CH243536A - Method of manufacturing a concrete chamber for water turbines. - Google Patents

Method of manufacturing a concrete chamber for water turbines.

Info

Publication number
CH243536A
CH243536A CH243536DA CH243536A CH 243536 A CH243536 A CH 243536A CH 243536D A CH243536D A CH 243536DA CH 243536 A CH243536 A CH 243536A
Authority
CH
Switzerland
Prior art keywords
chamber
concrete
spiral
turbine
ring
Prior art date
Application number
Other languages
German (de)
Inventor
Grzywienski Anton Ing Dr
Original Assignee
Grzywienski Anton Ing Dr
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Grzywienski Anton Ing Dr filed Critical Grzywienski Anton Ing Dr
Publication of CH243536A publication Critical patent/CH243536A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Hydraulic Turbines (AREA)

Description

  

  Verfahren zur Herstellung einer Betonkammer für     Wasserturbinen.       Die Wasserzuführung zu den Turbinen  kann je nach Gefälle und Grösse der Anlage  auf verschiedene     Weise    erfolgen. Bei     kleinen     Anlagen und niederem Gefälle steht     bei-          spielsweise    die Turbine in einer     einfachen     prismatischen Kammer, während sie bei den  grössten Gefällen in einem     Stahlgussgehäuse     untergebracht     wird.     



  Bei grossen     Niederdruckanlagen    ist es     heute     üblich,     sogenannte    Betonspiralen zur Erzie  lung einer hydraulisch     günstigen    Wasser  zuführung vorzusehen. Die Decke dieser  Spirale hat aus Gründen der Zugänglichkeit  der     Turbinenteile        in    der Mitte eine Öffnung  und ist an den Wänden aufgelagert     bezw.     mit diesen steif verbunden.  



  Die     Übertragung    der Kräfte     infolge          Eigengewicht,    Maschinenlast und Wasser  druck ,erfolgt entweder durch die Spiralen  decke unmittelbar auf die     Seitenwände    oder  bei grösseren Anlagen zum Teil auch über  einzelne Punkte, die am Umfang der mittle-         ren    Öffnung der Spirale als sogenannte       Stützschaufeln    angeordnet sind.  



  Solange der Wasserdruck im Innern der  Spirale     gering    ist,     überwiegt    in allen Be  triebsfällen das     Eigengewicht    und die Ma  schinenlast derart,     da.ss    die     Stützschaufeln     nur Druck     erhalten.    Bei grösseren Innen  drücken und schwächeren     Spiralendecken    da  gegen kann es vorkommen, dass in den Stütz  schaufeln bedeutende Zugkräfte auftreten,  die zu baulichen     Schwierigkeiten    führen und  eine besondere     Verankerung    zur     Überleitung     der Zugkräfte in den Beton erfordern.  



  Bei der Ausführung kleiner Kraftwerke  geht man im Turbinenbau meist so vor, dass  im Unterbau knappe     Aussparungen    frei  gelassen werden, die gerade zum späteren  Versetzen der     Eisenteile    genügen.  



  Bei grossen     Turbinen    kann man diesen  Bauvorgang zwar auch     beibehalten,    er er  fordert aber eine übermässig starke Aus  bildung der als     Kragplatte    wirkenden     Spi-          ralendecke,    oder man behilft sich in der      Weise, dass man die Decke     bis        zum    Einbau  der Turbinenteile provisorisch abstützt.

   In  beiden Fällen erhalten die später zu     ver-          setzenden    Stützschaufeln der Turbine keine       nennenswerte    Belastung durch die Spiralen  decke, um den bei hohen     Innendrücken    auf  die Stützschaufeln zur     Geltung    kommenden  Zugkräften     entgegenwirken    zu können.  



  Man hat     daher    die Turbinenkammer zu  nächst nur     bis    zur Höhe des     untern        Traver-          senringes    betoniert, dann einen Teil der Tur  binenmontage (die sogenannte     Vormontage)          durchgeführt    und nachher erst die Kammer  samt     Spiralendecke        bezw.    den übrigen Teil  des Kraftwerkes hergestellt.

   Durch diese  Bauweise werden zwar die     Stützschaufeln    im       Betrieb    tatsächlich entlastet, doch hat sie  den Nachteil, dass die Baudurchführung  durch die     Turbinenmontage    auf längere Zeit       unterbrochen    werden muss und überdies der  Baufortschritt vom rechtzeitigen Anliefern  der Eisenteile abhängig ist.  



  Das Verfahren zur Herstellung einer Be  tonkammer für     Wasserturbinen    gemäss der       Erfindung    besteht nun darin, dass die Beton  kammer zunächst ohne Kammerdecke und       Betonstützring    für den     Traversenring    hoch  geführt, später der     Stützring    für den     Tra-          versenring    und nach erfolgtem Zusammen  bau der Turbine die Kammerdecke betoniert       wird.    Der Einbau der Turbinenteile kann  also zu beliebiger Zeit später begonnen und  in einem Zuge bis zur Höhe des Schacht  ringes fortgeführt werden.  



  Auf der Zeichnung 'ist eine beispielsweise  Ausführungsform einer nach dem erfin  dungsgemässen Verfahren hergestellten Tur  binenkammer     veranschaulicht,    und zwar  zeigt     Fig.    1 einen Längsschnitt durch die  Turbinenkammer nach Linie     A-B    der       Fig.    2 und     Fig.    2 einen Schnitt nach Linie       C-D    der     Fig.    1.  



  Die Turbine besteht     in    bekannter Art  aus dem Laufrad 1, den Leitschaufeln 2 und  den Stützschaufeln 3, auf welchen der obere         Traversenring    4 aufliegt     und    die auf dem  unteren     Traversenring    5 aufruhen. Die     Tra-          versenringe    4 und 5 sind vermittels der     Eisen;     6     bezw.    7 verankert. Das Laufrad 1     liegt     unterhalb des     Schachtringes    8 und oberhalb  des Saugstutzens 9, wobei das Laufrad 1  von dem     Laufradring    10 ummantelt ist.  



  Der Betonaufbau besteht aus der Spiralen  decke 11, der     Spiralenwand    12, dem Saug  rohr 13 und dem Einlauf 14. Die Spiralen  wand 1 2 umschliesst die Spirale 15.    Wie das dargestellte     Ausführungsbeispiel     zeigt, wird die     Betonarbeit    in der Weise  durchgeführt, dass     bis    auf die Spiralen  decke 11 und den     meistens    niedrigen     Beton-          abstützring    16 für den     Traversenring    5 der  in der Zeichnung schraffiert     angedeutete    Be  tonbau einschliesslich des Einlaufes 14,

   der       Spiralenwand    12 und des Saugrohres 13 in  einem Arbeitsgang fertiggestellt wird. Die       Spiralenivand    12 kann an der     Einbaustelle     für -die erst später herzustellende Spiralen  decke 11 einen Ansatz a tragen. Demzufolge  kann die Baudurchführung unabhängig von  der Anlieferung der Eisenteile erfolgen und  wird durch die     Vormontage    nicht unter  brochen.



  Method of manufacturing a concrete chamber for water turbines. The water supply to the turbines can take place in different ways depending on the gradient and size of the system. In the case of small systems and low gradients, for example, the turbine is located in a simple prismatic chamber, while in the case of the greatest gradients it is housed in a cast steel housing.



  In large low-pressure systems, it is now common practice to provide so-called concrete spirals to achieve a hydraulically favorable water supply. The ceiling of this spiral has an opening in the middle for reasons of accessibility of the turbine parts and is supported BEZW on the walls. rigidly connected to these.



  The forces due to its own weight, machine load and water pressure are transmitted either through the spiral cover directly to the side walls or, in larger systems, sometimes via individual points that are arranged on the circumference of the central opening of the spiral as so-called support blades.



  As long as the water pressure inside the spiral is low, the dead weight and the machine load predominate in all operating cases, so that the support blades only receive pressure. With larger internal pressures and weaker spiral ceilings, on the other hand, it can happen that significant tensile forces occur in the support blades, which lead to structural difficulties and require special anchoring to transfer the tensile forces into the concrete.



  When constructing small power plants, the turbine construction usually proceeds in such a way that tight recesses are left free in the substructure, which are just sufficient for later relocating the iron parts.



  In the case of large turbines, this construction process can be retained, but it requires an excessively strong formation of the spiral ceiling, which acts as a cantilever plate, or one helps oneself by temporarily supporting the ceiling until the turbine parts are installed.

   In both cases, the turbine support blades that are later to be relocated do not receive any significant load from the spiral cover in order to be able to counteract the tensile forces exerted on the support blades at high internal pressures.



  The turbine chamber has therefore initially only been concreted up to the level of the lower traverse ring, then part of the turbine installation (the so-called pre-installation) has been carried out and only afterwards the chamber including the spiral ceiling and / or. the remaining part of the power plant produced.

   This design actually relieves the load on the support blades during operation, but it has the disadvantage that the construction work has to be interrupted for a long time by installing the turbine and, moreover, the progress of construction depends on the timely delivery of the iron parts.



  The method for producing a concrete chamber for water turbines according to the invention is that the concrete chamber is first led up without the chamber ceiling and concrete support ring for the truss ring, later the support ring for the truss ring and, after the turbine has been assembled, the chamber ceiling is concreted . The installation of the turbine parts can therefore be started at any time later and continued in one go up to the height of the manhole ring.



  In the drawing, an exemplary embodiment of a turbine chamber produced by the method according to the invention is illustrated, namely FIG. 1 shows a longitudinal section through the turbine chamber along line AB of FIG. 2 and FIG. 2 shows a section along line CD of FIG .



  The turbine consists in a known manner of the impeller 1, the guide vanes 2 and the support vanes 3, on which the upper traverse ring 4 rests and which rest on the lower traverse ring 5. The truss rings 4 and 5 are made by means of irons; 6 resp. 7 anchored. The impeller 1 lies below the manhole ring 8 and above the suction connection 9, the impeller 1 being encased by the impeller ring 10.



  The concrete structure consists of the spiral ceiling 11, the spiral wall 12, the suction pipe 13 and the inlet 14. The spiral wall 1 2 encloses the spiral 15. As the illustrated embodiment shows, the concrete work is carried out in such a way that up to the Spiral ceiling 11 and the mostly low concrete support ring 16 for the traverse ring 5 of the concrete structure indicated by hatching in the drawing including the inlet 14,

   the spiral wall 12 and the suction tube 13 is completed in one operation. The spiral vand 12 can carry an approach a at the installation point for the spiral ceiling 11 to be produced later. As a result, the construction work can be carried out independently of the delivery of the iron parts and is not interrupted by the pre-assembly.

 

Claims (1)

PATENTANSPRUCH: Verfahren zur Herstellung einer Beton kammer für Wasserturbinen, dadurch ge kennzeichnet, da.ss die Betonkammer zunächst ohne Kammerdecke und Betonstützring für den Traversenring hochgeführt, später der Abstützring für den Traversenring und erst nach erfolgtem Zusammenbau der Turbine die Kammerdecke betoniert wird. PATENT CLAIM: A method for producing a concrete chamber for water turbines, characterized in that the concrete chamber is initially raised without the chamber ceiling and concrete support ring for the truss ring, later the support ring for the truss ring and the chamber ceiling is concreted only after the turbine has been assembled. UNTERANSPRUCH: Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass. an der Kammerwand: zum späteren Anschluss der Kammerdecke ein Ansatz mitbetoniert wird. SUBSTANTIAL CLAIM: Method according to patent claim, characterized in that. On the chamber wall: for the later connection of the chamber ceiling, an approach is concreted together.
CH243536D 1943-03-24 1944-03-20 Method of manufacturing a concrete chamber for water turbines. CH243536A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE243536X 1943-03-24

Publications (1)

Publication Number Publication Date
CH243536A true CH243536A (en) 1946-07-31

Family

ID=5921283

Family Applications (1)

Application Number Title Priority Date Filing Date
CH243536D CH243536A (en) 1943-03-24 1944-03-20 Method of manufacturing a concrete chamber for water turbines.

Country Status (1)

Country Link
CH (1) CH243536A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1080935B (en) * 1953-06-12 1960-04-28 Arno Fischer Underwater power plant with a water pipe arranged horizontally or inclined

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1080935B (en) * 1953-06-12 1960-04-28 Arno Fischer Underwater power plant with a water pipe arranged horizontally or inclined

Similar Documents

Publication Publication Date Title
CH243536A (en) Method of manufacturing a concrete chamber for water turbines.
AT166599B (en) Construction process for the production of a concrete chamber for water turbines
DE536716C (en) Turbine or pump system with suction lifters in the inlet and outlet
DE633650C (en) Water turbine system with horizontally arranged turbine and vertical machine shaft as well as dammed inlet
AT38332B (en) Process for the production of gas containers with a guide frame mounted independently of the pool wall.
DE888609C (en) Arrangement for water distribution in swimming pools
CH332618A (en) Steam turbine group with bleed steam feed water preheater
DE845996C (en) Tower cleaning system for coal distillation gases or the like.
CH85186A (en) High pressure turbine system with an open shaft.
DE2525909C3 (en) Sewage treatment plant
GB1425589A (en) Reservoir for water supply plant
DE402023C (en) Hydraulic air compressor
DE155384C (en)
AT111926B (en) Anchoring the pipes of flue gas feed water preheaters to the chambers.
DE347457C (en) Sluice with superimposed savings basins and common circulation shaft
DE202127C (en)
AT42821B (en) Method of building bells and iron basins of gas containers.
CH409801A (en) Process for the production of sewage digesters and sewage digesters produced according to the method
DE2300895A1 (en) ARRANGEMENT WITH A SELF-SUPPORTING FRAME CONSTRUCTION FOR A MOBILE, FULLY ASSEMBLED, INSTALLABLE HEATING CENTER, IN PARTICULAR FOR TRANSPORT AND WEATHER PROTECTION
AT62082B (en) Concrete pillars.
AT78238B (en) Walling for high-performance boilers.
CH425634A (en) Method for manufacturing a tank system and tank system manufactured according to the method
DE929444C (en) Guide structure for shaft conveyor systems