WO2020194987A1 - 複層プレキャスト舗装道路 - Google Patents

複層プレキャスト舗装道路 Download PDF

Info

Publication number
WO2020194987A1
WO2020194987A1 PCT/JP2020/000261 JP2020000261W WO2020194987A1 WO 2020194987 A1 WO2020194987 A1 WO 2020194987A1 JP 2020000261 W JP2020000261 W JP 2020000261W WO 2020194987 A1 WO2020194987 A1 WO 2020194987A1
Authority
WO
WIPO (PCT)
Prior art keywords
pavement
board
pavement board
precast
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2020/000261
Other languages
English (en)
French (fr)
Inventor
福本 勝司
光谷 修平
佐藤 正憲
陽哉 松下
栞 中齊
起範 三津田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Road Corp
Original Assignee
Obayashi Road Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Road Corp filed Critical Obayashi Road Corp
Priority to EP20776392.1A priority Critical patent/EP3922771A4/en
Priority to CA3132794A priority patent/CA3132794C/en
Priority to US17/429,684 priority patent/US12392093B2/en
Priority to JP2020500908A priority patent/JP7396978B2/ja
Publication of WO2020194987A1 publication Critical patent/WO2020194987A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/08Temporary pavings
    • E01C9/086Temporary pavings made of concrete, wood, bitumen, rubber or synthetic material or a combination thereof
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/001Pavings made of prefabricated single units on prefabricated supporting structures or prefabricated foundation elements except coverings made of layers of similar elements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/005Individual couplings or spacer elements for joining the prefabricated units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/20Pavings made of prefabricated single units made of units of plastics, e.g. concrete with plastics, linoleum

Definitions

  • the present invention relates to a multi-layer precast paved road.
  • Conventional paved roads are made by laying paving materials such as heated asphalt mixture and ready-mixed concrete using their own pavement machines, rolling them as necessary, and then curing and hardening them. There is.
  • Paved roads deteriorate over time, but if they deteriorate, traffic is regulated, and not only the deteriorated parts but also a wide range of pavement materials are stripped off with special machines such as backhoes and breakers. It had to be reconstructed with pavement material.
  • a steel or FRP box is filled with foamed styrol to form a laying member that looks like a precast pavement board, and this laying member is used as an upper layer and a lower layer laying member.
  • a temporary road for a civil engineering site has been proposed in which the laying members of the upper layer and the lower layer are fastened in the vertical direction by fasteners such as bolts and nuts. Reference 1).
  • the temporary road has a structure in which a box-shaped body made of steel or FRP is filled with styrofoam, even if a reinforcing structure is provided inside, it is a general road or an expressway in terms of strength. It is virtually impossible to use in.
  • the upper and lower laying members are connected by bolts and nuts, it takes a lot of man-hours for both assembly and removal, and the bolts and nuts are easily loosened by vibration.
  • it is not suitable for general roads where vehicles frequently travel, much less for highways.
  • the upper pavement board and the lower pavement board can be easily connected by using a joint member, and assembling and disassembling can be performed easily and quickly without requiring a lot of man-hours.
  • the purpose is to provide a multi-story precast paved road that does not cause
  • the present invention includes a plurality of precast lower pavement boards laid on the roadbed and a plurality of precast upper pavement boards laid on the upper surface of the lower pavement board.
  • the lower pavement and the upper pavement are arranged in a staggered pattern, and a joint member is provided so as to straddle the upper and lower joint surfaces of the lower pavement and the upper pavement. It is characterized in that the lower pavement board and the upper pavement board of the joint member are connected to each other by engaging or fitting with the upper pavement board.
  • the upper pavement board and the lower pavement board can be easily connected by using a joint member, and can be easily and quickly assembled and disassembled without requiring a lot of man-hours.
  • the effect is that there are no steps on the layered precast paved road.
  • FIG. 1 It is a top view which shows the arrangement example of the plurality of joint holes provided in the hollow pavement board of the multi-layer precast paved road which concerns on Embodiment 2 of this invention. It is a cross-sectional view of A1-A1 line of FIG. It is a top view which shows the other form of a hollow pavement board.
  • (A) is a view in the direction of arrow X1 in FIG. 4, and
  • (B) is a sectional view taken along line A2-A2 in FIG.
  • FIG. 5 is a cross-sectional view showing a relationship between a hollow pavement and an upper pavement and a joint member of a lower pavement and an end lower pavement before vertical connection in the connection structure according to the first embodiment. It is sectional drawing which shows the relationship of the state which connected the hollow pavement and the upper layer pavement, the lower layer pavement, and the end lower layer pavement by the joint member in the connection structure which concerns on Embodiment 2.
  • FIG. 12 is a cross-sectional view taken along the line A4-A4 of FIG.
  • FIG. 5 is a plan view showing an arrangement example of a plurality of joint holes provided in the upper pavement board and the lower pavement board in the connection structure according to the second embodiment.
  • FIG. (A) is a partial plan view of the upper pavement board
  • (B) is a partial bottom view of the upper pavement board
  • (C) is a sectional view taken along line A5-A5 of (A).
  • (A) is a partial plan view of the lower pavement board
  • (B) is a sectional view taken along line A6-A6 of (A).
  • (A) to (F) are partial cross-sectional views showing the connection procedure of the upper pavement board and the lower pavement board in the order of the steps in the connection structure according to the second embodiment.
  • the plan view of the receiving member used for the connecting structure of the upper pavement board and the lower pavement board according to the third embodiment is a sectional view taken along line A7-A7 of (A), and (C) is Y1 of (B). It is an enlarged detailed view of a part.
  • the plan view of the joint member used for the connecting structure of the upper pavement board and the lower layer pavement board according to the third embodiment is a front view of the joint member, and (C) is an enlarged detail of the Y2 portion of (B). It is a figure.
  • (A) to (D) are partial cross-sectional views showing the connection procedure of the upper pavement board and the lower pavement board in the order of the steps in the connection structure according to the third embodiment.
  • FIG. 1 is an exploded partial perspective view for explaining the configuration of the precast paved road according to the first embodiment of the present invention, and the illustrated multi-layer precast paved road is a roadbed 6 provided on the roadbed 7.
  • the illustrated multi-layer precast paved road is a roadbed 6 provided on the roadbed 7.
  • It is provided with a plurality of upper layer pavement boards 2 having a rectangular plate shape, which is a pavement board made of precast to be stacked.
  • the plurality of upper pavement boards 2 are arranged in a staggered pattern with respect to the plurality of lower layer pavement boards 3 and the end lower layer pavement board 4, and these upper layer pavement boards 2, the lower layer pavement board 3 and the end lower layer pavement board 2 are arranged in a staggered manner.
  • the pavement board 4 is connected (fastened) in the vertical direction by a plurality of joint members 5.
  • the upper pavement board 2, the lower layer pavement board 3, and the end lower layer pavement board 4 used in the present invention are formed by a known precast method in advance before the construction of the multi-layer precast pavement road of the present invention.
  • the front-rear end face in the traveling direction is a tapered pavement or an auxiliary pavement formed in a substantially wedge shape at the front-rear end face.
  • a board may be used.
  • the joint between the rectangular plate-shaped pavement and the pavement with a tapered surface is connected with bolts or dowel pins. If there is a non-landing on the roadbed 6, loose sand is sprinkled to correct the non-landing.
  • a non-landing material obtained by winding an asphalt sheet into a roll is carried in. It can be deployed and laid on the non-land portion of the roadbed 6.
  • the multi-layer precast pavement road according to the present invention is based on the basic form in which the upper pavement board 2 straddles (fastens) the adjacent lower pavement boards 3 and 3 in the paved lower pavement board 3. .. Therefore, in the example shown in FIG. 1, the same number of upper pavement boards 2 are vertically connected (fastened) on each of the four lower pavement boards 3 and the end lower layer pavement board 4.
  • a multi-story precast paved road with a certain width will be constructed. The width of the road changes according to the alignment, and the vehicle traffic position that becomes the trajectory does not always match the alignment of the road.
  • the lower pavement board 3 and the lower end pavement board 4 are one of the upper pavement plates 2. Even if it can be laid in a straddling form, due to the difference in dimensions between the upper and lower pavement boards 2 to 4 due to changes in the road width and the vehicle traffic position that does not match the alignment, there is an odd edge on the side of the upper pavement board 2.
  • the upper pavement board 2 for the half-end is adjusted, and the upper pavement board 2 can be used to adjust the half-finished pavement on the lower pavement board 3 and the lower end pavement board 4.
  • "arranged in a staggered pattern” means that the lower pavement board 3 and the end portion thereof are at the joint (joint) of the lower pavement board 3 and the lower layer pavement board 4 laid in the lower layer.
  • the joints (joints) between the upper pavement 2 and the lower pavement 3 and the lower end pavement 4 so that the joints (joints) of the upper pavement 2 laid on the lower pavement 4 do not overlap. It means to arrange them in a staggered manner.
  • the upper pavement board 2, the lower pavement board 3, and the lower end pavement board 4 are rectangular in shape and size, but the upper layer is used. It is also possible to use pavement boards of different sizes in the lower layer. Further, in the example shown in FIG. 1, four upper pavement boards 2 are laid on the four lower pavement boards 3 and the lower end pavement board 4 laid in the road width direction. In a multi-layer precast pavement road, there are various forms in which the upper pavement 2 and the lower pavement 3 and the lower end pavement 4 are arranged so that the upper pavement 2 straddles the two lower pavements 3. There is.
  • the upper pavement plate 2, the lower pavement board 3, and the lower end layer coating board 4 used for the multi-layer precast pavement road according to the present embodiment are basically rectangular or quadrangular in plan view, but the lower pavement board 3 A precast pavement board having a polygonal shape other than a rectangle or a quadrangle can be used.
  • FIG. 2 is a partial cross-sectional view showing the drainage structure of the multi-layer precast paved road according to the present invention, and as shown in the figure, an upper-layer pavement board 2 composed of water-permeable concrete such as porous concrete was used as the upper layer.
  • an upper-layer pavement board 2 composed of water-permeable concrete such as porous concrete was used as the upper layer.
  • rainwater flows through the inside of the upper pavement 2 toward the side groove 9 on the road side as shown by the arrow X3, and the water does not permeate from the lower pavement 3 and the lower end pavement 4 to the roadbed 6 efficiently. It becomes possible to drain water to the side groove 9.
  • FIG. 3 is an exploded partial perspective view for explaining the configuration of the multi-layer precast paved road according to the second embodiment of the present invention.
  • the same elements as those shown in FIG. 1 are designated by the same reference numerals, and the description thereof will be omitted below.
  • the precast paved road according to the second embodiment of the present invention includes a plurality of rectangular plate-shaped lower pavement boards 3 and end lower layer pavement boards 4 that are spread on the roadbed 6 provided on the roadbed 7. It is provided with a plurality of rectangular plate-shaped upper layer coating boards 2 and a hollow pavement board 1 that are stacked on the lower layer pavement board 3 and the end lower layer pavement board 4 that are spread so as to be.
  • the hollow pavement board 1 is provided in place of the upper pavement board 2 located substantially in the center in the width direction on the multi-layer precast pavement road shown in FIG. 1, and penetrates the inside thereof in the road extension direction. The cavity 12 is penetrated. Since the other configuration of the multi-layer precast paved road according to the present embodiment is the same as the configuration of the multi-layer precast paved road according to the first embodiment, the description thereof will be omitted again.
  • the laying position of the hollow pavement board 1 is not limited to the substantially central portion in the width direction of the road, and may be arranged, for example, on the shoulder of the road or other parts.
  • the hollow pavement board 1, the upper layer pavement board 2, the lower layer pavement board 3, and the end lower layer pavement board 4 rectangular pavement boards having the same planar shape and size are used, but the upper layer and the lower layer are used. It is also possible to use pavement boards of different sizes.
  • the hollow pavement board 1 one having a narrower width than that illustrated in FIG. 3 may be used.
  • the hollow pavement board 1 is arranged so as to fill the space between the upper pavement boards 2 without straddling the lower pavement board 3.
  • Various arrangement modes can be considered for the arrangement of the upper and lower layers of the upper pavement board 2 including the hollow pavement board 1, the lower pavement board 3 and the lower end pavement board 4.
  • the hollow pavement board 1, the upper pavement board 2, the lower pavement slab 3, and the lower end pavement board 4 have a basic shape of a rectangular shape or a quadrangle in a plan view.
  • a polygonal precast pavement board having a plane shape other than a rectangle or a quadrangle can be used.
  • FIG. 4 is a perspective view of a hollow pavement board forming a part of the upper pavement board of the multi-layer precast pavement road according to the second embodiment of the present invention.
  • the hollow pavement plate 1 illustrated in FIG. 4 has a substantially rectangular cross section in the transverse direction and is substantially rectangular in a plan view, and has a round hole-shaped joint hole 11 penetrating in the thickness direction and penetrating in the road extension direction.
  • the cavity 12 is formed.
  • two cavities 12 are provided in parallel in this example, and a partition wall 13 for partitioning in the road extension direction is provided between the two cavities 12.
  • the plane size of the hollow pavement board 1 and the cross-sectional shape and size of the hollow 12 are not limited to those illustrated in the present embodiment.
  • FIG. 5 is a plan view showing an arrangement example of a plurality of (four in the illustrated example) joint holes 11 provided in the hollow pavement board 1.
  • the other pavement boards (upper layer pavement board 2, lower layer pavement board 3 and end lower layer pavement board 4) also have joint holes 11 (110: see FIGS. 10 and 11) in the same arrangement pattern. It is formed.
  • the joint holes 110 (see FIGS. 10 and 11) formed in the lower pavement 3 and the lower end pavement 4 do not penetrate the lower pavement 3 and the lower end pavement 4 in the vertical direction. It is preferably a specification. This is to prevent rainwater or the like from the upper pavement board 2 side including the hollow pavement board 1 from flowing into the roadbed 6 through the joint hole 110.
  • the hollow pavement board 1 is provided with four joint holes 11 as an example, but when the plan view of the hollow pavement board 1 is rectangular, each joint hole 11 is provided. It is formed at the intersection of the first diagonal line L3 and the second diagonal line L4 of the four rectangles divided by the straight line L1 that bisects the rectangle to the left and right and the straight line L2 that divides the rectangle into two equal parts vertically.
  • the present invention When the lower pavement 3 and the lower end pavement 4 arranged in the lower layer of the multi-layer precast pavement road and the hollow pavement 1 and the upper pavement 2 arranged in the upper layer are arranged in a staggered manner in the lower layer.
  • the joint holes 110 of the lower pavement 3 and the lower end pavement 4 to be arranged and the joint holes 11 of the hollow pavement 1 and the upper pavement 2 arranged in the upper layer are arranged at corresponding coaxial positions. Therefore, the hollow pavement board 1 and the upper pavement board 2 and the lower layer pavement board 3 and the end lower layer pavement board 4 can be connected (fastened) in the vertical direction by the joint member 5.
  • the position of the joint hole 11 (110) in the present embodiment may be arranged closer to the inside or outside of the pavement in consideration of the loading load and the like.
  • the number of joint holes 11 (110) is not limited to four, and is 4 depending on the size of the pavement (hollow pavement 1, upper pavement 2, lower pavement 3, and lower end pavement 4). It may be more than one or less than four.
  • FIG. 6 is a cross-sectional view taken along the line A1-A1 of FIG. 4, and as shown in FIG. 4, the cavity pavement board 1 shown in FIG. 4 has a groove portion 15 provided so as to orbit the end surface of the opening of the cavity 12. Is provided with a waterproof seal 14.
  • the water stop seal 14 includes an expansion portion 14A and a hydrophilic portion 14B that covers the expansion portion 14A.
  • urethane foam compressed in the road extension direction is used for the expansion portion 14A, but a material other than urethane foam can be used for the expansion portion 14A.
  • hydrophilic portion 14B a material that expands when it comes into contact with water, such as hydrophilic urethane, is used, but if it is a material that expands when it comes into contact with water, not only hydrophilic urethane but other materials are used. You may.
  • the water stop seal 14 expands in the road extension direction even if rainwater infiltrates the connecting portion, so that the rainwater infiltrates into the inside of the cavity 12. It can be prevented.
  • FIG. 7 is a plan view showing another form of the hollow pavement board.
  • the non-contact power feeding coil 91 is arranged on the hollow pavement board 1.
  • the hollow pavement board 1 can be modularized by arranging a non-contact power feeding coil 91 inside the hollow 12.
  • the adjacent non-contact power feeding coils 91 are connected to each other by an appropriate method.
  • the non-contact power feeding coil 91 is not wet by rainwater or the like.
  • the hollow pavement board 1 can be modularized as a pavement board with cables by arranging cables such as power lines and communication lines in the hollow 12.
  • FIG. 8 (A) is a view in the direction of arrow X1 in FIG. 4
  • FIG. 8 (B) is a sectional view taken along line A2-A2 in FIG. 4, and as shown in FIG. 8 (B), the hollow pavement board 1 is A tubular peripheral wall 16 forming the joint hole 11 and an arc-shaped protrusion 17 provided near the middle of the inner surface of the peripheral wall 16 in the vertical direction of the joint hole 11 are provided.
  • the peripheral wall 16 is arranged inside the cavity 12, has a substantially circular shape in a plan view, and extends in the vertical direction. Further, the protrusion 17 orbits the inside of the peripheral wall 16 along the peripheral wall 16 and has a pair of notches 17A in a part in the circumferential direction.
  • the hollow pavement board 1 is formed of a synthetic resin that exhibits sufficient molding strength as a road.
  • this synthetic resin include FRP and various high-strength plastics (PAI, PEEK, etc.), and in addition to synthetic resin, carbon fiber reinforced concrete and FRP reinforced concrete can also be used.
  • PAI high-strength plastics
  • carbon fiber reinforced concrete and FRP reinforced concrete can also be used.
  • the upper pavement board 2 and the lower pavement board 3 in the present invention are made of precast concrete in which the cross section of the hollow pavement board 1 without the cavity 12 is enriched and the joint hole 110 similar to the joint hole 11 is provided. It has the same shape as the outer shape of the hollow pavement board 1. Therefore, the joint hole 110 also includes an arcuate protrusion 170 and a pair of notches 170A.
  • the lower end pavement board 4 has a form in which the lower pavement board 3 is divided into two equal parts vertically in a plan view, but the plan shape of the lower end pavement board 4 is not limited to this example.
  • the lower pavement board 3 and the lower end pavement board 4 are provided with a seal made of a water-swellable resin such as hydrophilic polyurethane so as to face each other on the side surfaces that come into contact with each other when they are laid. It is desirable to have.
  • the upper pavement board 2 may be made of porous concrete that allows water to pass through, a porous structure that can reduce running noise, or a structure that has slits on the surface.
  • the lower pavement board 3 and the end lower layer pavement board 4 can be formed by using reinforced concrete, steel fiber reinforced concrete, or fiber reinforced concrete. Reinforced concrete, steel fiber reinforced concrete, or fiber reinforced concrete can also be used for the upper pavement board 2.
  • the multi-layer precast pavement road according to the present invention can have strength and durability as a pavement road.
  • the present invention is applied to a bridge, the upper pavement board 2 including the hollow pavement board 1 is directly connected to the lower layer pavement board 3 in which the floor board constructed on the girder is spread.
  • the lower pavement board 3 including the lower end pavement board 4 can be omitted.
  • FIG. 9 is a perspective view showing an example of the joint member 5, wherein the illustrated joint member 5 has a substantially cylindrical main body 51 and a cylindrical base 52 arranged at the upper end of the main body 51. It includes an umbrella-shaped variable lock portion 53, a leg portion 55 extending downward, and a pair of substantially convex flange portions 56 that are integrally projected so as to face each other in the circumferential direction of the leg portion 55.
  • the diameter of the base portion 52 is set to be smaller than the diameter of the main body portion 51, and the diameter of the lower end of the variable lock portion 53 is set to be larger than the diameter of the base portion 52 and smaller than the diameter of the main body portion 51.
  • the diameter of the cage is gradually decreasing upward.
  • the variable lock portion 53 is formed with four slit-shaped notched groove portions 54 cut out from the upper end portion to the middle of the base portion 52 at an equal angle pitch (90 ° pitch) in the circumferential direction. That is, the slit-shaped notch groove portion 54 formed long in the vertical direction is formed so as to divide the substantially umbrella-shaped variable lock portion 53 and the base portion 52 into four in the circumferential direction.
  • the leg portion 55 has a diameter smaller than the diameter of the main body portion 51 and extends downward.
  • the pair of flange portions 56 integrally formed so as to face each other in the circumferential direction of the leg portions 55 have the same diameter (circumscribed circle diameter) as the diameter of the main body portion 51, and the joint hole 110 (11). It has a planar shape capable of passing through the notch 170A (17A) of the protrusion 170 (17) in the above.
  • the distance between the lower end surface of the main body 51 and the upper end surface of the flange 56 (the apparent length of the legs 55) is set to be slightly larger than the thickness of the protrusion 170 (17).
  • the joint member 5 is detachably installed in the four joint holes 110 formed in the lower pavement board 3 and the lower end pavement board 4, and the four joints formed in the hollow pavement board 1 and the upper pavement board 2 are formed.
  • a substantially umbrella-shaped variable lock portion 53 controls mounting allowance and removal regulation of the hollow pavement board 1 or the upper pavement board 2.
  • the variable lock portion 53 is not limited to a substantially umbrella-shaped shape. For example, if the cross-sectional shape of the inner circumference of the protrusion 17 is an inverted taper, the variable lock portion 53 is not substantially an umbrella shape, but a substantially columnar shape having a notch groove portion 54 is sufficient.
  • the joint member 5 can be made of plastic, metal, or a composite material thereof.
  • FIG. 10 is a cross-sectional view showing the relationship between the hollow pavement 1 and the upper pavement 2 and the lower pavement 3 and the joint member 5 before the upper and lower connection of the lower end pavement 4, and FIG. 11 shows the hollow pavement 1 and the upper pavement. It is sectional drawing which shows the relationship of the state which the board 2, the lower layer pavement board 3 and the end lower layer pavement board 4 are connected (fastened) by a joint member 5.
  • a pair of flange portions 56 below the joint member 5 pass through a notch 170A formed in a protrusion 170 of the joint hole 110 of the lower layer pavement board 3 and the end lower layer pavement board 4. Then, it is inserted into the back of the protrusion 170, and then rotated by, for example, an angle of 90 ° around the axis, so that the flange 56 engages with the protrusion 170 of the lower pavement 3 and the lower end pavement 4. It will not come out in either the upward or downward direction.
  • the hollow pavement board 1 or the upper layer pavement board 2 is placed from above so that the joint member 5 fits into the joint hole 11 formed therein. Then, since the joint member 5 includes a substantially umbrella-shaped variable lock portion 53 having a notch groove portion 54, when the notch groove portion 54 of the variable lock portion 53 is compressed by the protrusion portion 17, it has a substantially umbrella shape.
  • the variable lock portion 53 of the above enters between the protrusions 17 and opens when the lower end portion 53A of the variable lock portion 53 passes through the protrusion 17.
  • the hollow pavement 1 or the upper pavement 2 fitted in the joint member 5 faces upward. I can't get out of it.
  • the upper pavement board 2 including the hollow pavement board 1 is tightly coupled to the lower pavement board 3 including the lower end pavement board 4 via the joint member 5 to form two upper and lower layers (hollow pavement board 1). 2) and the lower pavement board (including the lower end pavement board 4) 3 are combined and integrated.
  • the joint member 5 used in the multi-layer precast paved road according to the present invention is not limited to the one used in the present embodiment.
  • the leg portion 55 formed at the lower part of the joint member 5 and the substantially convex shape provided on the periphery thereof instead of the substantially umbrella-shaped variable lock portion 53 provided on the joint member 5, the leg portion 55 formed at the lower part of the joint member 5 and the substantially convex shape provided on the periphery thereof.
  • a joint member in which the flange portion 56 is provided on the upper portion of the main body portion 51 in a vertically symmetrical direction can be used.
  • the joint member may be provided with a jig hole such as a through hole on the central axis thereof, and the jig hole may be used to hold a jig for rotating the joint member.
  • the variable lock portion can be considered to be one that is deformed to perform the locking function and one that is displaced to perform the locking function.
  • FIG. 12 is a perspective view showing an example of the removing tool 8 of the joint member 5, and FIG. 13 is a sectional view taken along line A4-A4 of FIG.
  • the remover 8 faces a pressing portion 81 having a hollow portion 84 (see FIG. 13) whose diameter gradually increases downward on the lower end surface and facing the lower end portion of the pressing portion 81.
  • a pair of hooking protrusions 83 and a hook 82 provided at the upper end of the pressing portion 81 are provided.
  • the maximum diameter of the hollow portion 84 of the removal jig 8 is the same as or slightly smaller than the maximum diameter of the substantially umbrella-shaped variable lock portion 53.
  • the vertical length of the hollow portion 84 is the same as or slightly longer than the vertical length of the substantially umbrella-shaped variable lock portion 53, and as shown in FIG. 13, the hollow portion 84 is convex inward in the vertical cross section. It has a curved surface that becomes.
  • the length from one end to the other end of the hooking protrusion 83 is substantially equal to the diameter of the joint hole 11. Further, the outer diameter of the pressing portion 81 is slightly smaller than the diameter of the circumscribed circle of the protruding portion 17.
  • the remover 8 is pressed from above so that the substantially umbrella-shaped variable lock portion 53 fits into the hollow portion 84.
  • the substantially umbrella-shaped variable lock portion 53 has a notch groove portion 54
  • the variable lock portion 53 is pushed by the cavity portion 84 and the notch groove portion 54 contracts in the radial direction, so that the lower end of the substantially umbrella-shaped variable lock portion 53 is formed.
  • the engagement between the portion 53A and the protrusion 17 is released.
  • the hooking protrusion 83 is further pushed downward in a direction that does not interfere with the protrusion 17, and when the hooking protrusion 83 exceeds the protrusion 17, the remover 8 is rotated. The portion 83 engages with the protrusion 17. Then, from this state, when the remover 8 is pulled upward by a wire or the like hooked on the hook 82, the hollow pavement board 1 or the upper pavement board 2 can be removed from the joint member 5. This work can be performed in the four joint holes 11 of the hollow pavement 1 or the upper pavement 2 to separate the hollow pavement 1 or the upper pavement 2 from the lower pavement 3 including the lower end pavement 4. it can.
  • FIG. 14 is a plan view showing an arrangement example of a plurality of joint holes provided in the upper pavement board and the lower pavement board in the connection structure according to the second embodiment
  • FIG. 15 is an exploded portion showing the connection structure according to the second embodiment.
  • a perspective view FIG. 14 (A) is a partial plan view of the upper pavement board
  • FIG. 14 (B) is a partial bottom view of the upper pavement board
  • FIG. 14 (C) is a sectional view taken along line A5-A5 of FIG. 14 (A).
  • 15 (A) is a partial plan view of the lower pavement board
  • FIG. 15 (B) is a sectional view taken along line A6-A6 of FIG. 15 (A)
  • FIGS. 16 (A) to 16 (F) relate to the second embodiment.
  • It is a partial cross-sectional view which shows the connection procedure of the upper layer pavement and the lower layer pavement in the order of the process in the connection structure.
  • joints having a rectangular shape in a plan view are provided at four locations (the same locations as in the first embodiment (see FIG. 5)) of the upper pavement board 2 and the lower pavement board 3.
  • Holes 11 and 110 are penetrated in the vertical direction (see FIGS. 15 and 17 for the joint hole 110 formed in the lower pavement board 3).
  • the structure around the joint holes 11 and 110 at one location will be illustrated and described, but since the structures around the joint holes 11 and 110 at other locations are the same, the illustration and description thereof will be described. Omit.
  • a rectangular block-shaped engaging convex is formed on the lower half of the short side surface (right end surface of FIG. 16).
  • the portions 61 are integrally formed.
  • a rectangular engagement in a plan view extending in the longitudinal direction of the joint hole 11 (left side in FIG. 16) from the surface on the short side facing the engaging convex portion 61 of the joint hole 11.
  • a recess 62 is formed.
  • the resin joint member 64 and the wedge member 65 shown in FIG. 15 are used for connecting the upper pavement board 2 and the lower pavement board 3.
  • the joint member 64 includes a square columnar main body portion 64A and rectangular block-shaped engaging protrusions 64B and 64C protruding horizontally and integrally in the same direction from the upper and lower ends of the same surface of the main body portion 64.
  • Two slit-shaped fitting grooves 64a are formed in the vertical direction at appropriate intervals in the width direction on the surface of the main body 64A opposite to the side on which the engaging convex portion 64A is formed. ..
  • the wedge member 65 includes a rectangular flat plate-shaped main body portion 65A that is long in the vertical direction, and two rectangular rib-shaped fitting protrusions that are long in the vertical direction from one end surface on the long side side of the main body portion 64A. 65a is projected integrally.
  • the two fitting protrusions 65a are fitted into the two fitting grooves 64a formed in the joint member 64 as described later, and have the same pitch as the seven fitting grooves 64a in the width direction. Have been placed.
  • the hanging tool 100 whose tip is bent in an L shape is inserted into the joint hole 11 of the upper pavement board 2 from above, and the tip is engaged with the upper pavement board 2. Engage with the joint recess 62. Then, in that state, the hanging tool 100 is pulled up and the upper pavement board 2 is hung horizontally. Then, the upper pavement board 2 was moved onto the lower pavement board 3 laid in advance, and the joint hole 11 formed in the upper pavement board 2 was positioned so as to match the joint hole 110 formed in the lower pavement board 3. In this state, the upper pavement board 2 is lowered, and as shown in FIG. 18B, the upper pavement board 2 is superposed on the lower pavement board 3.
  • the height dimensions h1, h2, h3 of each part shown in FIG. 18B substantially match the height dimensions h1, h2, h3 of each part of the joint member 64 shown in FIG. 15, and the upper pavement board 2 and the lower layer pavement board 3
  • the total height H of the joint member 64 and the wedge member 65 substantially coincide with the height H of the joint member 64 and the wedge member 65.
  • the upper pavement board 2 is superposed on the lower pavement board 3, and the joint holes 11 and 110 formed in both are matched with each other, and is shown in FIG. 18 (C).
  • the joint member 64 is inserted into the joint holes 11 and 110 formed in the upper pavement board 2 and the lower pavement board 3 from above and passed through.
  • the engaging protrusions 64B and 64C projecting above and below the joint member 64 do not interfere with the engaging protrusions 61 and 62 projecting from the upper pavement board 2 and the lower pavement board 3, respectively. It can pass through the joint holes 11, 110.
  • the joint member 64 When the joint member 64 is passed through the joint holes 11 and 110 formed in the upper pavement board 2 and the lower pavement board 3 as described above, the joint member 64 is moved in the direction of the arrow as shown in FIG. 18 (D).
  • the engaging protrusions 64B and 64C projecting above and below the connecting member 64 are engaged with the engaging protrusions 61 and 62 projecting from the upper pavement board 2 and the lower pavement board 3, respectively. ..
  • the joint is formed as shown in FIG. 18 (E). Since a gap is formed between the member 64 and the joint holes 11 and 110, the wedge member 65 is inserted into this gap from above. At this time, the two fitting protrusions 65a projecting from the wedge member 65 are fitted into the two fitting grooves 64a formed in the joint member 64, and the wedge member 65 is moved downward while maintaining this state. Type in.
  • the inside of the joint holes 11 and 110 of the joint member 64 is as shown in FIG.
  • the upper and lower engaging protrusions 64B and 64C of the joint member 64 are securely engaged with the engaging protrusions 61 and 62 of the upper pavement board 2 and the lower pavement board 3 because the movement is prevented and fixed. Therefore, the upper pavement board 2 and the lower pavement board 3 are securely connected by the joint member 64.
  • 19 (A) is a plan view of a receiving member used for the connecting structure of the upper pavement board and the lower pavement board according to the third embodiment
  • 19 (B) is a sectional view taken along line A7-A7 of FIG. 19 (A).
  • 19 (C) is a perspective view of the receiving member
  • FIG. 17 (D) is an enlarged detailed view of the Y1 portion of FIG. 17 (B)
  • FIG. 20 (A) is an upper pavement and a lower pavement according to the third embodiment.
  • a plan view of the joint member used for the connecting structure with the panel FIG. 20 (B) is a front view of the joint member
  • FIG. 20 (C) is a perspective view of the same piece member
  • FIG. 20 (D) is FIG. 20 (B).
  • 21 (A) to (F) which are enlarged detailed views of the Y2 portion of (1), are partial cross-sectional views showing the procedure for connecting the upper pavement and the lower pavement in the order of the steps in the connection structure according to the third embodiment.
  • the upper pavement board 2 and the lower pavement board 3 are connected at four places similar to those shown in FIGS. 5 and 14, but the connecting structure of only one place will be described below. To do.
  • the receiving member 71 shown in FIG. 19 and the joint member 72 shown in FIG. 20 are used.
  • the receiving member 71 and the joint member 72 are both integrally molded of resin.
  • the receiving member 71 is formed in a cup shape, and extends from the circular bottom surface portion 71A and the bottom surface portion 71A while increasing the diameter toward the upper side of FIG. 19 (B). It includes a tapered cylindrical side surface portion 71B and a low-height cylindrical portion 71C that rises in parallel from the side surface portion 71B to form an opening peripheral edge of the receiving member 71.
  • a plurality of protrusions 71a having a chevron-shaped cross section are formed on the inner circumference of the cylindrical portion 71C of the receiving member 71 over the entire circumference.
  • the joint member 72 includes a disc portion 72A and a cylindrical portion 72B extending vertically from the center of the upper and lower surfaces of the disc portion 72A, and the disc portion 72A and the upper and lower cylindrical portions.
  • the 72B is connected to each other by a plurality of triangular reinforcing ribs 72C (10 in the illustrated example).
  • the plurality of (10) reinforcing ribs 72C are radially arranged at an equal angle pitch (36 ° pitch) in the circumferential direction.
  • the outer diameter ⁇ D of the disk portion 72A of the joint member 72 is set to be slightly smaller than the inner diameter ⁇ d of the cylindrical portion 71C of the receiving member 71 ( ⁇ D ⁇ d).
  • a plurality of protrusions 72a having a chevron-shaped cross section are formed on the outer circumference of the disk portion 72A over the entire circumference.
  • the receiving member 71 is embedded and fixed in advance on the upper surface of the lower pavement board 3, and the lower half of the joint member 72 is fitted into the receiving member 71 from above. Both are combined as shown in 21 (B).
  • a plurality of protrusions 71a are formed on the inner peripheral surface of the cylindrical portion 71C of the receiving member 71 over the entire circumference, and a plurality of similar protrusions 72a are also formed on the outer circumference of the disc portion 72A of the joint member 72. Since these protrusions 71a and 72a are fitted to each other, the joint member 72 can be prevented from coming off from the receiving member 71. In this state, the joint member 72 is connected to and fixed to the receiving member 71 with its upper half protruding upward from the upper surface of the lower pavement board 3.
  • the upper pavement board 2 to which the other receiving member 71 is pre-embedded and fixed with the opening facing down is positioned and lowered toward the lower pavement board 3. ..
  • the upper pavement board 2 is superposed on the lower pavement board 3, and one receiving member 71, which is received and fixed by the upper pavement board 2, is a joint member. Since it is fitted into the upper half of 72, the upper pavement board 2 and the lower pavement board 3 are connected to each other by the joint member 72.
  • a plurality of protrusions 71a see FIG.
  • the multi-layer precast pavement road includes a plurality of precast lower-layer pavement 2 (including the hollow pavement 1) laid on the roadbed 6 and the lower-layer pavement.
  • a plurality of precast upper-layer pavement boards 3 (including end lower-layer pavement boards 4) laid on the upper surface of the board 2 are provided, and the lower-layer pavement board 3 and the upper-layer pavement board 2 are staggered.
  • a joint member 5 (64, 72) is provided so as to straddle the upper and lower joint surfaces of the lower pavement board 3 and the upper pavement board 2, and the lower pavement of the joint member 5 (64, 72) is provided. Since the lower pavement board 3 and the upper pavement board 2 are connected and configured by engaging or fitting the board 3 with the upper pavement board 2, the following effects are obtained.
  • the multi-layer precast pavement road according to the present invention is the same as the precast multi-layer upper pavement 2 (including the hollow pavement 1) and the precast lower pavement 3 (including the end lower layer pavement 4).
  • the two-dimensionally adjacent objects are not directly connected to each other, and the plurality of upper pavement boards 2 (hollow pavement board 1) and the plurality of lower layer pavement boards 3 (end lower layer pavement board 4) constituting the upper and lower layers are connected. Since the structure is such that three-dimensionally contacted objects are connected to each other by joint members 5 (64, 72) at a plurality of points, even if the roadbed 6 or the roadbed 7 supporting the pavement is deformed. ,
  • the upper pavement plate 2 (hollow pavement 1) straddling the joint portion eases the bending of the joint portion between the lower layer pavement 3 (end lower layer pavement 4), and a step is generated in the multi-layer precast pavement road. Absent.
  • the upper pavement 2 (hollow pavement 1) and the lower pavement 3 (end lower pavement 4) are both precast and have a two-layer upper and lower structure, new construction is also repaired. It can be easily carried out without being affected by the weather or causing noise problems, and it is possible to provide a multi-layer precast paved road having excellent durability.
  • both the upper pavement 2 (hollow pavement 1) and the lower pavement 3 (lower end pavement 4) are made of precast, the pavements 1 to 4 used for construction are planned in advance at the factory. It can be manufactured and stocked, and even if urgent repair work is required, it will be possible to respond easily and promptly.
  • the construction is a construction form in which the pavement boards 1 to 4 of each layer are lifted one by one by a crane and laid on the roadbed 6, the heavy machinery dedicated to pavement and the pavement technology that have been used in the past are acquired. Construction is possible without a skilled engineer.
  • the repair can be completed by removing and replacing the paved board of the damaged part, so that the repair work can be carried out in a short time with low noise. It is possible.
  • the upper pavement 2 (hollow pavement 1) is arranged in a staggered pattern with respect to the lower pavement 3 (end lower pavement 4) laid on the roadbed 6. Since these are connected by the joint member 5 (64, 72), no step is generated.
  • a pavement board having various functions as the upper pavement board 2 for example, rainwater can be efficiently drained, a coil for non-contact power feeding can be provided, and chargeability and banding can be achieved. It is possible to improve the magnetism, and it is possible to easily construct a paved road having functions not found in conventional paved roads.
  • joint member 5 (64, 72) is made of plastic, a plastic composite material, or the like, these will not rust and their durability will be enhanced. Then, by using the joint member 5 (64, 72) for connecting the upper pavement 2 (hollow pavement 1) and the lower pavement 3 (end lower pavement 4), these joint members 5 (64, 72) does not loosen during use like bolts and nuts, and the upper pavement (hollow pavement 1) can be easily attached to and detached from the lower pavement 3 (end lower pavement 4).

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

【課題】上層舗装盤と下層舗装盤とを継手部材を用いて簡易に連結することができ、組み立てと取り外しを多くの工数を要することなく簡単かつ迅速に行うことができるとともに、段差が生じることがない複層プレキャスト舗装道路を提供すること。 【解決手段】路盤6の上に敷設されたプレキャスト製の複数の下層舗装盤3と、該下層舗装盤3の上面に敷設されたプレキャスト製の複数の上層舗装盤2と、を備える複層プレキャスト舗装道路を、前記下層舗装盤3と前記上層舗装盤2とを千鳥状に配置するとともに、前記下層舗装盤3と前記上層舗装盤2の上下接合面に跨って介在する継手部材5を設け、該継手部材5の前記下層舗装盤2と前記上層舗装盤2との係合または嵌合によってこれらの下層舗装盤3と上層舗装盤2とを連結して構成する。

Description

複層プレキャスト舗装道路
 本発明は、複層プレキャスト舗装道路に関する。
 従来の舗装道路は、加熱アスファルト混合物やレディミックスコンクリート等の舗装材を、それぞれの専用の舗装機械を用いて敷き均し、必要に応じて転圧し、その後、養生して硬化させて作られている。
 舗装道路は、供用して経年すると劣化が進むが、劣化が進んだ場合には、交通を規制し、バックホウ、ブレーカ等の専用機械によって劣化部分のみならず広範囲の舗装材を剥ぎ取り、新たな舗装材によって再施工する必要があった。
 しかし、舗装道路の補修を含む施工には次のような問題がある。まず、雨天時には舗装材の硬化不良が生じるため、工事ができなかった。また、舗装材は調製してから使用可能な時間が限られているため、舗装材の調製時期や搬入時期を含む計画を立案するのが難しかった。さらに、補修等における舗装材の剥ぎ取りには大きな騒音が発生し、近隣住民等に迷惑が掛かるために工事時間帯にも制約があった。
 一方、公知の舗装材を使用しない道路として、鋼製やFRPの箱体内に発泡スチロールを充填してプレキャスト舗装盤のような外観を呈する敷設部材を形成し、この敷設部材を上層と下層の敷設部材が千鳥状をなす態様で路盤上に配置し、上層と下層の敷設部材をボルト・ナットのような締結具によって上下方向で締結した土木工事現場用の仮設道路が提案されている(例えば、特許文献1参照)。
 しかし、上記仮設道路は、鋼製やFRPの箱状体の内部に発泡スチロールを充填した構造を有しているため、たとえ内部に補強構造が付与されていても、強度面から一般道路や高速道路での使用は事実上不可能である。しかも、上層と下層の敷設部材の結合は、ボルトとナットによる締結であるため、組み立て、取り外しの何れにおいても多くの工数が掛かり、また、ボルトとナットの締結は振動によって緩み易いため、何れにしても頻繁に車両が走行する一般道路には不向きであり、ましてや高速道路には適用できない。
特開平8-326007号公報
 そこで、本発明は、上層舗装盤と下層舗装盤とを継手部材を用いて簡易に連結することができ、組み立てと取り外しを多くの工数を要することなく簡単かつ迅速に行うことができるとともに、段差が生じることのない複層プレキャスト舗装道路を提供することを目的とする。
 上記目的を達成するため、本発明は、路盤の上に敷設されたプレキャスト製の複数の下層舗装盤と、該下層舗装盤の上面に敷設されたプレキャスト製の複数の上層舗装盤と、を備える複層プレキャスト舗装道路であって、前記下層舗装盤と前記上層舗装盤とを千鳥状に配置するとともに、前記下層舗装盤と前記上層舗装盤の上下接合面に跨って介在する継手部材を設け、該継手部材の前記下層舗装盤と前記上層舗装盤との係合または嵌合によってこれらの下層舗装盤と上層舗装盤とを連結して構成されることを特徴とする。
 本発明によれば、上層舗装盤と下層舗装盤とを継手部材を用いて簡易に連結することができ、組み立てと取り外しを多くの工数を要することなく簡単かつ迅速に行うことができるとともに、複層プレキャスト舗装道路に段差が生じることがないという効果が得られる。
本発明の実施の形態1に係る複層プレキャスト舗装道路の構成を説明するための分解部分斜視図である。 本発明の実施の形態1に係る複層プレキャスト舗装道路の排水構造を示す部分断面図である。 本発明の実施の形態2に係る複層プレキャスト舗装道路の構成を説明するための分解部分斜視図である。 本発明の実施の形態2に係る複層プレキャスト舗装道路の上層舗装盤の一部を構成する空洞舗装盤の斜視図である。 本発明の実施の形態2に係る複層プレキャスト舗装道路の空洞舗装盤に設けられた複数の継手孔の配置例を示す平面図である。 図4のA1-A1線断面図である。 空洞舗装盤の他の形態を示す平面図である。 (A)は図4の矢視X1方向の図、(B)は図4のA2-A2線断面図である。 実施の形態2に係る継手部材の一例を示す斜視図である。 実施の形態1に係る連結構造における空洞舗装盤及び上層舗装盤と下層舗装盤及び端部下層舗装盤の上下連結前の継手部材との関係を示す断面図である。 実施の形態2に係る連結構造における空洞舗装盤及び上層舗装盤と下層舗装盤及び端部下層舗装盤とを継手部材で連結した状態の関係を示す断面図である。 継手部材の取外し具の一例を示す斜視図である。 図12のA4-A4線断面図である。 実施の形態2に係る連結構造において上層舗装盤と下層舗装盤に設けられた複数の継手孔の配置例を示す平面図である。 実施の形態2に係る連結構造を示す分解斜視図である。 (A)は上層舗装盤の部分平面図、(B)は同上層舗装盤の部分底面図、(C)は(A)のA5-A5線断面図である。 (A)は下層舗装盤の部分平面図、(B)は(A)のA6-A6線断面図である。 (A)~(F)は実施の形態2に係る連結構造において上層舗装盤と下層舗装盤との連結手順をその工程順に示す部分断面図である。 実施の形態3に係る上層舗装盤と下層舗装盤との連結構造に用いられる受け部材の平面図、(B)は(A)のA7-A7線断面図、(C)は(B)のY1部の拡大詳細図である。 実施の形態3に係る上層舗装盤と下層舗装盤との連結構造に用いられる継手部材の平面図、(B)は同継手部材の正面図、(C)は(B)のY2部の拡大詳細図である。 (A)~(D)は実施の形態3に係る連結構造において上層舗装盤と下層舗装盤との連結手順をその工程順に示す部分断面図である。
 以下に本発明の実施の形態を添付図面に基づいて説明する。
[複層プレキャスト舗装道路]
 <実施の形態1>
 図1は本発明の実施の形態1に係るプレキャスト舗装道路の構成を説明するための分解部分斜視図であり、図示の複層プレキャスト舗装道路は、路床7の上に設けられた路盤6の上に敷き詰められるプレキャスト製の舗装盤である矩形プレート状の複数の下層舗装盤3及び端部下層舗装盤4と、このように敷き詰められた下層舗装盤3と端部下層舗装盤4の上に重ねられるプレキャスト製の舗装盤である矩形プレート状の複数の上層舗装盤2を備えている。ここで、複数の上層舗装盤2は、複数の下層舗装盤3及び端部下層舗装盤4に対して千鳥状に配置されており、これらの上層舗装盤2と下層舗装盤3及び端部下層舗装盤4とは、複数の継手部材5によって上下方向に連結(締結)されている。
 本発明で使用する上層舗装盤2、下層舗装盤3、端部下層舗装盤4は、本発明の複層プレキャスト舗装道路の施工前に、予め公知プレキャスト工法によって成形されるものである。なお曲線部の施工では、前記の矩形プレート状の舗装盤のほかに、図示しないが、走行方向(前後方向)の前後端面がテーパー状の舗装盤や前後端面で略楔状に形成された補助舗装盤を用いることがある。矩形プレート状の舗装盤とテーパー面を有する舗装盤の接合部分はボルトやダウエルピンで繋ぐ。また前記路盤6に不陸がある場合には、その不陸整正のために緩い砂を撒くが、本発明では例えばアスファルトシートをロール状に巻き取った不陸整正材を搬入し、前記路盤6の不陸部分に展開して敷設することができる。
 ところで、本発明に係る複層プレキャスト舗装道路は、敷き詰められた下層舗装盤3において隣接する下層舗装盤3,3同士を上層舗装盤2が跨いで連結(締結)されることを基本形態としている。このため、図1に示す例では、各4枚の下層舗装盤3と端部下層舗装盤4の上に、同じ枚数の上層舗装盤2を上下に千鳥状に重ねて連結(締結)することによって一定幅の複層プレキャスト舗装道路が施工される。なお、道路幅は線形に応じて変わり、軌跡となる車両通行位置も道路の線形とは必ずしも一致しない。このため、上層舗装盤2と下層舗装盤3及び端部下層舗装盤4の千鳥状配置や端部では、下層舗装盤3と端部下層舗装盤4の2枚を上層舗装版2の1枚が跨ぐ形で敷設することができたとしても、道路幅の変化や線形と一致しない車両通行位置等によって上下層舗装盤2~4の寸法違いに起因して上層舗装盤2の側に半端が生じた場合には、半端用の上層舗装盤2を調整し、この上層舗装盤2を用いて下層舗装盤3と端部下層舗装盤4の上で前記の半端を調整することができる。
 なお、本実施の形態において「千鳥状に配置する」とは、下層に敷かれた下層舗装盤3及び端部下層舗装盤4の合わせ目(目地)に、これらの下層舗装盤3と端部下層舗装盤4の上に敷かれる上層舗装盤2の合わせ目(目地)が重ならないように、上層舗装盤2と下層舗装盤3及び端部下層舗装盤4との互いの合わせ目(目地)をずらして配置することを言う。
 ところで、図1に例示した複層プレキャスト舗装道路においては、上層舗装盤2と下層舗装盤3及び端部下層舗装盤4として、平面形状と大きさが同じ矩形状のものを用いたが、上層と下層で大きさの異なる舗装盤を用いることもできる。また、図1に示す例では、道路幅方向において敷設した下層舗装盤3と端部下層舗装盤4の4枚の上に4枚の上層舗装盤2を敷設しているが、本発明に係る複層プレキャスト舗装道路において、2枚の下層舗装盤3の上に上層舗装盤2が跨る形で上層舗装盤2と下層舗装盤3及び端部下層舗装盤4を配置する形態には様々のものがある。
 なお、本実施の形態に係る複層プレキャスト舗装道路に用いられる上層舗装版2と下層舗装盤3及び端部下層塗装盤4は、平面視矩形又は四角形が基本形状であるが、下層舗装盤3には平面形状が矩形や四角形以外の多角形のプレキャスト舗装盤を用いることができる。
 (複層プレキャスト舗装道路の排水構造)
 ここで、複層プレキャスト舗装道路の排水構造の一例を図2に基づいて以下に説明する。
 図2は本発明に係る複層プレキャスト舗装道路の排水構造を示す部分断面図であり、同図に示すように、上層にポーラスコンクリート等の透水性コンクリートによって構成された上層舗装盤2を用いた場合、雨水は矢印X3に示すように上層舗装盤2の内部を路側の側溝9に向かって流れ、下層舗装盤3と端部下層舗装盤4から路盤6に水が浸透することなく、効率よく側溝9へと排水することが可能となる。
 <実施の形態2>
 次に、本発明に係る複層プレキャスト舗装道路の実施の形態2を図3に基づいて以下に説明する。
 図3は本発明の実施の形態2に係る複層プレキャスト舗装道路の構成を説明するための分解部分斜視図である。なお、図3においては、図1において示したものと同一要素には同一符号を付しており、以下、それらについての再度の説明は省略する。
 本発明の実施の形態2に係るプレキャスト舗装道路は、路床7の上に設けられた路盤6の上に敷き詰められる矩形プレート状の複数の下層舗装盤3及び端部下層舗装盤4と、このように敷き詰められた下層舗装盤3と端部下層舗装盤4の上に重ねられる矩形プレート状の複数の上層塗装盤2及び空洞舗装盤1を備えている。ここで、空洞舗装盤1は、図1に示す複層プレキャスト舗装道路において幅方向略中央に位置する上層舗装盤2に代えて設けられるものであって、その内部には道路延伸方向に貫通する空洞12が貫設されている。なお、本実施の形態に係る複層プレキャスト舗装道路の他の構成は、前記実施の形態1に係る複層プレキャスト舗装道路の構成と同じであるため、これについての再度の説明は省略する。
 ところで、空洞舗装盤1の敷設位置は、道路の幅方向略中央部に限らず、例えば、路肩やその他の部位に配置してもよい。また、本実施の形態では、空洞舗装盤1及び上層舗装盤2と下層舗装盤3及び端部下層舗装盤4として、平面形状と大きさが同じ矩形状のものを用いたが、上層と下層で大きさの異なる舗装盤を用いることもできる。また、空洞舗装盤1としては、図3に例示したものより幅が狭いものを用いてもよい。さらに、本実施の形態に係る複層プレキャスト舗装道路においては、空洞舗装盤1が下層舗装盤3を跨ぐことなく、上層舗装盤2の間を空洞舗装盤1が埋める形に配置されるなど、空洞舗装盤1を含む上層舗装盤2と下層舗装盤3及び端部下層舗装盤4の上下層の配置には様々な配置態様が考えられる。
 なお、本実施の形態に係る複層プレキャスト舗装道路においては、空洞舗装盤1及び上層舗装盤2と下層舗装版3及び端部下層舗装盤4として、平面視矩形または四角形を基本形状とするものを用いたが、下層舗装版3には平面形状が矩形や四角形以外の多角形のプレキャスト舗装盤を用いることができる。
 (空洞舗装盤の構成)
 ここで、空洞舗装盤1の構成を図4に基づいて以下に説明する。
 図4は本発明の実施の形態2に係る複層プレキャスト舗装道路の上層舗装盤の一部を構成する空洞舗装盤の斜視図である。
 図4に例示した空洞舗装盤1は、横断方向の断面が略矩形で平面視ほぼ長方形状をなし、これには厚み方向に貫通する丸孔状の継手孔11と、道路伸延方向に貫通する空洞12が形成されている。ここで、空洞12は、この例では平行に2つ設けられており、これら2つの空洞12の間には、道路伸延方向に仕切る仕切壁13が設けられている。なお、空洞舗装盤1の平面大きさや空洞12の断面形状と大きさは、本実施の形態において例示したものに限るものではない。
 図5は空洞舗装盤1に設けられた複数(図示例では、4つ)の継手孔11の配置例を示す平面図である。本実施の形態においては、他の舗装盤(上層舗装盤2と下層舗装盤3及び端部下層舗装盤4)にも同じ配置パターンで継手孔11(110:図10及び図11参照)がそれぞれ形成されている。なお、下層舗装盤3と端部下層舗装4にそれぞれ形成される後述の継手孔110(図10及び図11参照)は、当該下層舗装盤3と端部下層舗装盤4を上下方向に貫通しない仕様であることが好ましい。空洞舗装盤1を含む上層舗装盤2側からの雨水等が継手孔110を通って路盤6に流入するのを防ぐためである。
 図4及び図5に示すように、空洞舗装盤1には、一例として4つの継手孔11が設けられているが、各継手孔11は、空洞舗装盤1の平面視が矩形である場合、この矩形を左右に2等分する直線L1と、上下に2等分する直線L2によって区画される4つの長方形の第1の対角線L3と第2の対角線L4との交点にそれぞれ形成されている。
 上述のように各舗装盤(空洞舗装盤1、上層舗装盤2、下層舗装盤3及び端部下層舗装盤4)にそれぞれ同じ配置パターンで4つの継手孔11(110)を配置すると、本発明に係る複層プレキャスト舗装道路の下層に配置される下層舗装盤3及び端部下層舗装盤4と上層に配置される空洞舗装盤1及び上層舗装盤2とを千鳥状に配置する場合、下層に配置される下層舗装盤3及び端部下層舗装盤4の継手孔110と、上層に配置される空洞舗装盤1及び上層舗装盤2の継手孔11とが対応する同軸上の位置に配置されるため、空洞舗装盤1及び上層舗装盤2と下層舗装盤3及び端部下層舗装盤4とを継手部材5によって上下方向に連結(締結)することができる。
 本実施の形態における継手孔11(110)の位置は、以上において説明した位置の他、上載荷重等を考慮して舗装盤の内側又は外側に寄せて配置してもよい。また、継手孔11(110)の数も4つに限られるものではなく、舗装盤(空洞舗装盤1及び上層舗装盤2と下層舗装盤3及び端部下層舗装盤4)の大きさによって4つより多い場合、或いは4つより少ない場合もある。
 図6は図4のA1-A1線断面図であり、同図に示すように、図4に示した空洞舗装盤1は、空洞12の開口部の端面を周回するように設けられた溝部15に止水シール14が設けられている。ここで、止水シール14は、膨脹部14Aと、該膨脹部14Aを覆う親水部14Bとを備えている。なお、本実施の形態では、膨脹部14Aには、例えば発泡ウレタンを道路伸延方向に圧縮したものが用いられるが、膨脹部14Aには発泡ウレタン以外の素材を用いることができる。また、親水部14Bには、例えば親水性ウレタンなど、水に接触したときに膨脹する素材が用いられるが、水に接触して膨脹する素材であれば親水性ウレタンに限らず他の材料を用いてもよい。
 従って、空洞舗装盤1同士を道路伸延方向に接続した場合、接続部分に雨水が浸み込んでも止水シール14が道路伸延方向に膨脹するため、雨水の空洞12の内部への浸み込みが防がれる。
 (空洞舗装盤の他の形態)
 ここで、空洞舗装盤の他の形態を図7に基づいて以下に説明する。
 図7は空洞舗装盤の他の形態を示す平面図であり、図示例では、空洞舗装盤1には非接触給電用コイル91が配置されている。
 図7に示すように、空洞舗装盤1は、空洞12の内部に非接触給電用コイル91を配置してモジュール化することができる。この場合、隣接する非接触給電用コイル91同士は適宜の方法によって接続される。ここで、空洞舗装盤1は、止水シール14を有しているため、非接触給電用コイル91は雨水等によって濡れることがない。
 なお、空洞舗装盤1は、非接触給電用コイル91以外にも電源線、通信線等のケーブルを空洞12に配置し、ケーブル付舗装盤としてモジュール化することも可能である。
 (上層舗装盤と下層舗装盤との連結構造)
 <連結構造の実施の形態1>
 図8(A)は図4の矢視X1方向の図、図8(B)は図4のA2-A2線断面図であり、図8(B)に示すように、空洞舗装盤1は、継手孔11を形成する筒状の周壁16と、継手孔11の上下方向における周壁16の内面の中間付近に設けられた円弧状の突起部17を備えている。
 上記周壁16は、空洞12の内部に配置され、平面視が略円形をなし、上下方向に延びている。また、突起部17は、周壁16に沿って該周壁16の内部を周回し、周回方向の一部に一対の切欠き17Aを有している。
 空洞舗装盤1は、道路としての十分な成形強度を発揮する合成樹脂によって形成されている。この合成樹脂としては、例えばFRPや各種高強度プラスチック(PAI,PEEK等)があり、合成樹脂製の他に炭素繊維補強コンクリート製やFRP鉄筋コンクリ―ト製のものも用いることができる。このように、空洞舗装盤1の素材として合成樹脂を使用することによって、高い水密性と非導電性及び非磁性を得ることができ、空洞12の内部に非接触給電用コイルを配置することが可能となる。
 本発明における上層舗装盤2と下層舗装盤3は、前記空洞舗装盤1の空洞12が無い断面を充実形態にし、継手孔11と同様の継手孔110を設けたプレキャストコンクリート製である他は、空洞舗装盤1の外形と同様の形態である。従って、継手孔110も、円弧状の突起部170と一対の切欠き170Aを備えている。
 端部下層舗装盤4は、一例として前記下層舗装盤3を平面視において上下に略2等分した形態を有するが、端部下層舗装盤4の平面形状はこの例に限るものではない。なお、下層舗装盤3及び端部下層舗装盤4は、これらが敷き詰められた場合に互いに接触する側面に、互いに対向するように、親水性ポリウレタン等の水膨脹性樹脂によって構成されたシールを備えていることが望ましい。
 上層舗装盤2は、例えば水を透すポーラスコンクリート製や走行騒音を低減することができるポーラス構造、或いは表面にスリットを配した構造とすることができる。下層舗装盤3及び端部下層舗装盤4は、鉄筋コンクリート、鋼繊維強化コンクリート、または繊維補強コンクリートを用いて形成することができる。なお、上層舗装盤2にも鉄筋コンクリート、鋼繊維強化コンクリートまたは繊維補強コンクリートを用いることができる。下層舗装盤3と端部下層舗装盤4にコンクリート素材を用いることによって、本発明に係る複層プレキャスト舗装道路は、舗装道路としての強さと耐久性とを具備することができる。なお、本発明を橋梁に適用する場合には、桁に施工された床盤を敷き詰めた下層舗装盤3に見立て、床盤の上に空洞舗装盤1を含む上層舗装盤2を直接接続することができ、端部下層舗装盤4を含む下層舗装盤3を省くことができる。
 図9は継手部材5の一例を示す斜視図であり、図示の継手部材5は、略円柱状をなす本体部51と、該本体部51の上端に配置された円柱状の基部52と、略傘状の可変ロック部53と、下方へと延びる脚部55と、該脚部55の周方向に相対向して一体に突設された略凸状の一対のフランジ部56を備えている。
 上記基部52は、その直径が本体部51の直径よりも小さく設定されており、前記可変ロック部53は、下端の直径が基部52の直径よりも大きく本体部51の直径よりも小さく設定されており、その直径は、上方に向かって次第に小さくなっている。そして、この可変ロック部53には、その上端部から基部52の途中まで切り欠かれたスリット状の4つの切欠き溝部54が周方向に等角度ピッチ(90°ピッチ)で形成されている。つまり、上下方向に長く形成されたスリット状の切欠き溝部54は、略傘状の可変ロック部53及び基部52を周方向に4分割するように形成されている。
 また、前記脚部55は、本体部51の直径よりも小さい直径を有して下方へと延びている。そして、脚部55の周方向に相対向して一体に形成された一対のフランジ部56は、本体部51の直径と同じ直径(外接円直径)を有しており、継手孔110(11)における突起部170(17)の切欠き170A(17A)を通過することができる平面形状を有している。なお、本体部51の下端面とフランジ部56の上端面との間の距離(脚部55の見た目の長さ)は、突起部170(17)の厚さより僅かに大きく設定されている。
 継手部材5は、下層舗装盤3及び端部下層舗装盤4に形成された4つの継手孔110に対して着脱可能に設置され、空洞舗装盤1及び上層舗装盤2に形成された4つの継手孔11において略傘状の可変ロック部53が空洞舗装盤1又は上層舗装盤2の装着許容と脱却規制を制御する。なお、可変ロック部53は、略傘状の形態に限られない。例えば、突起部17の内周の断面形状が逆テーパ状であれば、可変ロック部53は略傘状ではなく、切欠き溝部54を有する略円柱状で足りるからである。なお、継手部材5は、プラスチック、金属またはこれらの複合材によって構成することができる。
 図10は空洞舗装盤1及び上層舗装盤2と下層舗装盤3及び端部下層舗装盤4の上下連結前の継手部材5との関係を示す断面図、図11は空洞舗装盤1及び上層舗装盤2と下層舗装盤3及び端部下層舗装盤4とを継手部材5で連結(締結)した状態の関係を示す断面図である。
 図10に示すように、継手部材5は、その下部の一対のフランジ部56が、下層舗装盤3及び端部下層舗装盤4の継手孔110の突起部170に形成された切欠き170Aを通過して当該突起部170の奥に挿入され、その後、軸回りに例えば角度90°回転されることによって、フランジ部56が下層舗装盤3及び端部下層舗装盤4の突起部170に係合して上方向にも下方向にも抜けなくなる。
 上記状態において、空洞舗装盤1または上層舗装盤2を、これに形成された継手孔11に継手部材5が嵌まるように上方から載置する。すると、継手部材5は、切欠き溝部54を有する略傘状の可変ロック部53を備えているため、この可変ロック部53の切欠き溝部54が突起部17によって押し縮められると、略傘状の可変ロック部53は、突起部17の間に入り込み、可変ロック部53の下端部53Aが突起部17を通過した時点で開く。
 略傘状の可変ロック部53の下端部53Aの直径は、一対の突起部17の外接円の直径よりも大きいため、継手部材5に嵌まった空洞舗装盤1または上層舗装盤2が上方向に抜けなくなる。これによって空洞舗装盤1を含む上層舗装盤2は、継手部材5を介して端部下層舗装盤4を含む下層舗装盤3に緊締結合されて上下2層をなす上層舗装盤(空洞舗装盤1を含む)2と下層舗装盤(端部下層舗装盤4を含む)3とが結合一体化される。
 なお、本発明に係る複層プレキャスト舗装道路において使用される継手部材5は、本実施の形態において使用したものに限らない。例えば、図示しないが、継手部材5に設けられた略傘状の可変ロック部53に代えて、当該継手部材5の下部に形成された脚部55とその周上に設けられた略凸状のフランジ部56とを、上下対称な向きで本体部51の上部に設けた形態の継手部材を用いることができる。また、継手部材では、その中心軸上に貫通孔等の治具用孔を設け、この治具用孔に継手部材を回転させるための治具を保持させる形態を採ることもできる。可変ロック部には、それ自体が変形してロック機能を果たすものと、それ自体が変位してロック機能を果たすものが考えられる。
 図12は継手部材5の取外し具8の一例を示す斜視図、図13は図12のA4-A4線断面図である。
 取外し具8は、図12に示すように、下方に向かって直径が次第に大きくなる空洞部84(図13参照)を下端面に開口させた押圧部81と、該押圧部81の下端部に対向して設けられた一対の引掛け突起部83と、押圧部81の上端部に設けられたフック82とを備えている。
 ここで、取外し治具8の空洞部84の最大直径は、略傘状の可変ロック部53の最大直径と同じかやや小さい。また、空洞部84の上下方向の長さは、略傘状の可変ロック部53の上下方向の長さと同じかやや長く、図13に示すように、空洞部84は、縦断面において内側に凸となる曲面を有している。
 そして、引掛け突起部83の一端から他端までの長さは、継手孔11の直径とほぼ等しい。また、押圧部81の外径は、突起部17の外接円の直径よりも若干小さい。
 空洞舗装盤1又は上層舗装盤2を継手部材5から外すためには、取外し具8を空洞部84に略傘状の可変ロック部53が嵌まるように上から押圧する。
 略傘状の可変ロック部53は切欠き溝部54を有するため、この可変ロック部53が空洞部84に押されて切欠き溝部54が径方向に縮まり、略傘状の可変ロック部53の下端部53Aと突起部17との係合が解除される。
 上記状態において、引掛け突起部83を突起部17と干渉しない向きにして下方へとさらに押し込み、引掛け突起部83が突起部17を越えた時点で取外し具8を回転させると、引掛け突起部83が突起部17に係合する。そして、この状態から、フック82に掛けたワイヤー等によって取外し具8を上方に引っ張り上げると、空洞舗装盤1又は上層舗装盤2を継手部材5から外すことができる。この作業を空洞舗装盤1又は上層舗装盤2の4箇所の継手孔11において行い、空洞舗装盤1又は上層舗装盤2を、端部下層舗装盤4を含む下層舗装盤3から分離させることができる。
 <連結構造の実施の形態2>
 次に、上層舗装盤2と下層舗装盤3との連結構造の実施の形態2を図14~図18に基づいて以下に説明する。
 図14は実施の形態2に係る連結構造において上層舗装盤と下層舗装盤に設けられた複数の継手孔の配置例を示す平面図、図15は実施の形態2に係る連結構造を示す分解部分斜視図、図14(A)は上層舗装盤の部分平面図、図14(B)は同上層舗装盤の部分底面図、図14(C)は図14(A)のA5-A5線断面図、図15(A)は下層舗装盤の部分平面図、図15(B)は図15(A)のA6-A6線断面図、図16(A)~(F)は実施の形態2に係る連結構造において上層舗装盤と下層舗装盤との連結手順をその工程順に示す部分断面図である。
 本実施の形態に係る連結構造においては、図14に示すように、上層舗装盤2と下層舗装盤3の4箇所(実施の形態1と同じ箇所(図5参照))に平面視長方形の継手孔11,110(図14には一方のみ図示)が上下方向に貫設されている(下層舗装盤3に形成された継手孔110については図15及び図17参照)。なお、以下においては1箇所の継手孔11,110の周辺の構造について図示及び説明するが、他の箇所の継手孔11,110の周辺の構造も同じであるため、これについての図示と説明は省略する。
 図16に示すように、上層舗装盤2に形成された平面視長方形の継手孔11においては、短辺側の面(図16の右端面)の下半部には矩形ブロック状の係合凸部61が一体に形成されている。また、上層舗装盤2の下面には、継手孔11の係合凸部61に対向する短辺側の面から継手孔11の長手方向(図16の左方)に延びる平面視矩形の係合凹部62が形成されている。
 他方、図17に示すように、下層舗装盤3に形成された平面視長方形の継手孔110においては、短辺側の面(図17の右端面)の上半部には矩形ブロック状の係合凸部63が一体に形成されている。
 ところで、上層舗装盤2と下層舗装盤3との連結には、図15に示す樹脂製の継手部材64と楔部材65が用いられる。ここで、継手部材64は、四角柱状の本体部64Aと、該本体部64の同一面の上下端から同方向に水平かつ一体に突出する矩形ブロック状の係合突起64B,64Cを備えており、本体部64Aの係合凸部64Aが形成された側とは反対側の面には、2本のスリット状の嵌合溝64aが幅方向に適当な間隔で上下方向に貫設されている。
 また、楔部材65は、上下方向に長い矩形平板状の本体部65Aを備えており、該本体部64Aの長辺側の一端面からは上下方向に長い矩形リブ状の2枚の嵌合突起65aが一体に突設されている。ここで、2本の嵌合突起65aは、後述のように継手部材64に形成された2本の嵌合溝64aに嵌合するものであって、幅方向7嵌合溝64aと同一ピッチで配置されている。
 次に、上記継手部材64と楔部材65を用いて上層舗装盤2と下層舗装盤3とを連結する手順を図18(A)~(F)に従って説明する。
 先ず、図18(A)に示すように、先端部がL字状に屈曲した吊下げ具100を上層舗装盤2の継手孔11に上方から挿入し、その先端部を上層舗装盤2の係合凹部62に係合させる。そして、その状態で吊下げ具100を引き上げて上層舗装盤2を水平に吊下げる。そして、この上層舗装盤2を予め敷設されている下層舗装盤3の上に移動させ、これに形成された継手孔11と下層舗装盤3に形成された継手孔110が合致するように位置決めした状態で当該上層舗装盤2を降ろし、図18(B)に示すように、当該上層舗装盤2を下層舗装盤3の上に重ねる。なお、図18(B)に示す各部の高さ寸法h1,h2,h3は、図15に示す継手部材64の各部寸法h1,h2,h3に略一致し、上層舗装盤2と下層舗装盤3の高さの合計値Hは、継手部材64と楔部材65の高さHに略一致する。
 図18(B)に示すように、下層舗装盤3の上に上層舗装盤2が重ねられ、両者にそれぞれ形成された継手孔11,110同士が合致した状態から、図18(C)に示すように、継手部材64を上層舗装盤2と下層舗装盤3にそれぞれ形成された継手孔11,110に上方から挿入して通す。このとき、継手部材64は、これの上下に突設された係合突起64B,64Cが上層舗装盤2と下層舗装盤3にそれぞれ突設された係合凸部61,62と干渉することなく継手孔11,110を通過することができる。
 上述のようにして継手部材64が上層舗装盤2と下層舗装盤3にそれぞれ形成された継手孔11,110に通されると、図18(D)に示すように、継手部材64を矢印方向に水平移動させ、該連結部材64の上下に突設された係合突起64B,64Cを上層舗装盤2と下層舗装盤3にそれぞれ突設された係合凸部61,62にそれぞれ係合させる。
 継手部材64の上下の係合突起64B,64Cが上層舗装盤2と下層舗装盤3の各係合凸部61,62に完全に係合すると、図18(E)に示すように、該継手部材64の継手孔11,110との間に隙間が形成されるため、この隙間に楔部材65を上方から差し込む。このとき、楔部材65に突設された2本の嵌合突起65aを継手部材64に形成された2本の嵌合溝64aに嵌合させ、この状態を維持しつつ楔部材65を下方へと打ち込む。
 上述のようにして楔部材65が継手部材64と継手孔11,110との間の隙間に完全に打ち込まれると、図18(F)に示すように、継手部材64の継手孔11,110内での移動が阻止されて固定されるため、該継手部材64の上下の係合突起64B,64Cが上層舗装盤2と下層舗装盤3の各係合凸部61,62に確実に係合するため、上層舗装盤2と下層舗装盤3とが継手部材64によって確実に連結される。
 <連結構造の実施の形態3>
 次に、空洞舗装盤1を含む上層舗装盤2と端部下層舗装盤4を含む下層舗装盤3との連結構造の実施の形態3を図19~図21に基づいて以下に説明する。
 図19(A)は実施の形態3に係る上層舗装盤と下層舗装盤との連結構造に用いられる受け部材の平面図、19(B)は図19(A)のA7-A7線断面図、図19(C)は同受け部材の斜視図、図17(D)は図17(B)のY1部の拡大詳細図、図20(A)は実施の形態3に係る上層舗装盤と下層舗装盤との連結構造に用いられる継手部材の平面図、図20(B)は同継手部材の正面図、図20(C)は同駒部材の斜視図、図20(D)は図20(B)のY2部の拡大詳細図、図21(A)~(F)は実施の形態3に係る連結構造において上層舗装盤と下層舗装盤との連結手順をその工程順に示す部分断面図である。
 本実施の形態に係る連結構造においても、上層舗装盤2と下層舗装盤3とは図5及び図14に示したと同様の4箇所において連結されるが、以下、1箇所のみの連結構造について説明する。
 本実施の形態に係る連結構造においては、図19に示す受け部材71と図20に示す継手部材72とが使用される。ここで、受け部材71と継手部材72は、共に樹脂によって一体成形されている。
 受け部材71は、図19に示すように、カップ状に成形されており、これには円形の底面部71Aと、該底面部71Aから図19(B)の上方に向かって拡径しながら延びるテーパ円筒状の側面部71Bと、該側面部71Bから平行に立ち上がって当該受け部材71の開口部周縁を形成する高さの低い円筒部71Cとを備えている。ここで、図19(D)に詳細に示すように、受け部材71の円筒部71Cの内周には、断面山形の複数の突起71aが全周に亘って形成されている。
 継手部材72は、図20に示すように、円板部72Aと、該円板部72Aの上下面の中心から垂直に延びる円筒部72Bとを備えており、円板部72Aと上下の円筒部72Bとは、三角状の複数枚(図示例では、10枚)の補強リブ72Cによってそれぞれ連結されている。ここで、複数枚(10枚)の補強リブ72Cは、周方向に等角度ピッチ(36°ピッチ)で放射状に配置されている。また、継手部材72の円板部72Aの外径φDは、前記受け部材71の円筒部71Cの内径φdよりも僅かに小さく設定されている(φD<φd)。さらに、円板部72Aの外周には、図20(D)に詳細に示すように、断面山形の複数の突起72aが全周に亘って形成されている。
 次に、以上のように構成された受け部材71と継手部材72を用いて上層舗装盤2と下層舗装盤3とを連結する手順を図21(A)~(D)に従って以下に説明する。
 図21(A)に示すように、受け部材71は、下層舗装盤3の上面に予め埋め込まれて固定されており、この受け部材71に継手部材72の下半部を上方から嵌め込んで図21(B)に示すように両者を結合する。このとき、受け部材71の円筒部71Cの内周面には複数の突起71aが全周に亘って形成され、継手部材72の円板部72Aの外周にも同様の複数の突起72aが全周に亘って形成されているため、これらの突起71a,72a同士が嵌合することによって継手部材72の受け部材71からの抜けが防がれる。この状態では、継手部材72は、その上半部が下層舗装盤3の上面から上方に突出した状態で受け部材71に連結されて固定されている。
 次に、図21(C)に示すように、もう1つの受け部材71が開口部を下にして予め埋め込まれて固定された上層舗装盤2が位置決めされて下層舗装盤3に向かって降ろされる。すると、図21(D)に示すように、上層舗装盤2が下層舗装盤3の上に重ねられるとともに、該上層舗装盤2に受け込まれて固定されている一方の受け部材71が継手部材72の上半部に嵌め込まれるため、上層舗装盤2と下層舗装盤3とが継手部材72によって互いに連結される。このとき、受け部材71の円筒部71Cの内周面には複数の突起71a(図19(C)参照)が全周に亘って形成され、継手部材72の円板部71Aの外周にも同様の複数の突起72a(図20(D)参照)が全周に亘って形成されているため、これらの突起71a,72a同士が嵌合することによって上層舗装盤2と下層舗装盤3とが継手部材72によって一層確実に連結される。
[発明の効果]
 以上の説明で明らかなように、本発明に係る複層プレキャスト舗装道路は、路盤6の上に敷設されたプレキャスト製の複数の下層舗装盤2(空洞舗装盤1を含む)と、該下層舗装盤2の上面に敷設されたプレキャスト製の複数の上層舗装盤3(端部下層舗装盤4を含む)と、を備えるものであって、前記下層舗装盤3と前記上層舗装盤2とを千鳥状に配置するとともに、前記下層舗装盤3と前記上層舗装盤2の上下接合面に跨って介在する継手部材5(64,72)を設け、該継手部材5(64,72)の前記下層舗装盤3と前記上層舗装盤2との係合または嵌合によってこれらの下層舗装盤3と上層舗装盤2とを連結して構成されるため、以下の効果を奏する。
 すなわち、本発明に係る複層プレキャスト舗装道路は、プレキャスト製の複層の上層舗装盤2(空洞舗装盤1を含む)と同じくプレキャスト製の下層舗装盤3(端部下層舗装盤4を含む)を、二次元的に隣り合うもの同士は直接結合せず、上下層を構成する複数の上層舗装盤2(空洞舗装盤1)と複数の下層舗装盤3(端部下層舗装盤4)とを三次元的に接し、かつ、三次元的に接するもの同士を継手部材5(64,72)によって複数箇所で連結する構造としたため、仮に舗装を支える路盤6や路床7に変形が生じても、下層舗装盤3(端部下層舗装盤4)同士の接合部分の折曲を当該接合部分を跨ぐ上層舗装版2(空洞舗装盤1)が緩和し、当該複層プレキャスト舗装道路に段差が生じない。
 また、上層舗装万2(空洞舗装盤1)と下層舗装盤3(端部下層舗装盤4)が共にプレキャスト製で上下2層構造のプレキャスト舗装道路であるため、新規施工も修復等の再施工も天候に左右されたり、騒音問題を起こすことなく簡便に行うことができ、耐久性に優れた複層プレキャスト舗装道路を提供することができる。
 さらに、上層舗装盤2(空洞舗装盤1)と下層舗装盤3(端部下層舗装盤4)が共にプレキャスト製であるため、施工に使用する舗装盤1~4を事前に計画的に工場で製造してストックしておくことができ、緊急な修復施工等が入っても容易且つ迅速な対応が可能となる。
 また、施工は、各層の舗装盤1~4を1枚ごとクレーンによって吊り上げて路盤6に敷設していく工事形態であるため、従来使用していた舗装専用の重機や、舗装技術を習得している技術者がいなくても施工が可能となる。
 そして、本発明に係る複層プレキャスト舗装道路の一部が破損した場合には、その破損した部分の舗装盤を外して取り換えれば修復が済むため、修復工事でも低騒音で短期間に施工が可能である。
 さらに、本発明に係る複層プレキャスト舗装道路においては、路盤6に敷き詰める下層舗装盤3(端部下層舗装盤4)に対して上層舗装盤2(空洞舗装盤1)を千鳥状に配置してこれらを継手部材5(64,72)によって連結するために段差が生じない。
 また、上層舗装盤2(空洞舗装盤1)として種々の機能を有する舗装盤を用いることによよって、例えば雨水を効率よく排水したり、非接触給電用のコイルを設けたり、帯電性、帯磁性を改善したりすることが可能となり、従来の舗装道路にはない機能を備えた舗装道路を容易に施工することが可能となる。
 その他、継手部材5(64,72)をプラスチックやプラスチック複合材等によって構成すれば、これらが錆びることがなく、その耐久性が高められる。そして、上層舗装盤2(空洞舗装盤1)と下層舗装盤3(端部下層舗装盤4)との連結に継手部材5(64,72)を用いることによって、これらの継手部材5(64,72)がボルトとナットのように使用中に緩むことがなく、下層舗装盤3(端部下層舗装盤4)への上層舗装盤(空洞舗装盤1)の着脱が容易となる。
 なお、本発明は、以上説明した実施の形態に適用が限定されるものではなく、特許請求の範囲及び明細書と図面に記載された技術的思想の範囲内で種々の変形が可能であることは勿論である。
 1      空洞舗装盤
 2      上層舗装盤
 3      下層舗装盤
 4      端部下層舗装盤
 5      継手部材
 6      路盤
 7      路床
 8      取外し具
 9      側溝
 11,110 継手孔
 12     空洞
 13     仕切壁
 14     止水シール
 14A    膨脹部
 14B    親水部
 15     溝部
 16     側壁
 17,170 突起部
 51     本体部
 52     基部
 53     略傘状の可変ロック部
 54     溝部
 55     脚部
 56     フランジ部
 61,63  係合凸部
 64     継手部材
 65     楔部材
 71     受け部材
 72     継手部材
 81     押圧部
 82     フック
 83     引掛け突起部
 84     空洞部
 91     非接触給電用コイル

Claims (9)

  1.  路盤の上に敷設されたプレキャスト製の複数の下層舗装盤と、該下層舗装盤の上面に敷設されたプレキャスト製の複数の上層舗装盤と、を備える複層プレキャスト舗装道路であって、
     前記下層舗装盤と前記上層舗装盤とを千鳥状に配置するとともに、
     前記下層舗装盤と前記上層舗装盤の上下接合面に跨って介在する継手部材を設け、該継手部材の前記下層舗装盤と前記上層舗装盤との係合または嵌合によってこれらの下層舗装盤と上層舗装盤とを連結して構成されることを特徴とする複層プレキャスト舗装道路。
  2.  前記下層舗装盤の下面と前記上層舗装盤の上面にカップ状の受け部材をそれぞれ埋め込んで固定し、両受け部材に前記継手部材の上半部と下半部を前記受け部材にそれぞれ嵌合させることによって、前記下層舗装盤と前記上層舗装盤とを連結することを特徴とする請求項1に記載の複層プレキャスト舗装道路。
  3.  前記下層舗装盤と前記上層舗装盤に互いに連通する継手孔をそれぞれ形成し、両継手孔に挿通する前記継手部材の上端部と下端部を前記下層舗装盤と前記上層舗装盤にそれぞれ係合させることによって、前記下層舗装盤と前記上層舗装盤とを連結することを特徴とする請求項1に記載の複層プレキャスト舗装道路。
  4.  前記継手部材の上端部に略傘状の可変ロック部を形成し、前記下層舗装盤に形成された前記継手孔に挿通して該下層舗装盤の上面から上方へ突出する前記継手部材の前記可変ロック部を前記上層舗装盤の係合部に係合させることによって、前記下層舗装盤と前記上層舗装盤とを連結することを特徴とする請求項3に記載の複層プレキャスト舗装道路。
  5.  前記継手部材を、これの上下端部にそれぞれ形成された係合突起と前記各継手孔にそれぞれ突設された係合凸部との干渉を避けながら両継手孔に通した後、該継手部材を移動させて前記係合突起を前記係合凸部に係合させ、前記継手孔と前記継手部材との間に形成される隙間に楔部材を打ち込むことによって、前記下層舗装盤と前記上層舗装盤とを連結することを特徴とする請求項3に記載の複層プレキャスト舗装道路。
  6.  前記上層舗装盤の一部は、
     道路伸延方向に貫通する空洞を有し、前記空洞の開口部を周回するように止水シールを備えた空洞舗装盤で構成されることを特徴とする請求項1~5の何れかに記載の複層プレキャスト舗装道路。
  7.  前記空洞舗装盤は、プラスチック、炭素繊維補強コンクリート、FRP鉄筋コンクリートの何れかによって構成され、前記空洞の内部に配置される非接触給電用コイルを備えることを特徴とする請求項6に記載の複層プレキャスト舗装道路。
  8.  前記上層舗装盤は、透水性の素材、又はポーラス構造かスリット表面の走行音低減性の素材によって構成されることを特徴とする請求項1~7の何れかに記載の複層プレキャスト舗装道路。
  9.  前記下層舗装盤は、隣接する前記下層舗装盤と対向する側面に止水シールを有することを特徴とする請求項1~8の何れかに記載の複層プレキャスト舗装道路。
PCT/JP2020/000261 2019-03-28 2020-01-08 複層プレキャスト舗装道路 Ceased WO2020194987A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP20776392.1A EP3922771A4 (en) 2019-03-28 2020-01-08 MULTI-LAYER PREFABRICATED ROAD
CA3132794A CA3132794C (en) 2019-03-28 2020-01-08 Multilayer precast paved road
US17/429,684 US12392093B2 (en) 2019-03-28 2020-01-08 Multilayer precast paved road
JP2020500908A JP7396978B2 (ja) 2019-03-28 2020-01-08 複層プレキャスト舗装道路

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019063082 2019-03-28
JP2019-063082 2019-03-28

Publications (1)

Publication Number Publication Date
WO2020194987A1 true WO2020194987A1 (ja) 2020-10-01

Family

ID=72610880

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/000261 Ceased WO2020194987A1 (ja) 2019-03-28 2020-01-08 複層プレキャスト舗装道路

Country Status (4)

Country Link
US (1) US12392093B2 (ja)
EP (1) EP3922771A4 (ja)
JP (1) JP7396978B2 (ja)
WO (1) WO2020194987A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115058933A (zh) * 2022-05-20 2022-09-16 安徽久传建筑工程有限公司 一种市政道路铺设结构
JP2023022886A (ja) * 2021-08-04 2023-02-16 フジミ工研株式会社 Pca部材を用いた橋梁用伸縮装置及びその施工方法
JP2023166787A (ja) * 2022-05-10 2023-11-22 株式会社大林組 給電装置の埋設構造及び給電装置の埋設方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021187862A1 (ko) * 2020-03-16 2021-09-23 엘지전자 주식회사 무선 통신 시스템에서 공간 파라미터 기반 신호 송수신 방법 및 장치

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS637402A (ja) * 1986-06-27 1988-01-13 大高 英昭 敷設ブロツク
JPH0288804A (ja) * 1988-09-24 1990-03-29 Nishiki Kogyo Kk ロードヒーティングの施工方法
JPH0653606U (ja) * 1992-12-17 1994-07-22 株式会社イノアックコーポレーション 弾性舗装材
JPH07324302A (ja) * 1994-06-01 1995-12-12 Yamau:Kk 透水性ゴム舗装コンクリート板
JPH08326007A (ja) 1995-05-31 1996-12-10 Fukudagumi:Kk 仮設道路
JPH09316805A (ja) * 1996-05-28 1997-12-09 Hiroshi Igarashi ブロックとブロックアレイ
JPH10325102A (ja) * 1997-05-27 1998-12-08 Inax Corp 舗装構造

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US340153A (en) * 1886-04-20 Aethue pimm
US1411415A (en) * 1920-12-11 1922-04-04 Ralph M Cooley Pavement
FR584067A (ja) 1923-07-03 1925-01-29
US2282335A (en) * 1933-05-10 1942-05-12 Clyde L Methven Expansion joint construction
US2700329A (en) * 1946-05-18 1955-01-25 John E Carter Elastomeric strip for vertical pavement joints
US2508443A (en) * 1946-08-20 1950-05-23 John E Carter Sealed joint for concrete slab road pavements
US4488833A (en) * 1982-04-27 1984-12-18 Kaiser Aluminum & Chemical Corporation Rapidly deployed assault vehicle surfacing or trackway system
US4522531A (en) * 1983-05-18 1985-06-11 Thomsen Bernard D Transverse joint cell for concrete structures
US5664899A (en) * 1991-07-22 1997-09-09 Eustis; Robert H. Furniture joint
US5816738A (en) * 1996-10-03 1998-10-06 Abo System-Elemente Gmbh Composite synthetic material tile and suitable laying system and laying plate therefor
AT407777B (de) * 1999-04-26 2001-06-25 Blum Gmbh Julius Verbindungsbeschlag zum lösbaren verbinden zweier möbelteile
GB2375131A (en) * 2001-04-24 2002-11-06 Anthony Crabbe Ground cover panel
US7314333B2 (en) * 2003-08-13 2008-01-01 Shaw & Sons, Inc. Plate concrete dowel system
KR20090001058U (ko) * 2007-07-26 2009-02-02 배석호 석재 판넬
US9546044B2 (en) * 2008-02-06 2017-01-17 Oldcastle Precast, Inc. Method and apparatus for capturing, storing, and distributing storm water
KR20130050445A (ko) * 2011-11-08 2013-05-16 태양 박 조립식 도로
US20130326966A1 (en) * 2012-06-12 2013-12-12 The Spancrete Group, Inc. Precast pervious concrete panels
US9206596B1 (en) * 2015-03-10 2015-12-08 Schul International, Inc. Expansion joint seal system
US20160355997A1 (en) * 2015-06-04 2016-12-08 James Curtis Lewley Method of retrofitting a ground surface to resist snow and ice
JP6834877B2 (ja) * 2017-09-20 2021-02-24 トヨタ自動車株式会社 非接触給電システム及び受電側装置
DE202018004468U1 (de) * 2018-09-25 2018-10-29 Peter Nägele Zerlegbare Bodenplatte
US10794055B1 (en) * 2019-04-09 2020-10-06 Schul International Company, LLC Composite joint seal
US11766947B2 (en) * 2021-05-28 2023-09-26 Zoox, Inc. DC fast charger wireless-charging adapter

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS637402A (ja) * 1986-06-27 1988-01-13 大高 英昭 敷設ブロツク
JPH0288804A (ja) * 1988-09-24 1990-03-29 Nishiki Kogyo Kk ロードヒーティングの施工方法
JPH0653606U (ja) * 1992-12-17 1994-07-22 株式会社イノアックコーポレーション 弾性舗装材
JPH07324302A (ja) * 1994-06-01 1995-12-12 Yamau:Kk 透水性ゴム舗装コンクリート板
JPH08326007A (ja) 1995-05-31 1996-12-10 Fukudagumi:Kk 仮設道路
JPH09316805A (ja) * 1996-05-28 1997-12-09 Hiroshi Igarashi ブロックとブロックアレイ
JPH10325102A (ja) * 1997-05-27 1998-12-08 Inax Corp 舗装構造

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023022886A (ja) * 2021-08-04 2023-02-16 フジミ工研株式会社 Pca部材を用いた橋梁用伸縮装置及びその施工方法
JP7718898B2 (ja) 2021-08-04 2025-08-05 フジミ工研株式会社 Pca部材を用いた橋梁用伸縮装置及びその施工方法
JP2023166787A (ja) * 2022-05-10 2023-11-22 株式会社大林組 給電装置の埋設構造及び給電装置の埋設方法
JP7815981B2 (ja) 2022-05-10 2026-02-18 株式会社大林組 給電装置の埋設構造及び給電装置の埋設方法
CN115058933A (zh) * 2022-05-20 2022-09-16 安徽久传建筑工程有限公司 一种市政道路铺设结构
CN115058933B (zh) * 2022-05-20 2023-11-03 安徽久传建筑工程有限公司 一种市政道路铺设结构

Also Published As

Publication number Publication date
EP3922771A1 (en) 2021-12-15
US12392093B2 (en) 2025-08-19
JP7396978B2 (ja) 2023-12-12
CA3132794A1 (en) 2020-10-01
US20220205187A1 (en) 2022-06-30
EP3922771A4 (en) 2022-11-09
JPWO2020194987A1 (ja) 2020-10-01

Similar Documents

Publication Publication Date Title
WO2020194987A1 (ja) 複層プレキャスト舗装道路
JP2016037746A (ja) 道路橋の埋設継手構造とその施工法
JP6097965B2 (ja) 橋梁用コンクリートプレキャスト床版の施工方法
US20170022726A1 (en) Prefabricated, deconstructable, multistory building construction
KR20110132909A (ko) 기성 콘크리트 말뚝을 이용한 지하차도 및 그의 시공방법
KR20060082832A (ko) 높이조절식 프리캐스트 콘크리트 패널과 이를 이용한도로보수공법
KR100687211B1 (ko) 프리캐스트 콘크리트 패널을 이용한 도로 포장방법
KR101544985B1 (ko) 소켓식 프리캐스트 콘크리트 패널 및 이를 이용한 포장공법
CA3132794C (en) Multilayer precast paved road
JP3037442B2 (ja) 構造材及びその接合方法
JP2016108812A (ja) 鉄筋コンクリート床版を用いた橋梁における連結構造及び鉄筋コンクリート床版を用いた既設橋梁における連結工法
JP6896981B2 (ja) 仮舗装版、仮舗装構造、及び仮舗装構造構築方法
CA2965450C (en) System, apparatus and related method for raised ground cover mat
US10995456B2 (en) Modular roundabout system with interconnectable boards
US20120286055A1 (en) Systems and related methods involving isolation tubs
JP2016075046A (ja) 既設道路橋の拡幅方法
JP7272307B2 (ja) 道路の構造
JP2009127316A (ja) 鋼管による橋梁用床版と橋梁用床版構造および鋼管
KR20180138034A (ko) 프리캐스트 콘크리트 옹벽
JP2019078003A (ja) 道路ユニットによる舗装道路構造体ならびに舗装道路の施工方法および補修方法
KR102801635B1 (ko) 도로 포장용 프리캐스트 패널 및 이를 이용한 급속 도로 포장 공법
KR100646870B1 (ko) 조립식 콘크리트 거푸집 및 그 설치공법
JP2020190133A (ja) 道路施工方法および道路構造
JP7561635B2 (ja) コンクリート部材、コンクリート部材継手構造、及びコンクリート部材接合方法
CN223548589U (zh) 一种边坡防护结构

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2020500908

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20776392

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 3132794

Country of ref document: CA

ENP Entry into the national phase

Ref document number: 2020776392

Country of ref document: EP

Effective date: 20210907

NENP Non-entry into the national phase

Ref country code: DE

WWG Wipo information: grant in national office

Ref document number: 17429684

Country of ref document: US