in the ceiling (4) of the wall on its run, periodically, in advance (L) of the front (5) of the wall, from at least one longwall gallery (2, 3) parallel to the front (5) of the wall and the (4) injection holes (6, 6') of length (L2) equal to the length of the front (5) of the wall, and then through this injection hole (6, 6') binders are injected under a pressure greater than the compressive strength of rocks ceiling (4). Injection holes (6, 6') are made at a distance (L1) from the ceiling surface (4) on the wall extension.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PLP.430343 | 2019-06-24 | ||
| PL43034319 | 2019-06-24 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| PL433759A1 true PL433759A1 (en) | 2020-12-28 |
| PL242840B1 PL242840B1 (en) | 2023-05-02 |
Family
ID=86184115
Family Applications (4)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL433754A PL242837B1 (en) | 2019-06-24 | 2020-04-30 | Method for the protection of the rock mass in the area of heading crossings |
| PL433758A PL242839B1 (en) | 2019-06-24 | 2020-04-30 | Method of strengthening the rock mass for the designed heading |
| PL433759A PL242840B1 (en) | 2019-06-24 | 2020-04-30 | Method of strengthening roof rocks on the longwall face advance |
| PL433756A PL242838B1 (en) | 2019-06-24 | 2020-04-30 | Method for the protection of the rock mass in the area of planned heading crossings |
Family Applications Before (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL433754A PL242837B1 (en) | 2019-06-24 | 2020-04-30 | Method for the protection of the rock mass in the area of heading crossings |
| PL433758A PL242839B1 (en) | 2019-06-24 | 2020-04-30 | Method of strengthening the rock mass for the designed heading |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL433756A PL242838B1 (en) | 2019-06-24 | 2020-04-30 | Method for the protection of the rock mass in the area of planned heading crossings |
Country Status (1)
| Country | Link |
|---|---|
| PL (4) | PL242837B1 (en) |
-
2020
- 2020-04-30 PL PL433754A patent/PL242837B1/en unknown
- 2020-04-30 PL PL433758A patent/PL242839B1/en unknown
- 2020-04-30 PL PL433759A patent/PL242840B1/en unknown
- 2020-04-30 PL PL433756A patent/PL242838B1/en unknown
Also Published As
| Publication number | Publication date |
|---|---|
| PL242839B1 (en) | 2023-05-02 |
| PL433754A1 (en) | 2020-12-28 |
| PL242838B1 (en) | 2023-05-02 |
| PL433758A1 (en) | 2020-12-28 |
| PL433756A1 (en) | 2020-12-28 |
| PL242837B1 (en) | 2023-05-02 |
| PL242840B1 (en) | 2023-05-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU2017405652B2 (en) | Method for stepwise construction of preferential gas migration pathway at stope in coal seam | |
| EA201890133A1 (en) | METHOD N00 DEVELOPMENT BY LONG BITTINGS | |
| Pysmenniy et al. | Development of resource-saving technology when mining ore bodies by blocks under rock pressure | |
| WO2020192055A1 (en) | Two-step grouting modified water-protective coal mining method for roof aquifers | |
| SA521430660B1 (en) | mineral formation in fractures in a geological formation | |
| CN104453904B (en) | Sectional filling mining method without pull slot | |
| ZA202102741B (en) | Frozen aquifer-based method for underground longwall face coal mining under water-containing condition | |
| CN103498680B (en) | Improve the method for fully mechanized coal face period of beginning mining top-coal recovery rate | |
| CN104131834B (en) | A kind of stope drift active workings gob-side entry retaining method that is applicable to thin and medium seam | |
| MX2019009799A (en) | Paste for use in mining processes. | |
| PL433754A1 (en) | Method for the protection of the rock mass in the area of heading crossings | |
| Mei et al. | On preventing the high pressure water-inrush from floor with paste-like backfill mining | |
| CN309281682S (en) | Grouting pump set | |
| RU2695905C2 (en) | Mechanical block for the implementation of loading technology in the form of the blade or well in the drilling and explosive works (variants) | |
| RU172317U1 (en) | TECHNOLOGICAL MECHANISM FOR IMPLEMENTATION OF PRELIMINARY FIXING OF MECHANICAL JAMMING AT LEAST TWO-WEDGE TYPE IN A HOLE OR WELL | |
| RU150970U1 (en) | CLEANING ANCHOR | |
| RU2540125C2 (en) | Relief opening formation | |
| UA153572U (en) | THE METHOD OF REFLECTING ORE IN THE DEVELOPMENT OF STEEP DEPOSITS | |
| SU126451A1 (en) | Continuous batching system with single-stage groove | |
| CA221672S (en) | Rock bolt | |
| RU2304219C1 (en) | Method for development entry protection | |
| PL401488A1 (en) | Method for tunneling, especially the rescue tunnel in underground mines | |
| SU375379A1 (en) | METHOD FOR TREATING MINE DEPOSITS OF USEFUL MINERATED CAMERAS | |
| EA200100944A1 (en) | METHOD FOR DEVELOPING POWERFUL SUDDETTING ORE MINES | |
| PL436400A1 (en) | Arch support of mining paving support with increased load capacity at the joints |