JPH0347340B2 - - Google Patents

Info

Publication number
JPH0347340B2
JPH0347340B2 JP15406387A JP15406387A JPH0347340B2 JP H0347340 B2 JPH0347340 B2 JP H0347340B2 JP 15406387 A JP15406387 A JP 15406387A JP 15406387 A JP15406387 A JP 15406387A JP H0347340 B2 JPH0347340 B2 JP H0347340B2
Authority
JP
Japan
Prior art keywords
loom
upper limit
arrangement
weaving
limit value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP15406387A
Other languages
English (en)
Japanese (ja)
Other versions
JPS646154A (ja
Inventor
Hiroichi Maeba
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kanebo Ltd
Original Assignee
Kanebo Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kanebo Ltd filed Critical Kanebo Ltd
Priority to JP15406387A priority Critical patent/JPS646154A/ja
Publication of JPS646154A publication Critical patent/JPS646154A/ja
Publication of JPH0347340B2 publication Critical patent/JPH0347340B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Looms (AREA)
JP15406387A 1987-06-19 1987-06-19 織機配台計画自動作成装置 Granted JPS646154A (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15406387A JPS646154A (ja) 1987-06-19 1987-06-19 織機配台計画自動作成装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15406387A JPS646154A (ja) 1987-06-19 1987-06-19 織機配台計画自動作成装置

Publications (2)

Publication Number Publication Date
JPS646154A JPS646154A (ja) 1989-01-10
JPH0347340B2 true JPH0347340B2 (ar) 1991-07-19

Family

ID=15576088

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15406387A Granted JPS646154A (ja) 1987-06-19 1987-06-19 織機配台計画自動作成装置

Country Status (1)

Country Link
JP (1) JPS646154A (ar)

Also Published As

Publication number Publication date
JPS646154A (ja) 1989-01-10

Similar Documents

Publication Publication Date Title
Prasad et al. A framework for lean manufacturing implementation in Indian textile industry
Rice Productivity and social organization in an Indian weaving shed: An examination of some aspects of the socio-technical system of an experimental automatic loom shed
Harris Packing method for resource leveling (PACK)
Graves et al. Scheduling of re-entrant flow shops
Chen et al. A multiobjective evaluation of flexible manufacturing system loading heuristics
US5170554A (en) High mix printed circuit assembly technique
US4956784A (en) Apparatus and a method for controlling the release of jobs from a pool of pending jobs into a factory
JPH09153090A (ja) 加工工程生産計画立案方法及び装置
WO2021190919A1 (de) Computerimplementiertes verfahren für eine produktionsplanung und/oder -steuerung eines produktionssystems und produktionsplanung und/oder -steuerungssystem
CN113112145A (zh) 一种数据处理方法、装置、电子设备及存储介质
CN100394417C (zh) 一种带状态性能反馈的规则调度方法及其调度系统
CN111415069B (zh) 离散制造业工序级智能实时调度方法
US5980086A (en) Facility operating method
US5170355A (en) Apparatus and a method for controlling the release of jobs from a pool of pending jobs into a factory
JPS646154A (ja) 織機配台計画自動作成装置
CN116451973B (zh) 一种基于时序递推的经编机备料计划优化方法及备料方法
Knolmayer A widely acclaimed method of load-oriented job release and its conceptual deficiencies
JPH0973482A (ja) 紡糸作業スケジュール管理装置
JPH0347339B2 (ar)
Nuttle et al. Simulation modeling of the textile supply chain. Part I: The textile-plant models
Emery Job shop scheduling by means of simulation and an optimum-seeking search
Seidmann Performance management issues in flexible manufacturing systems: an analytic perspective
CN118103786A (zh) 基于预测损害的启发式确定来管理制造过程
JPH07271858A (ja) 製織設備配台支援システム
Chen et al. A practical approach to the apparel production‐planning and scheduling problem