WO1999005367A1 - Procede permettant de realiser un mur exterieur de cave - Google Patents

Procede permettant de realiser un mur exterieur de cave Download PDF

Info

Publication number
WO1999005367A1
WO1999005367A1 PCT/DE1998/002089 DE9802089W WO9905367A1 WO 1999005367 A1 WO1999005367 A1 WO 1999005367A1 DE 9802089 W DE9802089 W DE 9802089W WO 9905367 A1 WO9905367 A1 WO 9905367A1
Authority
WO
WIPO (PCT)
Prior art keywords
wall
shoring
support
basement
basement outer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/DE1998/002089
Other languages
German (de)
English (en)
Inventor
Georg Gollnow
Rolf König
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bilfinger SE
Original Assignee
Bilfinger und Berger Bau AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bilfinger und Berger Bau AG filed Critical Bilfinger und Berger Bau AG
Publication of WO1999005367A1 publication Critical patent/WO1999005367A1/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions

Definitions

  • the invention relates to a method for producing a basement outer wall directly next to an existing building wall according to the preamble of claim 1
  • the German patent DE 28 30 264 has disclosed a method for producing a self-supporting concrete wall that is to be inserted flush with an adjacent building into the building ground.
  • support beams are first inserted into the ground at a distance from the existing building.
  • a very complex support structure is attached to the head of the support beam, which then houses a reinforced concrete spar that is to be used to intercept the outer wall of the neighboring building downwards, to which a concrete wall consisting of many wall sections is concreted from top to bottom, whereby all wall sections are connected to each other with connecting reinforcements is supported with supports against the shoring.
  • the tensile force of the anchor is placed directly on the wall. Then the shoring beams are relieved and removed as a whole.
  • the invention is based on the object of developing a method for producing an outer basement wall which avoids the disadvantages of the above-mentioned prior art and in particular avoids the forwarding of vertical loads from the existing neighboring building into the shoring and furthermore develops support elements which can be adjusted horizontally, are easy to install and remove.
  • the shoring supports are formed in their upper area as cantilevers or are held by at least one support and are supported in the lower area by a lower support and the support elements are horizontally displaceably supported on the shoring support and after reaching their end position be fixed immovably.
  • the advantages achieved by the invention are, in particular, that a vertical load on the shoring device is essentially avoided by the existing neighboring building. Furthermore, this manufacturing process is much more cost-effective since there is no need for a complex interception structure for the neighboring building.
  • the installation of the support elements 8, which are required for the production of the basement outer wall, is simple. They can be installed horizontally displaceably and can be fixed locally to the shoring 3 after adjustment.
  • the shoring beams 3 are designed as double U-beams.
  • the support elements 8 can then be passed through in a simple manner.
  • the support elements 8 are ⁇ -shaped, the individual legs being made from T-profiles.
  • the two U-profiles of the shoring 8 can for example be provided with support plates 10 which are welded to the U-profiles. On these support plates 10, the support elements 8 can first be held in their height in a simple manner, brought horizontally into their desired position and then fixed to the shoring 3 or to the support plates 10. It is also advantageous that the formwork 12 for concreting the wall sections 4 are attached to the vertical legs 11 of the support elements 8 in a simple manner.
  • the foundations, the base plate 17 of the lower floor and the floor ceilings 16 including the load-bearing supports and wall elements are produced up to the upper edge of the uppermost basement.
  • the basement outer wall 1 according to the invention is now generally horizontally covered by the floor slab 17 and the floor ceilings 16 and / or by the floor walls 15. supports.
  • the support of the basement outer wall 1 via the support elements 8 is now no longer necessary.
  • the function of the support bracket 3 including its supports 6 and 7 is also eliminated.
  • Figure 1 shows a vertical section through a completed basement wall
  • Figure 2 shows the first phase of the production of an outer cellar wall
  • Figure 3 shows a horizontal section in the area of a shoring with support element 8
  • Figure 4 is a view of a support element 8
  • FIG. 5 shows a plan view of a support element 8.
  • FIG 1 an already finished basement outer wall 1 is shown with all supporting elements in a vertical section.
  • the shoring 3, which is designed in this embodiment as a double U-beam 9, is held horizontally by supports 6 and 7, the supports 6 being formed by ground anchors and the support 7 being formed by clamping in the ground.
  • the basement outer wall 1 which has already been produced is supported horizontally against the shoring support 3 by the supporting elements 8.
  • the base plate, the storey walls and ceilings are produced.
  • the outer wall is lap ceilings, sole plate and / or storey walls supported horizontally. A horizontal support via the support elements is then no longer required.
  • the support elements 8 can now be removed in a simple manner by separating the horizontal legs 13 directly on the surface of the basement outer wall 1 and by loosening the attachment to the shoring 3. Before that, the shoring anchors have to be relaxed. The shoring anchors 20 are then either removed and removed in their full length or only the part protruding into the basement. Then the shoring beams are removed either in their entire length or also only with the parts protruding into the basement.
  • Figure 2 shows the initial phase of the production of the basement outer wall 1.
  • a stiffener 19 for example a steel profile beam, is used for the horizontal support of the shoring beams.
  • Figure 3 shows a horizontal section in the area of a shoring 3, which is designed as a double U-beam 9.
  • the reference number 2 denotes the existing building wall in front of which the basement outer wall 1 is produced.
  • the horizontal legs 3 of the support element 8 are supported on the support plates 10, which are fastened to the shoring 3.
  • the shoring was inserted into borehole 18 that was cased or uncased. After setting the shoring 3 in the borehole 18, the cavity is usually filled with soil or delivered gravel material.
  • Figure 4 shows the side view of a support element 8 consisting of a vertical leg 11 and two horizontal legs 13.
  • the legs are made of T-profiles in this embodiment.
  • the horizontal legs 13 are welded to the vertical legs 11.
  • In the vertical Legs 11 are drilled holes 21 through which the horizontal reinforcement of the basement outer wall 1 is passed.
  • FIG. 5 shows the support element 8 in a plan view of an upper horizontal leg 13.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

L'invention concerne un procédé permettant de réaliser un mur extérieur de cave directement à côté d'un mur de bâtiment existant, selon lequel des poutres de coffrage sont introduites, à une certaine distance du mur de bâtiment existant, dans le sol de fondation, et le mur extérieur de cave est réalisé en suivant la progression du déblaiement, à l'aide de plusieurs sections de mur qui reposent contre les poutres de coffrage. Le procédé se caractérise en ce que les poutres de coffrage (3), dans leur zone supérieure, se présentent sous la forme de poutres en porte-à-faux (5) ou sont maintenues par au moins un support (6) et, dans leur zone inférieure, sont soutenues par un support inférieur (7), et en ce que les éléments de support (8) sont placés sur la poutre de coffrage (3) de façon à pouvoir être déplacés horizontalement et sont, après avoir atteint leur position extrême, fixés de façon à ne plus pouvoir se déplacer.
PCT/DE1998/002089 1997-07-26 1998-07-24 Procede permettant de realiser un mur exterieur de cave Ceased WO1999005367A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE1997132256 DE19732256C2 (de) 1997-07-26 1997-07-26 Verfahren zur Herstellung einer Kelleraußenwand
DE19732256.5 1997-07-26

Publications (1)

Publication Number Publication Date
WO1999005367A1 true WO1999005367A1 (fr) 1999-02-04

Family

ID=7837014

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/DE1998/002089 Ceased WO1999005367A1 (fr) 1997-07-26 1998-07-24 Procede permettant de realiser un mur exterieur de cave

Country Status (2)

Country Link
DE (1) DE19732256C2 (fr)
WO (1) WO1999005367A1 (fr)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2830264B1 (de) 1978-07-10 1979-10-04 Bilfinger Berger Bau Verfahren zur Herstellung einer unmittelbar mit einem benachbarten Gebaeude fluchtend in den Baugrund einzubringenden,selbsttragenden Betonwand
BE1008084A3 (nl) * 1994-10-25 1996-01-09 Bekaert Sa Nv Werkwijze voor het vervaardigen van een onderschoeiingsmuur.

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19616188C2 (de) * 1996-04-23 1998-07-02 Jan Dipl Ing Forster Verfahren zum Errichten einer Wand in einem Boden

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2830264B1 (de) 1978-07-10 1979-10-04 Bilfinger Berger Bau Verfahren zur Herstellung einer unmittelbar mit einem benachbarten Gebaeude fluchtend in den Baugrund einzubringenden,selbsttragenden Betonwand
BE1008084A3 (nl) * 1994-10-25 1996-01-09 Bekaert Sa Nv Werkwijze voor het vervaardigen van een onderschoeiingsmuur.

Also Published As

Publication number Publication date
DE19732256C2 (de) 2001-03-29
DE19732256A1 (de) 1999-02-11

Similar Documents

Publication Publication Date Title
AT397415B (de) Verfahren zur herstellung unterirdischer bauwerke mittels deckelbauweise
DE3309820A1 (de) Deckenplatte und verfahren zu ihrer herstellung
DE10018979A1 (de) Wandelement
EP0515724B1 (fr) Méthode et module préfabriqué pour la construction d'édifices et de bâtiments
AT395990B (de) Laermschutzwand
EP0520084B1 (fr) Méthode et module préfabriquée pour la production des constructions et des bâtiments
DE10007450A1 (de) Montageträgersystem sowie Verfahren zur Befestigung eines Fertigbauteils an einem Gebäudeteil unter Verwendung des Montageträgersystems
DE102004048969B3 (de) Anbausystem für von Baukörpern auskragende Konstruktionen
DE19732256C2 (de) Verfahren zur Herstellung einer Kelleraußenwand
AT16709U1 (de) Stützmauerelement und Stützmauer aus Stützmauerelementen
EP1046758A1 (fr) Procédé de construction d'une plaque en béton et du coffrage d'un mur, élément de coffrage préfabriqué
DE9314567U1 (de) Vorgefertigter Modul
DE4239057C2 (de) Verfahren und vorgefertigter Modul zur Herstellung von Bauwerken und Gebäuden
DE69001688T2 (de) Verfahren zur befestigung von horizontalen balken an stahlsaeulen eines gebaeudes und ein nach diesem verfahren errichtetes gebaeude.
DE1128114B (de) Verfahren zum Errichten von Gebaeudenn mit Hilfe von Montagestuetzen
DE3200262A1 (de) Verankerungseinrichtung fuer ein traggeruest einer aussenwand oder einer tragenden zwischenwand eines aus vorgefertigten teilen bestehenden montierbaren gebaeudes
DE3807764C2 (fr)
DE102018119213A1 (de) Verfahren zur Herstellung eines Bauwerks
EP0645501A1 (fr) Méthode pour la production de modules préfabriqués pour la construction de bâtiments et module préfabriqué
DE2750931C2 (fr)
DE9105949U1 (de) Vorgefertigter Modul zur Herstellung von Bauwerken und Gebäuden
EP1126092A1 (fr) Support de montage
EP0290426A2 (fr) Revêtement pour murs de bâtiments
AT346048B (de) Mantelbeton - fertigteil - element
DE4314576C2 (de) Schalungskonstruktion

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): PL

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
122 Ep: pct application non-entry in european phase