JPH0433325B2 - - Google Patents
Info
- Publication number
- JPH0433325B2 JPH0433325B2 JP13291987A JP13291987A JPH0433325B2 JP H0433325 B2 JPH0433325 B2 JP H0433325B2 JP 13291987 A JP13291987 A JP 13291987A JP 13291987 A JP13291987 A JP 13291987A JP H0433325 B2 JPH0433325 B2 JP H0433325B2
- Authority
- JP
- Japan
- Prior art keywords
- water
- sheet
- groove
- construction
- shielding sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Description
【発明の詳細な説明】
〔産業上の利用分野〕
この発明は地中連続遮水壁工法に関するもので
ある。[Detailed Description of the Invention] [Industrial Application Field] This invention relates to an underground continuous impermeable wall construction method.
地下構造物を施工中の地下水の湧水を防ぎ、或
いはダム工事における地下水のの止水等を目的と
して地中連続壁を構築するか、シートパイルを打
設してジヨイント部に注入を行う等の工法が採用
されている。
To prevent groundwater from springing up during construction of underground structures, or to stop groundwater from flowing during dam construction, underground continuous walls are constructed, or sheet piles are placed and injected into joints. construction method has been adopted.
これらの従来の工法を止水のみを目的として構
築する場合、以下のような問題がある。 When these conventional construction methods are used only for the purpose of water stopping, the following problems arise.
○イ 地中連続壁は必要以上の壁厚を施工するのが
通常であり、施工が不必要に大がかりとなると
ともに余分なコンクリートを大量に使用して施
工費が高価である。○B Underground continuous walls are usually built with a wall thickness greater than necessary, making the construction unnecessarily large-scale and using a large amount of excess concrete, resulting in high construction costs.
○ロ シートパイルを打設してジヨイント部に注入
を行う工法も同じく施工が大がかりであり、材
料費が高価である。○B The method of driving sheet piles and pouring into the joints also requires extensive construction and is expensive in material cost.
○ハ 地中連続壁において施工費を安価にするため
に壁厚を薄く造ることも考えられるが、狭巾の
溝を掘削し得る機械もなく、例え狭巾の溝が掘
れたとしてもコンクリートの流動性が損なわれ
て均質な地中壁は完成できない。○C It is possible to make walls thinner in order to reduce construction costs for underground continuous walls, but there are no machines that can excavate narrow trenches, and even if a narrow trench can be dug, the concrete A homogeneous underground wall cannot be completed due to the loss of fluidity.
○ニ また止水の確実性及び信頼性の点で見れば、
コンクリート壁は地震時のクラツクが止水性を
損なわせ、プレキヤストコンクリートパネルや
シートパイルを使用した工法ではジヨイント部
に夾雑物、ベントナイト等を挟み込み充分な止
水性能を得ることができなかつた。○D Also, from the point of view of water stoppage certainty and reliability,
Cracks during earthquakes impair the water-stopping properties of concrete walls, and construction methods using precast concrete panels or sheet piles were unable to obtain sufficient water-stopping performance due to contaminants, bentonite, etc. being trapped in the joints.
この発明は、施工が容易であつて施工費が安価
となり、且つ止水の確実性、信頼性の高い遮水壁
を構築可能な地中連続遮水壁工法を提供すること
を目的とする。 An object of the present invention is to provide an underground continuous impermeable wall construction method that is easy to construct, has low construction cost, and can construct an impermeable wall that is highly reliable and reliable in stopping water.
この発明にかかる地中連続遮水壁工法は、地盤
に溝を形成し、この溝内に巻付け軸に巻付けた遮
水シートを垂直に降下する。巻上げ軸から遮水シ
ートを引出しながら溝方向に移動する。この遮水
シートによつて溝を巾方向左右に仕切る。溝内の
泥水を硬化、或いは溝内にソイルモルタルを充填
して遮水シートを間に挟んだ遮水壁を構築する。
In the underground continuous impermeable wall construction method according to the present invention, a groove is formed in the ground, and the impermeable sheet wrapped around a shaft is vertically lowered into the groove. Move in the direction of the groove while pulling out the water shielding sheet from the winding shaft. This water-blocking sheet partitions the groove into left and right sides in the width direction. A water-shielding wall is constructed by hardening the muddy water in the trench or filling the trench with soil mortar and sandwiching a water-shielding sheet between them.
溝掘削、遮水シート配設、泥水固化、或いはソ
イルモルタル充填という施工であり、施工が大が
かりにならず、簡易となる。 The construction involves digging trenches, installing a water-shielding sheet, solidifying mud, or filling with soil mortar, making the construction simple and unnecessary.
遮水シートを配設したため、クラツク等とは無
関係に止水性が確保される。 Because a water-blocking sheet is installed, water-blocking properties are ensured regardless of cracks, etc.
以下、図に示す一実施例に基づきこの発明を詳
細に説明する。
Hereinafter, this invention will be explained in detail based on an embodiment shown in the drawings.
<1> 溝掘削
地盤に溝1を掘削する。溝1の巾は大きくな
くともよく、その分施工が大がかりとならな
い。溝1掘削にはオーガー等を使用し、溝1内
には安定液として泥水2を充填する。<1> Trench excavation Excavate trench 1 in the ground. The width of the groove 1 does not need to be large, so the construction does not require a large scale. An auger or the like is used to excavate the groove 1, and the groove 1 is filled with muddy water 2 as a stabilizing liquid.
<2> 遮水シート
遮水シート3はポリエチレンシート等が採用
でき、一端全長は長尺棒状のシートジヨイナー
4に接着されている。他端の全長は断面C字状
の長尺のシートジヨイナー5に接着されてい
る。尚、遮水シート3にはシートジヨイナー5
近くにポケツト状の縫込パツカー9が形成され
ている。<2> Water-shielding sheet The water-shielding sheet 3 can be made of polyethylene sheet, etc., and one end of the entire length is glued to a long rod-shaped sheet jointer 4. The entire length of the other end is bonded to a long sheet joiner 5 having a C-shaped cross section. In addition, the water-shielding sheet 3 is equipped with a sheet joiner 5.
A pocket-shaped sewn-in packer 9 is formed nearby.
この遮水シート3を巻上げ軸である引込ジヨ
イナー6に巻付ける。引込ジヨイナー6は長尺
棒状であつて、上下端に回転可能なリング7,
7が取付けられ、このリング7,7にワイヤ取
付部8,8が突設されている。前記断面C字状
のシートジヨイナー5内に引込ジヨイナー6を
嵌合し、引込ジヨイナー6外周に第6図のよう
に遮水シート3を巻付ける。 This water-shielding sheet 3 is wound around a retraction jointer 6 that is a winding shaft. The retractable jointer 6 has a long rod shape, and has rotatable rings 7 at the upper and lower ends.
7 is attached, and wire attachment portions 8, 8 are provided protruding from the rings 7, 7. The retractable joiner 6 is fitted into the sheet joiner 5 having a C-shaped cross section, and the water-blocking sheet 3 is wrapped around the outer periphery of the retractable joiner 6 as shown in FIG.
前記引込ジヨイナー6のワイヤ取付部8,8
にワイヤ10,10を結びつけ、このワイヤ1
0,10を円筒状の引込ポスト11のシーブ1
2,12にかける。ワイヤ10,10は引込ポ
スト11上方に伸ばす。 Wire attachment portions 8, 8 of the retractable jointer 6
Connect wires 10, 10 to
0,10 is the sheave 1 of the cylindrical retraction post 11
2, 12. The wires 10, 10 extend above the retraction post 11.
<3> 遮水シート降下(第1図)
遮水シート3を溝1内に降下する。上記した
ように引込ジヨイナー6に巻付けた遮水シート
3と引込ポスト11を溝1内に降下する。遮水
シート3と引込ポスト11は一定距離離して降
下するものであつて、既に配設した遮水シート
3があれば、シートジヨイナー5を既設の遮水
シート3の引込ジヨイナー6内に嵌合して連結
する。<3> Lowering the water-shielding sheet (Fig. 1) The water-shielding sheet 3 is lowered into the groove 1. The water-blocking sheet 3 and the retraction post 11 wrapped around the retraction jointer 6 as described above are lowered into the groove 1. The water-shielding sheet 3 and the retraction post 11 are lowered apart from each other by a certain distance, and if there is a water-shielding sheet 3 already installed, the sheet jointer 5 is fitted into the retraction-joyner 6 of the existing water-shielding sheet 3. Combine and connect.
<4> 遮水シート配設(第2図)
引込ポスト11の上方に伸ばしたワイヤ1
0,10を引いて巻上げ軸である引込ジヨイナ
ー6を引込ポスト11方向へ引寄せる。引込ジ
ヨイナー6を移動するにつれて遮水シート3を
引出し、溝1を巾方向左右に仕切るように溝1
内に配設する。<4> Waterproof sheet arrangement (Fig. 2) Wire 1 extended above the retraction post 11
0 and 10 to pull the retraction joiner 6, which is the winding shaft, toward the retraction post 11. As the retractable jointer 6 is moved, the water-blocking sheet 3 is pulled out, and the groove 1 is separated so as to partition the groove 1 into left and right sides in the width direction.
Placed within.
<5> パツカー(第3図)
前記遮水シート3の縫込パツカー9内に水或
いは空気を注入して溝1を仕切る。<5> Packer (FIG. 3) Water or air is injected into the sewn-in packer 9 of the water-blocking sheet 3 to partition the groove 1.
<6> 泥水固化(第4図)
パツカー9によつて仕切つた溝1の泥水2内
にモルタル、コンクリート等の硬化材を注入し
て泥水を固化し、遮水壁を構築する。<6> Solidification of muddy water (Fig. 4) A hardening material such as mortar or concrete is injected into the muddy water 2 in the trench 1 partitioned by the pack car 9 to solidify the muddy water and construct an impermeable wall.
泥水固化後、引込ポスト11と引込ジヨイナ
ー6を溝1から引上げる。 After the muddy water solidifies, the retraction post 11 and the retraction jointer 6 are pulled up from the groove 1.
岩等の自立性の良い土質の場合は、泥水を必
要とせず無水掘削が可能であり、シート配設後
の溝内の充填剤は泥水固化でなく、ソイルモル
タルを流入充填させる。 In the case of soil with good self-supporting properties such as rocks, waterless excavation is possible without the need for muddy water, and the filler in the trench after sheet placement is not solidified with muddy water, but filled with soil mortar.
この発明は以上のような構成を有し、以下のよ
うな効果を得ることができる。
The present invention has the above configuration and can obtain the following effects.
○イ 溝を掘削し、遮水シートを配設し、泥水を固
化、或いはソイルモルタルを充填するだけであ
るため、施工は容易となり、大がかりな施工は
不要で施工費は安価となる。○B. Construction is easy, as it only involves digging a trench, placing a water-blocking sheet, solidifying muddy water, or filling it with soil mortar, and there is no need for large-scale construction, resulting in low construction costs.
○ロ 完成した遮水壁は内側に遮水シートを挟み込
むため、地震等によるクラツクが発生しても止
水が損なわれることがなく、確実性、信頼性が
高くなる。○B The completed water-shielding wall will have a water-shielding sheet sandwiched inside it, so even if cracks occur due to earthquakes, water-stopping will not be impaired, and reliability and reliability will be high.
○ハ 泥水を固化、或いはソイルモルタルを充填し
て構築するため、地中壁全体を均一な地中壁と
することができる。また例え強度の低下する部
分が生じても上記のように遮水シートによつて
止水性は確保される。○C Because it is constructed by solidifying muddy water or filling it with soil mortar, the entire underground wall can be made into a uniform underground wall. Furthermore, even if there is a portion where the strength is reduced, water-stopping properties are ensured by the water-blocking sheet as described above.
第1図〜第4図はこの発明に係る地中連続遮水
壁工法の施工順序の一実施例であつて、()は
平面図、()はその縦断面図、第5図は遮水シ
ートの斜視図、第6図はその巻上げた状態の平面
図、第7図は遮水シートと引込ポストの斜視図で
ある。
1……溝、2……泥水、3……遮水シート、4
……シートジヨイナー、5……シートジヨイナ
ー、6……引込ジヨイナー、9……縫込パツカ
ー、10……ワイヤ、11……引込ポスト。
Figures 1 to 4 show an example of the construction order of the underground continuous impermeable wall construction method according to the present invention, in which () is a plan view, () is a vertical cross-sectional view, and Fig. 5 is an impermeable wall. FIG. 6 is a perspective view of the sheet, FIG. 6 is a plan view of the rolled up state, and FIG. 7 is a perspective view of the water-blocking sheet and the retractable post. 1...Gutter, 2...Muddy water, 3...Waterproof sheet, 4
... Seat joiner, 5... Seat joiner, 6... Retractable joiner, 9... Sewing jointer, 10... Wire, 11... Retractable post.
Claims (1)
水シートを垂直に降下し、巻上げ軸から遮水シー
トを引出しながら溝方向に移動して溝を巾方向左
右に仕切るよう溝内に遮水シートを配設し、溝内
の泥水を硬化、或いは溝内にソイルモルタルを充
填して遮水シートを間に挟んだ遮水壁を構築する
ことを特徴とする地中連続遮水壁工法。1. Lower the water-shielding sheet wrapped around the winding shaft vertically into the groove formed in the ground, move it toward the groove while pulling out the water-shielding sheet from the hoisting shaft, and roll it into the groove so as to partition the groove into left and right sides in the width direction. An underground continuous impermeable wall characterized by constructing an impermeable wall with an impermeable sheet in between by arranging an impermeable sheet and hardening the muddy water in the trench, or by filling the groove with soil mortar. Construction method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13291987A JPS63297625A (en) | 1987-05-28 | 1987-05-28 | Underground continuous cut-off wall construction work |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13291987A JPS63297625A (en) | 1987-05-28 | 1987-05-28 | Underground continuous cut-off wall construction work |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63297625A JPS63297625A (en) | 1988-12-05 |
| JPH0433325B2 true JPH0433325B2 (en) | 1992-06-02 |
Family
ID=15092578
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP13291987A Granted JPS63297625A (en) | 1987-05-28 | 1987-05-28 | Underground continuous cut-off wall construction work |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS63297625A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5685668A (en) * | 1994-09-07 | 1997-11-11 | Justice; Donald R. | Barrier wall installation system |
-
1987
- 1987-05-28 JP JP13291987A patent/JPS63297625A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63297625A (en) | 1988-12-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103572755B (en) | Prestressed concrete prefabricated pile | |
| CN210597399U (en) | Post-cast strip structure applied to basement outer wall | |
| JPH0433325B2 (en) | ||
| CN218405412U (en) | Short pile casing for cast-in-place pile to penetrate through underground waste hollow building | |
| JPH11217824A (en) | Execution method of underground impervious wall | |
| CN211200383U (en) | Auxiliary structure for removing pile foundation in shield tunnel range | |
| JP3418144B2 (en) | Connection method between human hole and pipe | |
| JPH0433326B2 (en) | ||
| JP2001173135A (en) | Underground outer wall of structure and its construction method | |
| JPH0438248B2 (en) | ||
| JPH0442496B2 (en) | ||
| JPH0647821B2 (en) | Construction method of continuous underground wall and steel panel for continuous underground wall construction | |
| JP2565452B2 (en) | Construction method of self-supporting retaining wall | |
| JP2764482B2 (en) | Construction method of large depth human hole | |
| JP2693028B2 (en) | Construction method of human hole in middle of pipeline | |
| JP2605941B2 (en) | Construction method for underground structures | |
| JPS63304831A (en) | Construction work of underground continuous cut-off wall | |
| JPH0442495B2 (en) | ||
| JPS6320968B2 (en) | ||
| JP3292824B2 (en) | Burial method of pipe | |
| JPS6313487B2 (en) | ||
| JPH0786229B2 (en) | Impermeable wall using impermeable sheet, construction method thereof, and impermeable sheet used for impermeable wall | |
| JP2739496B2 (en) | Underground dam structure | |
| JPH0314998B2 (en) | ||
| CN113373936A (en) | Assembly type structure and construction method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |